Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20081579 Ver 1_401 Application_20100517
CESAS-CD-PSP (415-10c) () 8-1S` 0q v?., DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS POPE AIR FORCE BASE RESIDENT OFFICE 527 INTERCEPTOR ROAD POPE AIR FORCE BASE, NC 28308 PAT 91 6r_2 @ Eg? a W@ 0 MAYIi2010 MM-MMROMITY 11 May 2010 MEMORANDUM FOR: North Carolina Department of Water Quality, ATTN: Ian McMillan SUBJECT: Request Modification to the 401 Water Quality Certification with Additional Conditions dated June 8, 2009, reference the DWQ Project # 20081579; USACE Action ID. No. 2007-04036 1. Enclosed is the documentation to support a request for modification to the NCDENR DWQ 401 Water Certification for Project # 20081579; USACE Action ID. No. 2007-04036 Little River (030614, 18-23-(15.5), WSIII). The authorized Certification No. is 3794 issued to Mr. Gregory Bean of Fort Bragg dated June 8, 2009. This Certification replaces the Certification issued on May 13, 2009. This change is required address environmental issues found during a recent site visit conducted by state and federal regulatory personnel. During the visit, 2 areas were found that needed to be addressed. 2. The design purpose for the first impacted area was to widen the main highway at a location running parallel and north of Vass Road at Culvert #15 (Plate Reference Number CE-101) in the vicinity of the main entrance to the new Ammo Supply point at Pope AFB. The widening of the road was necessary to comply with state traffic codes and safety requirements. The impact to the wetlands area (.04172 acres) was unavoidable. Widening the road at that location was predicated on traffic sight safety and stoppage distances coupled with a turn lane for ammo trucks. The road was widened to allow for safe passage of normal traffic while ammo vehicles turned into the supply point. The entry point and turn lane could not be shifted without posing an increased traffic safety risk based on available sight distances and local terrain along with potential impacts to other wetlands in the vicinity. 3. The second impacted area is located at the southern end of a utility corridor in vicinity of the west side of Magazine Road B at centerline station 16+00 (Plate Reference Number CE-130). This area required clearing, grubbing and fine grading in-order to install required security fence and lighting. In addition, this utility lane will be utilized as a construction access corridor to support required construction. The impacted wetlands (.02900 acres) pass through the south end at coordinates N524,841.20/E1,983,554.97. In order to avoid impairing the normal flows and circulation pattern within this area of wetland, the addition of a 20' long 8" PVC pipe will be placed in the area and backfilled with 29.6 cubic yards of fill for cover as shown on the attached drawing. Inlet protection will be added at the entrance section of the pipe as shown. A stilling pool with outlet protection will be added at the outlet end of the pipe. (See drawings CE-130 and CS-130). At the end of the project, this area will be remediated to conditions existing prior to construction. The temporary road will be removed from service sixty (60) days from completion of the project. The projected date for this action is 01 Mar 2011. The fill, pipe, inlet/outlet protection will be removed also. The restoration plan for the area will be to restore it to its -2- original grades and condition and seed with appropriate wetland seed for the site. In addition (per email guidance from Erich L. Hoffman, Senior Wildlife Biologist, DPW-Environmental Management Branch dated 5/6/2010) a fine (light) layer of pine straw will be placed on top of the seeded area. 4. Point contact is Mr. Kamalbake at 907-3130 ext 203. vtt4 M? CPC , Encls Gregory H. Beers, P.E.??!