Loading...
HomeMy WebLinkAbout20000783 Ver 2_Approval Letter_20100512?A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 12, 2010 DWQ Project # 00-0783, Ver. 2 Wake County Mr. Andrew L. Ammons Ammons Development Group 10405-G Ligon Mill Road Raleigh, NC 27587 Subject Property: Traditions Subdivision - Phase 1 Ut to Hatters Branch [030402, 27-23-4, C, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B .0233) with Additional Conditions Dear Mr. Ammons: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 132 linear feet of perennial stream and 400 linear feet of intermittent stream, 3,748 square feet of Zone 1 Neuse River protected riparian buffers, and 3,777 square feet of Zone 2 Neuse River protected riparian buffers, as described in your application October 15, 2009, and received by the Division of Water Quality (DWQ) on October 15, 2009, with additional information received from you on December 22, 2009, February 26, 2010, and April 30, 2010, to construct the proposed residential development at the site. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3820 (GC3820) and 3821 (GC3821). The Certification(s) allows you to use Nationwide Permit(s) NW 14 and NW29, respectively, when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: http:llh2o.enr.state.nc.us/ncwetlands/ NonrthCarolina Naturally An Equal Opportunity 1 Affirmative Action Employer Ammons Development Group Page 2 of 5 May 12, 2010 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Type of Impact Amount Approved nits Plan Location or Reference Stream - perennial 132 linear feet PCN ap plication page 5 of 12 Stream - intermittent 400 linear feet PCN ap plication page 5 of 12 Buffers Zone 1 3,748 (square ft. PCN ap plication page 6 of 12 Buffers Zone 2 3,777 (square ft. PCN ap plication page 6 of 12 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Control Measures Sediment and erosion control measures shall not be placed in wetlands or waters without prior approval from the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; Ammons Development Group Page 3 of 5 May 12, 2010 6. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (hqp://www.ncdot.org/doh/operations/BMP manual/download/BMP Manual.pdf) such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re- installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 7. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re-concentrate before discharging into a stream as identified within 15A NCAC 2B .0233 (5). If this is not possible, it may be necessary to provide stormwater facilities that are considered to remove nitrogen(and phosphorus if in the Tar-Pamlico River Basin). This may require additional approval from this Office. Ammons Development Group Page 4 of 5 May 12, 2010 8. Stormwater Management Plan (SMP) Approval Required Before the impacts specified in this Certification may occur, the applicant must meet all of the provisions set forth in the document Stormwater Management Plan (SNP) Requirements for Applicants other than the North Carolina Department of Transportation, available at: http://portal.ncdenr.org/web/wg/swp/ws/40 I/certsandpermits/swmanaeg ment The required SMP documentation must be submitted within 60 days of the issuance of the 401 Water Quality Certification to the DWQ (401 Oversight and Express Permitting Unit, 2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604). SMP approval and implementation procedures shall be as follows: • The SMP must be approved in writing by either the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts authorized in this certification occur. If a development is phased, then the SMP for each future phase must approved by the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts associated with that phase may occur. • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. • A final, written stormwater management plan for each phase of this project shall be submitted . to the DWQ 401 Oversight/Express Permitting Unit (2321 Crabtree Boulevard, Suite 250, Raleigh, NC 27604) and the Town of Wake Forest for review and approval. No land disturbance associated with any phase may be conducted until a stormwater management plan for that phase has been submitted to and approved by the DWQ. No buildings associated with any phase may be occupied until the stormwater management plan is constructed and operational for that phase. In order to be approved by the DWQ, the stormwater management plan submittal must include a BMP Supplement Form with all required items. The BMPs must be designed such that they comply with the version of the NC DENR Stormwater BUT Manual that is in effect on the date of the submittal of the stormwater management plan (SMP). The SMP must meet the requirements in the version of SMP Regulations for non-DOT in effect at the time of submittal. 9. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct Ammons Development Group Page 5 of 5 May 12, 2010 impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within thirty (30) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone: (919)-733-2698, Facsimile: (919)-733-3478 A copy of the petition must also be served on DENR as follows: Ms. Mary Penny Thompson, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Ian McMillan or Amy Chapman at 919-733-1786. Sincerel , ,."Z oleeti H. CHS/gym Enclosures: GC3820 and GC3821 Certificate of Completion Sullins cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Bob Zarzecki, S&EC, PA, 11010 Raven Ridge Road, Raleigh, NC 27614 Filename: 000783 Ver2TraditionsSD(Wake)401 _NBR