HomeMy WebLinkAbout770013_Sludge Survey Dates_20190412 ' � {-<tl,tbVtU
n� DEQIDWR
ROY COOPER
,d __litt ,"4 A P K r 2019
Governor ' ".
MICHAEL S.REGAN ,r
Secretary ;ftauwr.d+ WtitROa7
LINDA CULPEPPER NORTH CAROLINA FAYETTEVILLEREGIONALOFFICE
Director Environmental Quality
April 12, 2019
David Sullivan
Sullivan Poultry
342 Linwood Ln
Rockingham, NC 28379
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS770013
Sullivan Poultry
Animal Waste Management System
Richmond County
Dear David Sullivan:
The Division of Water Resources (Division) received your sludge survey information on March
19, 2019. With the survey results, you requested an extension of the sludge survey requirement
for the lagoon at Sullivan Poultry facility. Due to the amounts of treatment volume available, the
Division agrees that a sludge survey is not needed until December 31, 2022.
The next sludge survey for the lagoon at Sullivan Poultry should be performed before December
31, 2022. Please retain this letter and keep it with your farm records for reference.
Please call me at (919) 707-3665 if you have any questions.
Sincerely,
.Zi to 4 .4.T4GV73a0
Miressa D. Garoma
Animal Feeding Operations Program
cc: Fayetteville Regional Office, Water Quality Regional Operations Section
Permit File AWS770013
Q- North Carolina Department of Environmental Quality I Division of Water Resources
roca+rH t�v D.
"`'fff///Q 512 North Salisbury Street 11636 Mail Service Center I Raleigh North Carolina 27699-1636
44::=a1="'° '� , 919.707.9000