` Pope AFB Resident Engineer Memo #003 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS,UNITED STATES ARMY GARRISON, FT BRAGG 2176 REILLY ROAD, STOP A FORT BRAGG, NORTH CAROLINA 28310-5000 May 10, 2010 Directorate of Public Works Ms. Cyndi Karoly North Carolina Division of Water Quality 401/Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Ms. Karoly: Enclosed is a request to modify a prior approved 401 Water- Certification with Additional Conditions, dated June 8, 2009 for the Pope Air Force Base Ammunitions Supply Point, Cumberland County. The Division of Water Quality Project number is 20081579; United States Army of Corps Engineer Action identification number is 2007-04036. The purpose for this modification requests stems from two areas of additional impacts to wetlands that were not identified in the original Fort Bragg 404/401 permit application. The 1st area of additional impacts was due to a temporary road the contractor constructed for the purpose of constructing an 8-inch pipe, which was required for the project. See Plate CE-130. The approximate total of temporary impacts to riparian wetlands is 0.02926986 acres. After completion of this utility line requirement the contractor will remove the temporary fill and return to impacted area to the original contours. In addition, the area will be stabilized and revegetated with the Fort Bragg approved riparian seed mix. The 2d area of impact was caused by the construction expansion of the entrance way off Vass Road to accommodate a required turning lane for traffic. This lane was required due to traffic safety requirements. See Plate CE-110. The , permanent fill impacted approximately 0.04172 acres of riparian wetlands. The areas adjacent to the impacted wetland will be graded stabilized and revegetated with the appropriate approved Fort Bragg seed mix. Note: This area was never delineated under the original wetland survey for jurisdiction wetlands -2- because the turning lane is outside of what was considered the original Pope/Fort Bragg Ammunition Supply Point boundary. The contractor was unaware wetlands occurred north of Vass Road. If you have any further questions, please contact Mr. Erich Hoffman at (910) 432-4505 or erich.hoffman@us.army.mil. Sincere , Gregory G. Bean Director of Public Works Enclosure N- I L PROGRAM February 19, 2009 Gregory Bean Directorate: Public Works IMSE-BRG-PW, 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Project: Fort Bragg New ASP County: Cumberland The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program (NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. Yon-must also comply with all otherstate federsl-or local This acceptance is valid for nine months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 Permit/401 Certification/CANIA permit within this time frame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authorized work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation are summarized in the following table. River Basin CU Location Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer 11 (Sq. Ft.) Impact Ca e Fear 03030004 Cold 0 Cool Warm Riparian Non-Ri arian Coastal Marsh p . 0 964 4.83 0 0 0 0 Credits Cape Fear 03030004 0 0 964 9.66 0 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N.C. Department of Environment and Natural Resources and the U.S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Valerie Mitchener at (919) 715-1973. cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Ronnie Smith, USACE-Wilmington Ken Averitte, NCDWQ-Washington Michael O-Rourke, agent Eric Hoffman, Fort Bragg File Expiration of Acceptance: November 19, 2009 Sincerely, W m D. Gilmore, PE Director. iWtorr,t,tg... E ... Prot" 014.r ltate &jiL, iCDENR North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Ralefgh, NC 