Loading...
HomeMy WebLinkAboutWI0300345_Injection Report_20190204TREX PROPERTIES LLC ELT TREX PROPERTIES LLC 1515 DES PERES RD.. STE 300 SAINT LOUIS. MO 63131 314-835-1515 P 314-835-1616 F February 4, 2019 Mr, Michael Rogers, PG NCDENR, Underground Injection Control Manager 1636 Mail Service Center Raleigh, NC 27699-1636 RE: Injection Report Injection Permit W10300345 Trex Properties, LLC 3114 Cullman Ave. Charlotte, NC 28206 Dear Mr. Rogers: As per your request, Trex Properties, LLC (Trex) is providing you one hard copy of the January 2019 Injection Report generated by Innovative Environmental Technologies, Inc. Trex has tentatively set the week of February 18, 2019 to collect the one -month post injection samples. Thank you for your assistance during the injection work. If you have any questions do not hesitate to give me a call at 734.751.2270. RECENED/hICI)F /DWR Best regards, David Craig Senior Project Manager Enclosure: January 2019 Injection Report FEB 13 2019 Water Qual, Reglonal OperaUor,s SGcDon 20190204L - iniection report / Routine Monitoring Report Review (RMRR) Checklist Permit No.: WI0300345 Permittee: Trex Facility Name: Fonner Tres Facility Report Name: Jan 2019 Injection Report [NOTE: this is not a RMRR; it is an injection summary report] Reviewer.: MR Date Reviewed: 4/8/19 1. BIMS: Permit Issued date: 7/21/17. Expiration date: 6/30/22. If Expired, check with Permittee if they want to renew. For Non -Discharge (ND) permit,. if they don't want to renew, they will have to request rescission. 2. BIMS: Log report in Events Tab. Select-> `Compliance Schedule Met' and enter name and date of report, and date we received. Also, note that a RMRR was completed and inserted into report. Completed: 4/8/19 3. BIMS: For 5I reports- Has Injection Event Report (IER) been received and info entered into BIMS Yes (Yes or No). If No, check file to see if we have received and then enter into BIMS. If never received, then request from Consultant and CC Permittee via email. After receipt of IERs from these parties, enter into BIMS. For Non -Discharge (ND) reports- Is billing is up to date? N/A (Yes, No, or N/A). If past due, notify Permittee/Consultant via email, and include contact info for Teresa Revis to send payment (contact info below). NC Department of Environmental Quality Division of Water Resources Budget Office Attn: Antoine Pope 1617 Mail Service Center Raleigh, NC 27699-1617 Antoine.Pope@ncdenr.gov (919) 707-3698 4. BIMS: Check Wells Tab and see if GW-is/GW-30s (if applicable) have been entered: Yes (Yes, No, or N/A). If No and well status is still `proposed', then check file to see if we have received GW-1 s and then enter into BIMS. If not received, then request from consultant and CC Permittee. After receipt from these parties, enter as -built well construction into BIMS (change status of well from proposed to active); and well abandonment data, if applicable. Continued On Other Side Page 1 of 2 Rev. 4-8-2019 5. For 5I/In-situ groundwater remediation reports- Do a quick review of report to see if there are any obvious impacts from injection activities by reading Summary and Conclusions/Recommendation Section, and monitoring data tables. Compare pre - injection levels of sulfate, iron; phosphate, etc. to post injection levels and note this below. If there are no impacts evident, indicate `No impacts from injection evident'. NOTE: The groundwater quality at the site must be monitored until concentrations meet pre -injection levels or 2L standards before the permit can eventually be Completed in BIMS, and a Completion Letter Sent to Permittee. For Non -Discharge reports- Also check influent and effluent concentrations, most permits require a minimum 95% reduction in concentrations. NOTES/COMMENTS: Rept included info on injection including site map (proposed inj well IW-16 not installed). 6. When this Monitoring Report Review is complete, securely insert inside cover of monitoring report and file. Completed: 4/8/19 (date) Page 2 of 2 Rev. 4-8-2019 North Carolina Department of Environmental Quality — Division of Water Resources INJECTION EVENT RECORD (IER) Permit Number WI0300345 L Permit Information Trex Properties Permittee Trex-Charlotte Facility Name 3114 Cullman Ave. Charlotte, NC. Mecklenburg Co. Facility Address (include County) 2. Injection Contractor Information Innovative Environmental Tech. Inc. Injection Contractor / Company Name Street Address: 6071 Easton rd. Pipersville, PA 18947 City State Zip Code (888)721-8283 Area code — Phone number 3. Well Information umbewof--Wells osea11€o ti nje tion* Well IDs: IW-1 through IW-20 Were any new wells installed during this injection event? ❑ Yes X No (7 addtnl temp. dpt.) If yes, please provide the following information: Number of Monitoring Wells Number of Injection Wells Type of Well Installed (Check applicable type): ❑ Bored ❑ Drilled ❑ Direct -Push ❑ Hand -Augured ❑ Other (specify) Please include a copy of the GW-1 form for each well installed. Were any wells abandoned during this injection event? ❑ Yes ' X No , If yes, please provide the following information: Number of Monitoring Wells Number of Injection Wells Please include a copy of the GW 30 for each well abandoned. 4. Injectant Information Sodium Persulfate, Ferric Oxide Powder, Water Injectant(s) Type (can use separate additional sheets if necessary Concentration 25-30% NPS, 2-5% FeO If the injectant is diluted please indicate the source dilution fluid: City of Charlotte Fire Hydrant �Tic�t�Vlolu�e�Inf�cte�(�ea11z69„53 Volume Injected per well (gal) 1,400-10,232 5. Injection History Injection date(s): 1/7-1/17/2019 Injection number (e.g. 3 of 5):1 of 1 Is this the last injection at this site? X Yes ❑ No I DO HEREBY CERTIFY THAT ALL THE INFORMATION ON THIS FORM IS CORRECT TO THE BEST OF MY KNOWLEDGE AND THAT THE INJECTION WAS PERFORMED WITHIN THE STANDARDS LAID OUT IN THE PERMIT. �# _1/24/2019 SIGNATURE OF INJECTION CONTRACTOR DATE Ian H. Connor Submit the original of this form to the Division of Water Resources within 30 days of injection. Form UIC-IER Attn: UIC Program, 1636 Mail Service Center, Raleigh, NC 27699-1636, Phone No. 919-807-6464 Rev. 3-1-2016 Rogers, Michael From: David Craig <dcraig@enviroanalyticsgroup.com> Sent: Thursday, January 31, 2019 1:47 PM To: Rogers, Michael Cc: Watson, Edward M Subject: [External] RE: W10300345 ISCO injection report - Trex Properties Attachments: 201901_Injection Event Record.pdf; 201901-Injection Report.pdf Mr. Rogers: Attached is a revised copy of the injection report and injection event record with the correct permit number on both documents. I will get you a hard copy of the report in the next week. Let me know if you have any questions. Thank you, David Craig EnviroAnalytics Senior Project Manager (734) 751-2270 dcraig@enviroanalyticsgroup.com http://www.enviroanalyticsciroup.com Please note the new corporate address is: 1515 Des Peres Road, Ste. 300, St. Louis, MO 63131 From: Rogers, Michael [mailto:michael.rogers@ncdenr.gov] Sent: Wednesday, January 30, 2019 12:34 PM To: David Craig <dcraig@enviroanalyticsgroup.com> Cc: Watson, Edward M <edward.watson@ncdenr.gov> Subject: W10300345 RE: [External] ISCO injection report Would you please send one hard copy. Also, put the permit number in the subject line of emails and on all correspondence. Thanks From: David Craig [mailto:dcraig@enviroanalyticsgroup.com] Sent: Wednesday, January 30, 2019 12:04 PM To: Rogers, Michael <michael.rogers@ncdenr.gov> Cc: Watson, Edward M <edward.watson@ncdenr.gov> Subject: [External] ISCO injection report External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Mr. Rogers: Attached for your records is a copy of the Injection Report and the Injection Event Record associated with the Sodium Persulfate / Ferric Oxide injection at the Trex Properties, LLC site located in Charlotte, NC. The one month post injection groundwater sampling event is tentatively scheduled for the week of 02.18.19. If you have any questions please let me know. David Craig EnviroAnalytics Group Senior Project Manager (734) 751-2270 dcraig@envi roanalyt icsgroup.com http://www.enviroonalyticsciroup.com Please note the new corporate address is: 1515 Des Peres Road, Ste. 300, St. Louis, MO 63131 Innovative Environmental lkhnologies, Inc. Technology Discussion and Field Report To Trex Properties For The Application Of "Ferric Oxide activated Persulfate" At 3114 Cullman Ave. Charlotte, NC NCDEQ UIC Permit #-WI0300345 AIMAWEDM WO,r,W - January 2019 FEB 13 2019 Water Quality Reglon8l Operations stx1jon Innovative Environmental Technologies, Inc. 6071 Easton Road Pipersville, PA 18947 (888) 721-8283 www.iet-inc.net Pipersville, PA . Columbus, OH . Concord, NC dvah WOET Contents ExecutiveSummary.................................................................................................................................. 