27699-1652 / 919-715-0476 / www.nceep.net -Ecosystem PROGRAM. INVOICE (modified) June 9, 2009 Gregory Bean Directorate: Public Works IMSE-BRG-PW, 2175 Reilly Road Stop A FortBragg, NC 28310-5000 Project: Fort Bragg New ASP County: Cumberland DWQ# 08-1579 COE#: 2007-00436 (as modified) EEP #: ILF-2008-6585/ IMS# 20295 Location: Cape Fear 03030004 invoice expires: August 9, 2009 You have elected to satisfy the compensatory mitigation requirements of the Section 401/404/CAMA permit(s) issued for the above referenced project through payment of a fee to the North Carolina Ecosystem Enhancement Program (NCEEP). In accordance with 15A NCAC 2H.0500, the amount you owe is based upon the 2008-09 Fee Schedule and has been calculated as follows (Please note: payment for wetlands is calculated in increments of 0.25 acres). If you have any questions concerning this payment, please call Kelly Williams at (919) 716-1921. Habitat Type Invoiced Amount Fee Schedule Cost Riparian Wetlands 9.75 acres x $ 59,600.00 = $581,100.00 Stream 964 linear feet x $ 323.00 = $311,372.00 TOTAL AMOUNT DUE if paid within 60 days $892,472.00 If payment is not received within 60 days of the date of this invoice, it will expire. Note that your permit(s) may require payment before this date. Subsequent invoices will be based on the fee schedule in effect on the date they are issued. Please send a check payable to NCEEP for the Total Amount Due to the appropriate address below and enclose a copy of this invoice. US Mail: NCDENR Ecosystem Enhancement Program 1652 Mail Service Center Raleigh, NC 27699-1652 Physical Address (for other delivery services): NCDENR Ecosystem Enhancement Program 2728 Capital Boulevard, Suite 1H 103 Raleigh, NC 27604 Please note that requests for reimbursement of payments made to NCEEP are considered on a case by case basis. Requests for reimbursement must be received within 12 months of the date of the receipt. Any such request must be accompanied by letters from the permitting agencies stating that the permit and/or authorization have been rescinded and/or that NCEEP is not responsible for providing mitigation credit. If the account name on the check is not the same as the permit holder's name, please include a si ned statement by the permit holder that the check is being written on behalf of, and with full knowledge and authorization of, the permit holder. YOU MUST BE IN POSSESSION OF THE PAYMENT RECEIPT FROM NCEEP PRIOR TO COMMENCING THE ACTIVITIES AUTHORIZED BY THE DEPARTMENT OF ARMY 404 PERMIT AND/OR THE 401 WATER QUALITY CERTIFICATION. cc: Cyndi Karoly, NCDWQ Wetlands/401 Unit Richard Spencer, USACE-Wilmington, Thelma Hemmingway, USACE-Wilmington Michael O'Rourke, agent File ',estoYU?... E ... Protee "'i Our State kyxfl NCDENR A L s/ North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.nceep.net &VA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director June 8, 2009 Mr. Gregory Bean, Director of Public Works Fort Bragg IMSE-BRG-PW, 2175 Reilly Road Stop A Port Bragg, NC 28310-5000 Re: Pope Sir Force Base Ammunition Supply Point, Cumberland County DWQ Project # 20081579; USACE Action ID. No. 2007-04036 Little River [030614, 18-23-(15.5), WSUI] APPROVAL of 401 Water Quality Certification with Additional Conditions Dear Mr. Bean: Dee Freeman Secretary Attached hereto is a copy of Certification No. 3794 issued to Mr. Gregory Bean of Fort Bragg, Inc., dated June 8, 2009. This Certification replaces the Certification issued on May 13, 2009. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. If we can be of further assistance, do not hesitate to contact us. CHS/cbk/Um Sincerely, Coleen Sullins Attachments: Certificate of Completion NC DWQ 401 WQC Sumn3ary of Permitted Impacts and Mitigation Requirements cc: Becky Pox, EPA, 1307 Firefly Road, Whittier, NC 28789 Michael O'Rouke, The Louis Berger Group, 101 Wade Avenue, Suite 400, Raleigh, NC 27605 Ronnie Smith, Wilmington Dlsti-ict, USACOE Ken Averitte, DWQ, Fayetteville Regional Office DLR, Fayetteville Regional Office Pile Copy Filename: 081579PopcAPl3AnununitionSupptyPlant(Cumberland)401 _IC 401 OversightlExpress Review Permitting Unit 1650 tvlail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919.733-6893 Internet: hHp:llh2o,enr.state.nc.Lls/nc;retiands/ One NorthCarolina An Equal Opportunity l Affrmalive Action Emp'oyer Fort Bragg Page 2 of 6 June 8, 2009 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2I-I, Section .0500 to Mr. Gregory Bean of Fort Bragg to fill 4.83 acres of 404/wetland and 964 linear feet of perennial stream in Cape Fear River Basin, associated with the construction of the proposed new a Ammo Supply Point (ASP) at the site in Fort Bragg, Cumberland County, North Carolina, pursuant to an application filed on the 29°i clay of January of 2009 (received by the DWQ on February 11, 2009, and in additional correspondences received on March 4, 2009, March 13, 2009, and April 29, 2009) and by Public Notice issued by the USACE on November 20, 2008, and received by the DWQ on November 20, 2008. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth, This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2I1 .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification may be required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type of hi pact Amount Approved Units Plan Location or Reference 404/401 Wetlands 4.83 (acres) Application and Public Notice Stream (perennial) 964 (linear feet) Application and Public Notice Sediment and Erosion Control: 2. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Cono-ol Planning and Design Manual. Fort Bragg Page 3 of 6 June 8, 2009 b. 'file design, installation, operation, and maintenance of the sediment and eroston control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Conh•ol d borrow pitssites, and ledsesites, itiianual. The devices shall bemaintained actor'oconstruction waste pile (spoil) projects, including onh- associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface iIllining OvIanual. d, Tile reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. areas No waste, spoil, solids, or fill of any kind occur in wetlands, Application. aAllsconstpaction activ tiesotld the footprint of the impacts depicted to the including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur; prior Sediment and erosion co. If shall of sediment and erosion control devices inlwetlands and approval from the Dtvtsionot placement waters is unavoidable, design and placement of temporary erosion control measures earn b eds shall not be conducted in a manner that inay structures. ` Allasedin enttand e oston banks, adjacent to or upstream and down steam control devices shall be removed and the natural grade restored within two (2) months of the (late that the Division of Land Resources or locally delegated program has released the project. Construction Stormwater Permit NCG010000 Land Upon the approval of an Erosion and S o 11 erosions Control Plan issd by co trios pDigratns Ol NPDES Resources (DLR) or a DLR delegated local lly General stormwater permit (NCGO s000o0) 1`dater to be discharged duaing?land d sturbinglconstruction project. This General Permit also activities as stipulated by conditisthin te permit. at disturb one (i) ortmo project acres], full con pliance w tih permit [applicable to construction projects conditions including the sedimentation control plan, self-monitoring, record keeping and reporting requirements are required. A copy of this permit and monitoring report forms may be found at Its :1112o.enr'.state.nc.us/su/Ia'rrrs Doctunents./tint. 