2 Introduction............................................................................................................................................... 2 RemediationImplementation................................................................................................................ 2 InjectionProcedures............................................................................................................................ 2 Direct -Push -Driven Perforated Rod Placement.............................................................................. 3 SubsurfacePathway Development.................................................................................................... 3 Provect-OX Injection............................................................................................................................ 3 LiquidRinse........................................................................................................................................... 3 PostInjection Line Purge..................................................................................................................... 3 SiteMap.......................................................................................................................................................4 Conclusion.................................................................................................................................................. 5 AppendixA - Injection Logs.................................................................................................................... 5 11Page Trex Properties - Cullman Ave. LMI Executive Summary On behalf of Trex Properties, Innovative Environmental Technologies, Inc. (IET) has prepared the following injection report. This report has been prepared to document remediation activities conducted at the site. The injection program was implemented from January 71h to 171h 2019. The remedial approach employed the oxidation remediation product "Ferric Oxide activated Persulfate". This product pairs a self -activating oxidation persulfate chemistry while providing the appropriate components for a longer lasting biological attenuation process following the initial oxidation event. The materials introduced across 19 of 20 injection wells included 158,858 pounds of sodium persulfate, 13,826 pounds of ferric oxide powder in approximately 69,536 gallons of solution. Although several attempts were made IW-16 was not installed due to obstacles encountered prior to reaching the desired depth. Surfacing of remedial material was encountered during the implementation of the design at several of the Injection Wells; namely (IW-1, IW-2, IW-3, IW-6, IW-7, IW-10, IW-11 and IW-13). Ultimately full dosages were applied to IW-3, IW-6 and IW-7 using decreased flow and pressure and revisiting the location multiple times. IW-1 and IW-2 were not completed in full, but 7 direct push locations were installed in the area around these two locations in order to distribute the material via injection. IW-10, IW-11 and IW-13 did not receive a full dosage but IW-12 received the materials left over from these wells. IW-12 is immediately upgradient of the uninstalled IW-16 location and 10, 11 and 13 were not accepting any more volume without excessive daylighting occurring in and along the road (Cullman Ave). IW-12 shares a screened interval with IW-13 so the extra material was added there. The point by point dosages along with instances of surfacing and other field notes are noted in the attached field logs. Introduction The Cullman Ave site located in Charlotte, NC, was identified as having soils and groundwater impacted by the historical release of chlorinated hydrocarbons. An injection program was conducted by IET for the remediation of CVOC impacts in both soil and groundwater throughout the designated areas utilizing advanced oxidation technologies. Remediation Implementation Injection Procedures IET injected a total of 19 injection wells and 7 direct push locations at the Cullman Ave. site. Details regarding each injection attempt are provided in the field logs in the Appendix. 2� ; Trex Properties — Cullman Ave. QIET Direct -Push -Driven Perforated Rod Placement A Powerprobe 9500 unit comparable to the one pictured in Figure 1, was utilized to drive the injection screen (as seen in Figure 2) to depths ranging from 5 to 27 feet below ground surface (bgs). It is at these depths, that the likelihood exists of being in close proximity to the targeted waters in the more permeable layers that were identified during FIGURE 1: AMS POWER PROBE 9500 VTR characterization of the site. These more permeable layers are those believed to have historically provided the preferential pathways taken by the dissolved -phase CVOCs. Subsurface Pathway Development Compressed air was used to propel all injectants , into the subsurface. Compressed air was first injected into the subsurface at approximately IMMe 150 pounds per square inch (psi) until a significant pressure drop was observed at the injection pressure vessel. This process is referred to as pathway development. The intent of this step is to open pathways in the subsurface for FIGURE 2: RETRACTABLE INJECTION SCREEN the injectants to follow. These pathways are believed to be those more permeable pathways along which VOCs are more likely to have migrated, both in the vadose and saturated zones. Liquid and liquid -entrained injectants are then delivered with pressurized gas to the pathways that were produced during the development step. Liquid Injection A predetermined volume of the sodium persulfate and ferric oxide material was immediately injected into the subsurface fractures and voids that were developed during the compressed air injection step. Liquid Rinse A small amount of water was injected to clear the injection lines and sand packs of the injectant. Post Injection Line Purge Compressed air was injected to clear the lines of all material and to force the remedial components further into the formation before moving to the next injection location. 3 1 P a g e Trex Properties — Cullman Ave. QtIET Site Map f 1 �t �-1,t1f10 PMW-21 �PY�-i1A _A !89.600 � SOURCE / AREAF AREA FOR / Inc lKtA ,t CONTAMRMIh4ATIQN \/1 FN4 , C 43j os �--...777 �+�► DPT Locations FIGURE 3: GENERAL INJECTION IMPLEMENTATION — INJECTION LOCATIONS 41 Trex Properties — Cullman Ave. �CI�ET Conclusion The injection program at the Cullman Ave. site was implemented based on the proposed design with slight field modifications. All proposed injectants were introduced at the targeted depths. It is expected that the injection event will yield positive results and IET looks forward the assessing the data following future sampling events. Appendix A - Injection Logs AdCt+����vR FEB 13 2 r f'? Water iifi owlOperwv 5 1 P a g e Trex Properties — Cullman Ave. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/10,1/12/2019 Time of Injection: to Well ID IW-1 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 6-26' 6-26' Duration of Fracture (seconds): 20 Pressure of Pre -injection pathway development 75 Estimated Radius of Influence 12.5 Pounds of Sodium Persulfate 8363 8363 Pounds of Ferric Oxide 725 725 Gallons of Solution 3658 3658 Pressure of Post -injection pathway dev. 50 Odors: Field Observations: Well was attempted 1/10 daylighting i casing with bentonite and re-attemptec utilized in place of this iniection well. unediately from around well 1/12 daylightinR immediatle, attempted to seal top of Direct hush iniection p+ T1, [NO A - RONI MAL ` ECHNOLOWES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/10,1/12/2019 Time of Injection: 14:16 to Well ID IW-2 17:45 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 6-26' 6-26' 6-26' 6-26' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 3200 8363 3200 8363 Pounds of Ferric Oxide 277 725 277 725 Gallons of Solution 1400 3658 1400 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Daylighting occurred from mulitiple locations after 1000 gallons injected 1/10, well was revisited 1/12 and 400 gallons was injected before daylighting occurred. DPT locations were installed in order to annly the remaining iniectate. i NEI INO ATl :.. _ MMMAL TECHNOLOalF�, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/8/2019 1/10/2019 1/11/2019 1/12/2019 1/15/2019 10:38 