6. "Re-opener" Clause Mr. Gregory Bean and Fort Bragg s?t?n its authorized (including any requirements resulti lg from compliance consistent with State water quality law ', with section 303(d) of the Clean Water Act) and shall require ?tst?osntractorsr(and/ortag ilts) to co npiy federal law. Mr, Gregory Bean and Fort Bragg with all of the terms of this Certification, shall provide shall be included Certifictlluded inttheconstruction ?gconlract copy of this Certification. A copy of this ards or not and available on the job site attimes. If DWQ determines that stain a designated or achieved use) oa tdhat State or federal law is being met (including the failure being violated, or that further conditions are necessary to assure co?npliance, DWQ may reevaluate and modify this Port Bragg Pagc 4 of 6 June 8, 2009 certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with I5A NCAC 2H.0507(d). Before modifying the certification, DWQ shall notify Mr. Gregory Bean and Fort Bragg and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 21-1.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Gregory Bean and Port Bragg in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. Continuing Compliance: Mr. Gregory Bean and Port Bragg shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State law and federal law. If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 21-1.0507(d). Before modifying the Certification, the Division shall notify Mr. Gregory Bean and Port Bragg and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public heating in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to Mr. Gregory Bean and Port Bragg in writing, shall be provided to the United States Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project; Mitigation: 8. Compensatory Mitigation Using the Ecosystem Enhancement Program (EEP) Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you wish to make a payment to the Wetlands Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 733-5205 if you have any questions concerning payment into a restoration fund. You have 60 (lays from the date of this approval to make this payment. For accounting purposes, this Authorization Certificate authorizes payment into the Wetlands Restoration Fund to meet the following compensatory mitigation requirement: ff f Im act ds Com ren sator Miti ation Re uired 4.83 (acres) River and Sub-basin Number Ca e Pear/03030004 Oereniial) 964 (linear feet) Cape Fear/030300041 9. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (httu://NvwNv.ncdot.org/clop/operations/BMP manual/download/BMP Manual &?Lo such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Fort Bragg Page 5 of 6 June 8, 2009 Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re- established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis- equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structwres. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to clocument correct installation along with the Certificate of Completion form. 10. Protective Fencing The outside wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities. 11, Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Also, this approval to procced With your proposed impacts or to conduct impacts to Waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. Fort Bragg Page 6 of 6 June 8, 2009 If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 80i day of June 2 DIVI- I N OF W ' CR ALITY J -Coleen Sullins CHS/cbk/Um 3794 NODE 1R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director North Carolina Division of Water Quality 401 Water Quality Certification Summary of Permitted Impacts and Mitigation Requirements In accordance with 15A NCAC 2H.0500, Mr. Gregoty Bean of Fort Bragg, have permission to fill or otherwise impact 4.83 acres of 404Avetland and 