9:30 12:30 8:45 8:46 Well ID IW-3 to to to to to 12:30 13:00 16:45 11:42 9:11 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 11-31' 11-31' 11-31' 11-31' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Daylighting occurred from the edge of the volume well was revisited multiple times in order to apply full A AL TEC 'OLOW , INC. Job Name: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/7/2019 15:02 Well ID IW-4 2019 Injections 1/8/2019 8:50 to to 16:48 10:34 Summary Injection Point Summary Actual Proposed Proposed Proposed Well Screen 18-38' 19-39' 18-38' 19-39' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Job Name: Date of Injection: Well ID Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate 1/7/2019 Time of Injection: 10:13 to IW-5 14:49 Summary Injection Point Summary Proposed Proposed Actual Proposed Well Screen 18-38' 19-39' 18-38' 19-39' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Slight surface escave,15' northeast of well, let 2019 Injections at 12:30, finished injection at 14:00 Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/9/2019 1/10/2019 1/11/2019 12:26 8:51 9:54 Well ID IW-6 Sum] Injection Point Summary Actual Proposed Actual Well Screen 18-38' 19-39' 18-38' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 Gallons of Solution 3658 3658 3658 Pressure of Post -injection pathway dev. 1 50 50 Odors: Field Observations: to to to 16:42 9:20 12:30 occurred 20' west of well, revisited well twice in order to finish under decreased ATIV. ENVIRONMENTAL TECHNOLOEHES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/10/2019 1/11/2019 1/12/2019 1/15/2019 14:45 13:05 9:07 9:18 Well ID IW-7 to to to to 16:15 14:45 11:05 11:10 Odors: Field Observations: Daylighting occurred 1/10 15' east of injection well, well was revisited 3 times to complete under decreased pressure (20 psi) Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 18.5-38.5' 19-39' 18.5-38.5' 19-39' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 5- V-f - MOVATIVE _._ - 'RO'NMENTAL TE-CH'OLOEHES, UNC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/8/2019 Time of Injection: 12:45 to Well ID IW-8 16:04 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 27-47' 27-47' 27-47' 27-47' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: i 1 INOVATIVE _ 1 ftONMEWrAL TECSdN ODDER 1 INC. Job Name: Date of Injection: Well ID Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate 1/9/2019 Time of Injection: 8:53 to 12:04 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 31-51' 31-51' 31-51' 31-51' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 1 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 1 50 50 Odors: Field Observations: 2019 Injections VO A !S !i ONMEMAL TECH OLOW y INC. 757 Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Well ID IW-10 Date/Time of Injection: 1/10/2019 1/11/2019 1/16/2019 15:29 9:10 8:18 to to to 16:30 10:13 8:36 Summary Injection Point Summary Proposed Proposed Actual Proposed Well Screen 31-51' 31-51' 31-51' 31-51' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 3657 8363 3657 8363 Pounds of Ferric Oxide 317 725 317 725 Gallons of Solution 1 1600 3658 1600 3658 Pressure of Post -injection pathway dev. 1 50 50 Odors: Field Observations: Daylighting occurred 20' south of IW-10 on 1/10, well was revisited twi under decreased pressure (20 psi) ina occurred both times MATIVE ENVIRONMENTAL TECHNIOLO(RES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/11/2019 1/15/2019 1/16/2019 9:50 12:00 10:29 Well ID IW-11 to to to 11;00 14:45 11:22 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 31-51' 31-51' 31-51' 31-51' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 4516 8363 4516 8363 Pounds of Ferric Oxide 396 725 396 725 Gallons of Solution 2000 3658 2000 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Daylighting occurred 1/11 after 400 under reduced pressure (20 psi), dai ms injected, 25' northeast of injection well, well was revisited twice ing continued from same area, 1600 additional gallons infected. AL TECH-NOLOWES, MC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Time of Injection: 1/7/2019 1/15/2019 1/16/2019 11:20 14:55 8:38 Well ID IW-12 to to to 17:00 16:47 15:30 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 44-64' 44-64' 44-64' 