96LI linear feet of perennial stream associated with the construction of the proposed new a Ammo Supply Point (ASP) at the site in Fort Bragg, Cumberland County, North Carolina. All activities associated with these authorized impacts must be conducted with the conditions listed in the attached Permit transmittal letter. THIS CERTIFICATION IS NOT VALID WITHOUT THE ATTACHMENTS. COMPENSATORY MITIGATION REQUIREMENTS, ECOSYSTEM ENHANCEMENT PROGRAM NC EEP, NAME Fort Bragg New ASP DWQ PROJECT H: 20081579 LOCATION: Fort Bragg COUNTY Cumberland BASIN/ SUB BASIN Cape Fear/03030004 Dee Freernan Secretary As required by 15A NCAC 2110500, and the conditions of this Certification, you are required to compensate for the above mitigabee inpacts through the restoration, creation, enhancement or preservation of wetlands, surface waters and riparian buffers as outlined below prior to conducting any activities that impact or degrade the waters of the state. Note: Acreage requirements proposed to be mitigated through the Ecosystem Enhancement Program must be rounded to one-quarter acre increments and linear foot requirements must be rounded up to the nearest foot according to 15 2R.0503(b). Impacts Mitigation 4.83 Acres of 404/Wetlands 4.83 Acres of 404/Wetlands 964 Linear Feet.Of Perennial Stream 964 Linear Feet OF Perennial Stream One of the options you have available to satisfy the compensatory mitigation requirement is through the payment of a fee to the Wetlands Restoration Fund Per NCAC 2R.0503. If you choose this option, please sign this Form and mail the form along with a copy of your 401 Certification or Buffer Approval to the Ecosystem Enhancement Program at the address below. An invoice for the appropriate amount of payment will be sent to you upon receipt of this form. PLEASE NOTE, THE ABOVE IMPACTS ARE NOT AUTI-IOIUZED UNTIL YOU RECEIVE NOTIFICATION THAT YOUR PAYMENT HAS BEEN PROCESSED BY THE ECOSYTEM ENHANCMENT PROGRAM. Signature Date ECOSYSTEM ENHANCEMENT PROGRAM 1652 Mail Service Center RALEIGH, N.C. 27699-1652 (919) 716-1921 Filename: 081 579PopcAFBAnununitionSupplyPlant(Ctunberland)401_IC_EEP 401 Oversight/Express Review Permitting Unit 1650 trlail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-1786 1 FAX: 919-733-6893 Interne!: htlp://h2o.enr.s!ate.nc.us/navetlands/ One NorthCarolina Nahmally An Equal opporlunily l AlGrma!i ve Aaion Employer MOWS 1A 30NVOH000V NI 03SIABH _ 111AA 3ONVOHO00V N1 CIISIA--ILI C:::_- De aWll c-oleo aloos-olno UEX„ZZ -----' - 71V0 101d 7IVOS 101d 0 7ZIS ol-01-b1Z uG!sop-lioys-oleo 7000 AH0031VO 7WVN 3IIJ 0900-0-LO-MIZ16M 3AOH NVA dd3r :'ON lOVH1NOO IAa a311IWans £lZ9 X-LO NIIZI6M OOr 111c, 101d1S10 HHNNVAHS ON NOI1.V110rlOS Aa 0510 M NMO SH33NIJNl ?0 SdH00 vmu *r ANNVO 101H1S10 H33NI!JN3 ANHH'S'n 900Z 83HW3AON 71VO Aa 03NOIS30 <r ul 3 ro z J LU Z Y O I W U p I O O W O U U z 0 d- `Z LLI R W Q z w O cl? a cl U w I? O O W WC J Q J {- Z w cq Hi rn O -: C\j II ???--!I 0 0 0 0 L 0000 O (f) ?j ?l Il_I? I 0 0 0 0 \J U I? u? r 'L -7n J V, ? r (Ir N lU ?? •\ N \ etl -? C\ cl• 6 L? LIJ ?L -<5? J2O U W A 3 !. H:-R-1v o N\'-Id IMUNOO INDtNICIDS nNV NOISM-1D U cc - LL W 6 m \ O a- LIJ LL _ I _A N wz 1NI0cl AlddnS NOI.I.ININNV Llj VNIIOHVO H1HON JO\ HFl J.HOJ z h= LLLL.. \• _l U bs ,e I, In C3 -0 IA cr r? r-M r m ?I?? Zt- Qt'. V Q c? r 7- o I.f ?n ? j o ?Q NM m ?q- LJ M o .9 p0 z: r) 60 Q?N ? a In o' ?n 7 1 ?9 / N ? I ?u W ZllU11 11t1W c??? Iv -;L l ll It l z LLI n" U) N Cf) z Qz 00 O . J r. - t 145 y?`i? \ ` ! • 1 inn n. x Z:: !? l.J Iy1 \ i 4 \ lrr ..? •.. / n vi ?• Cl) O -- o N Cl) ts" C- (.n M1 00 4o 0_ C 0- CC J N ?0LLI SOS I.I_I U m o UJ La ?i _W U W d < Z z ~ Of z N W o V) n o rn ? 49 L1 L? M 47 L7 xo GIN 1 e uw raw a,ne La'w aMins 9mo woo;ta -? 9ild 0900 [t-L 0-NN216M iln x Lo r«tls. wnr s+r nN Iqurld'.'K .e aa? w Nwr Stl33Nl`.)N3 - . ?ti] i s•. LJIIitS? x3awl N .uvtrv S aooz •ai.3naN v Of V3NV NV Id lno,\vl m r 1 tlM k7W) IJLlx.%N Z------ .- 0 ? a f= ? U LU I I a W = w~ =W N= W W N V) T W _ NouvnNIINOO HOd K L-SO 33S, 3NII HOi" \ D'Ji^ I [` w O N Ol M q / N m N45 ZN ? `m4 .- q J N ? OI\I oz w z N _? Z W h I V I[Ni N a-? Z w m 8+. n a z w LU ?? 2 W za mlcncpp ?'a; / ZIW ?? ??. a• / ? ? W / I to ? ? a ??N2 inlN ??a ao ^\ sum IJ ;n pap??? ? ccpp m •- I ? ' LL O ` 0, ? a Z y OIIg Q m_O Nm am m N N? a! y? -J L'u <Z?? LLD Z•W 'a??OO?f NIO"11 ?•T 2?W -_?. m as ZQ aa ~p?.Z z w?N1?Q,N8, °'a- z w '° + Wm Q-0 F m N a I ?Q y F ': a m' n OVUpmO ' zlw In ? ? a z w z ?i YN? y o 0 9 > 0 y Q N W g Q _ N SSQNfwAtl LL 1=- :- z0 Ix pr N w O l•') ? M Q 0 w m n N F V ; N U z w z W J X w o / n w m 4ia.i W U Z F C6 „Qi W r$ N $ x m Ri N .- IA q _ \ o O Y \ WAN m C 7_ 9x mm \\ "'? Ua? w1o g \\ z w xz ?N N N Q F W K N M M':? p mos \ co 1- w U w_ \ N LL )j! \ O ?N NN O \ f " •\I N Z W? 14 N? U Cl Q, of ? Z r• I N QO g'' u7 p Zw?w`n`yN ti? wPw ?zw n a a "c Z W Z W LyM(? (p?? Ur fry?? ?j j Z - Zw\\ S?OI1,(I/ UNf r• N DJII rmp \ h r- U?4 Z w Zw h.- Ua° 1 n _a O z w zd z w ?zq¢ ICU,6L .. g A w w / \ t!)08 NOW Z W,, NOUvnNI1NO3 HOd R t-SO 33S - 3NII HOLM nv o Am n w ?? W ww 9awom,A, w ?? ssti wa nqe mw a-?9 vv A D30 v ?aN Nour,?DDw N11M iSM?olm4r w W9x7Y L a-anz uo-Ibua-e?ro OE V3NV O w 3aro 110031VJ 3"""'? NVId 10HINOO iN3W103S ONV NOIS083 09D0-0-10-NNLt6N ]Adl NYA ?13f - -0N LTMInO] 'A9 Dl11MB'K ? ` oil DQ` ? a1 N Lo-t a9 M ie uMa SH33MUN3 i0 S.Moo 1NK)d AIM'S N3ib"Ww rnll r AMMO IOW1S10 833NION3 AMbV S N ' 10HV0 H1tlON nnyyu It r:_ 900E MRIADN 31r0 'AB a:MDR)D a Q Z 0 U 0 R W 0 LLI Y Q m 0 I z cr U N C3 Q W L) W Z L) O w K z w Z S "Z J) W g a o LL w w zi 0 Y J q J a ' 0 in E U l ? ? Q m W 4 ? C', a z 34t a W N MEW \' ..?% } J J 6c W w C, E Y. C)zz of U O ° z`.I - H W V03 i-mss ci \ \ \ \ \ \ \ \ \ \ 1 \ \ \ 1 1 1 I I 1 1 1 - l \ \\ \\\ \ \ 1 \ 1 1 1 \ i 1 \ 1 1 1 I I I l I 4s 1 I1 • ® 11 '?? /? 1 .? 1/_ !://?"??-/ \ \ \ \ \ \ \ \ \ 1 \ \ \ \ \ \ 1 \ zw- / \\ fir 1? 11 1 l 1 1 .11 1 \ 1 \ ? ar j At/v \ \ \ \ \ \ \ \ \ \ 1 \ 1 \ \ i n \ \ \ \ \ { \ \ \ 4? - \ 1 1 1 1 1\\ w a _ %` \\ \\+ \\ \ 1 l 1 \ 1 1 \ \ \ \ \ `\ 1/ 11\\\ \ \111 1 \1 1 \ £ 1 1 z / ?, \ l\ \ \I 1 \ ti k \I 1 \I 1 \ 1\ \\ 1?1 \\ \\ \\ ?\ \\ \ \ ®\ \\ \\ \\ \\ \`\ \\\ \\ \\W m \ •y ys . ?„ r ?' S_oz \ I 1 ? tl 1 II ?+ +\ +11\ \ \ \\ \ \\ \\ \ \\ \ \? \ \ \\`?, `\ \\ ?, \ `\ `,? \\ "? \\ ; \\ \ ?s0 `i ?? ? ? a `? •_ ,mss 1 I 1 ? 1+ 1 \I \+ it \ \+; 1 \\ \ \ \ \\ `\?\\\\ \ \\ \\ \\ `\ \\ \\ \\ \\ \\ I ?\ \\ \\© \ \\ ?. \?° ? '° ?:I ? _ - 1:- --'? -14 / J e'I I ? ?I I®I 1 ? I ? 1 1 1 \I i \ V A AV A A ?'\ \V A>\ \ ? \ \ ?A ' \ ,? v1 +o ?yY??'?' "?, 1 r I r I I I I t \ \\+ ?\ \ R+ I 1 1 \ \ v v A v t t; Q ?R \ \ \LL? ? \ 1 ? ? l? .. 1 I p?c ? I 1 ? I i I I t I I 1 11 1 ?, ? \\ I.\ \\ \\ \\ i\ O ?\.. ? `\ \\ \ \\ x U I I I I 1 I 1 \ d\ \ jF O \ W\ ,\ 1 \," x? I I I I I I I I I la 1 \® \ \ \ \ a?} \ R \? \ \ \,? \ Pz z \ _ '! r? . I I I 1 I 1 ? \ 1 1 1 \ \ \ \ w tl \ ®\ ? \ \ \ } ??o m, 1 I 1 '? i r I d I I I I" t I 1 1 d \ \?\Ln k \m\ \\ \ \ a < ? ? ? d? I 1 I 1 I I ? ? I I I I I 11 1 \ \1 \\ ®\ \ \ \ \ \\ \ \ ?\ \\; !' \ m?, \?? ?,? ?\ \\ ( \ Y; O I 4 4??l I 1 I 1 I I I I I 1 1 1 \ \ \ \ \ \ \ f? \ \ \a Q ?\ \ \ 1{1 I'/ /h / 1 ! r I I 1 1 ? 1 1 I I 1 1 \ \\ ~\ % \ \ \ \ \ \ \ W`U No\ d jo / , 1 •I I I 1 I I \\5 \\ 1\ \\ \\\\ \\ \\ \r \ \\ \\ \\ \\ \ \ lI r ®l / 1 / ! p bl / I / / v %`. V v V '9 A v ? \ 1?. + ? I I ^ I I\ / I ? ?ml IU? I 11 /?/ // /% ? ? ? l/A? !s//??/„? .?1, ?i/r ?? ``,,.'. I ?1 I r=?I J fr /? larF,l/r//r? k/, ?\? I ? I ?'iA?. ? ? ? ? v I I I I ! I I ! 11 11 I i j / ? l 1 11 II 1 b /, ! . ? / / ! 1 ! 1 ?? l 1 / 1 ! 1 ! ! / ®/ ;a V) /k ?? 11 I 1 r I I \ 1 /Z ` \\ ® I 1/ I I I 114 I 1 I`/I z h4 ?? a:9 - I I 1 1 j y I J