44-64' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 23392 8363 23392 8363 Pounds of Ferric Oxide 2028 725 2028 725 Gallons of Solution 10,232 3658 10232 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Left over materials from IW-10, IW-1.1 and IW-13 were added here due to screened interval bei common w' IW 13 and um-radient proximity to uninstalled IW 16 A L TE CHNOLOEHES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 1 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/7/2019 1/12/2019 1/16/2019 10:30 16:00 12:20 Well ID IW-13 to to to 11:00 17:20 12:45 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 44-64' 44-64' 44-64' 44-64' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 1829 8363 1829 8363 Pounds of Ferric Oxide 158 725 158 725 Gallons of Solution 800 3658 800 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Daylighting occurred 1/7 from previously abandoned casing Y north of well, old casing was over drilled and grouted from 0-20' on 1/9/2019, grout was allowed to set and well was revisited twice under reduced pressure (20 psi), davliahtina occurred 10' east of well both times F; L............ .-, tN INOVAUVE ENVIRONMENTAL TE- CHNO1 OEHIES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 11:31 8:32 Well ID IW-14 to to 16:57 11:09 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 52-72' 53-73' 52-72' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: A`-' 1� _ i I �1 [NOVA _ l im�AL TECHNOLOEHES, M. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/12/2019 Time of Injection: 11:17 to Well ID IW-15 15:07 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 53-73' 53-73' 53-73' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: mil. A I X ENVI OA MENT L TECH OLO61 p UNC. Job Name: Date of Injection: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Well ID IW-16 Time of Injection: to Summary Injection Point Summary Actual Actual Well Screen Duration of Fracture (seconds): Pressure of Pre -injection pathway development Estimated Radius of Influence Pounds of Sodium Persulfate Pounds of Ferric Oxide Gallons of Solution Pressure of Post -injection pathway dev. Odors: Field Observations: Well not installed l A IVE 'E r RONAr1RlttWL TE1sHNCiL\lUIES, C. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date/Time of Injection: 1/9/2019 1/10/2019 11:30 8:35 Well ID IW-17 to to 16:37 11:22 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 53-73' 53-73' 53-73' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Slight surface escapes observed around for nieht and finished 1/10. M AL' ECHNOL0E11S, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate Time of Injection: 1/7/2019 15:30 Well ID IW-18 2019 Injections 1/8/2019 8:56 to to 17:03 10:50 Summary Injection Point Summary Actual Proposed Actual Proposed Well Screen 53-73' 53-73' 53-73' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 1 3658 3658 3658 Pressure of Post -injection pathway dev. 50 1 50 Odors: Field Observations: 1 ;'�� t"LH-"1 11------� � Job Name: Date of Injection: Well ID Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate 1/10/2019 Time of Injection: 11:32 IW-19 to 15:18 Summary Injection Point Summary Actual Proposed Proposed Proposed Well Screen 53-73' 53-73' 53-73' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: Influence observed at PMW-10A and PMW-1 J slues and continued 0 AL TEECHNOLOEHES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate Time of Injection: 1/8/2019 10:57 Well ID IW-20 2019 Injections 1/9/2019 8:18 to to 17:23 11:10 Summary Injection Point Summary Actual Proposed Proposed Proposed Well Screen 53-73' 53-73' 53-73' 53-73' Duration of Fracture (seconds): 20 20 Pressure of Pre -injection pathway development 75 75 Estimated Radius of Influence 12.5 12.5 Pounds of Sodium Persulfate 8363 8363 8363 8363 Pounds of Ferric Oxide 725 725 725 725 Gallons of Solution 3658 3658 3658 3658 Pressure of Post -injection pathway dev. 50 50 Odors: Field Observations: surface escapes observed around for night and finished 1/9 T 1NN0VATWE UNIRONMMAL'fEMOLMIES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/17/2019 Time of Injection: 9:56 WellID DPT-1 11:37 Summary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Injection Interval (ft.bgs.) 8-10' 10-12' 12-14' 16-18' 19-21' 8-21' Duration of Fracture (seconds): 3 3 3 3 3 Pressure of Pre -injection pathway developmenl 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal O 22', location installed --10' west of IW-1 -- f �� INNOVATIVE ENVIRONMENTAL TECHNOLOGIES, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/17/2019 Well ID DPT-2 Time of Injection: 2019 Injections 11:46 to 13:22 Summary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Injection Interval (ft.bgs.) 8-10' 10-12' 12-14' 16-18' 18-20' 8-20' Duration of Fracture (seconds): 3 3 3 3 3 Pressure of Pre -injection pathway developmeni 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal @ 22', location installed —10' southwest of IW-1 1 r uaoVA,nA mMoNmmAL TEmoLorms, wc. Job Name: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/14/2019 Well ID DPT-3 Time of Injection: 2019 Injections 16:55 to 18:45 Cnmmary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Injection Interval (ft bgs.) 8-10' 10-12, 12-14' 14-16' 16-18' 8-18' Duration of Fracture (seconds : 3 3 3 3 3 Pressure of Pre -injection pathway developmeni 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal O 19', location installed —15' east of IW-1 -a MNOVAUA I; MRONMMAL TECHNOL06IES, INC. Job Name: Date of Injection: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate 1/14/2019 Well ID DPT-4 Time of Injection: 2019 Injections 16:00 to 16:55 Cnmmary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Injection Interval (ft.bgs.) 5-7' 8-10' 11-13' 14-16' 17-19' 5-19' Duration of Fracture (seconds): 3 3 3 3 3 Pressure of Pre -injection pathway developmeni 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal (a), 20', location installed —15' southeast of IW-I I!+ E 1'Y i / INNOVATIVE MWIRONMI; AL TECHNOLO(H S, INC. Job Name: Date of Injection: Trex - Cullman Ave. - Charlotte, NC Permanent Well Application of Ferric Oxide Activated Persulfate 1/14/2019 Well ID DPT-5 Time of Injection: 2019 Injections 13:50 to 15:05 Summary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed _Actual Proposed Injection Interval (ft.bgs.) 5-7' 8-10' 11-13' 14-16' 17-19' 5-19' Duration of Fracture (seconds): 3 3 3 3 3 Pressure of Pre -injection pathway developmeni 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal A 20', location installed —15' west of IW-2 El f � INNOVATIVE £NiIIRONM£NTAI.' EUMOLOERESS, INC. Job Name: Trex - Cullman Ave. - Charlotte, NC 2019 Injections Permanent Well Application of Ferric Oxide Activated Persulfate Date of Injection: 1/14/2019 Well ID DPT-6 Time of Injection: 12:01 to 13:36 Summary Injection Point Summary Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Actual Proposed Injection Interval (ft.bgs.) 14-16e 16-18' 18-20e 20-22e 22-24e 14-24' Duration of Fracture (seconds): 3 3 3 3 3 Pressure of Pre -injection pathway developmeni 150 150 150 150 150 Estimated Radius of Influence 12.5 12.5 12.5 12.5 12.5 Pounds of Sodium Persulfate 387 387 387 387 387 1935 Pounds of Ferric Oxide 35 35 35 35 35 175 Gallons of Solution 170 170 170 170 170 850 Pressure of Post -injection pathway dev. 50 50 50 50 50 Odors: Field Observations: DPT refusal @ 25', location installed —15' southwest of IW-2 ji INNOVATIVE EMtONI6IMAL, TECHNOLOERES, INC. Job Name: Trex-Cullman Ave. 2019 Injections In -Situ Chemical Oxidation using Ferric Oxide activated Persulfate Date of Injections: 1/7-1/17/2019 Injection Summary Injection Summary Injection Point Summary Actual Proposed Pounds of Sodium Persulfate 158858 158900 Pounds of Ferric Oxide 13826 13780 Gallons of Solution 1 69536 69500 ! = l ii�ivVYli[ YGT1\1!i{MY1VEN—LALTEr✓fiivciLowt wc r Job Name: Trex - Cullman A— _ ra..._a "une Pra +aajcctivai: Well ID Pnint FP@'61'�ta �9agC L,F .Q� c$pH-Hii"tenn Of C1eFrk "Ni e &iv te:S ppPCiH 1ii4i2tii DPT-7 I Yressnra of Pre -infection nathwav devF Estimated Radius of Influence Pounds of Sodium Persulfate Pounds of Ferric Oxide Gallons of Solution Pressure of Post -injection pathway dev. Act3al � PrginaaserE Actual Pror�ss�d _ A traaa C_ l 1prrtranserl A�tEaal 17-1y1 19 �1i s 2 i-25' 15.0 1 ' 15D 1 1 1 3 12.5 lso 1 J 1SD_ 387 12.5 12.5 12.5 35 387 387 387 170 35 35 35 50 170 170 170 50 50 50 Fuld Observations: DPT refusal R 25' location installed —15' southwest of iW-2 Time of injection: Actval 25-27' s _ 150 12.5 387 35 170 50 2019 Injections 9:47 to 11:58 Acton[ i7-27' 175 850