Loading...
HomeMy WebLinkAbout20100168 Ver 1_More Info Letter_20100321e..+Sfhllo STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GoVERNOR EUGENE A. CONTI. JR. SECRETARY April 20, 2010 NC Division of Water Quality 2321 Crabtree Blvd Raleigh, NC 27604 ATTN: Ms. Coleen Sullins Director 1 0- c i &'E 19@?flwol APR 21 2010 DENR- WATER DUALITY WETLANDS AND STORMIATER WWC,4 Subject: Jordan Rule Applicability and Section 401 Certification application for the SR 1311 (Cook Rd) Widening & Extension from SR 1909 (Westbrook Ave) to SR 1503 (Manning Ave) on NC 100 in Alamance County. Federal Aid Project Number STP-0701(7), Division 7, T.I.P No. U-31 I OB. Reference: NCDOT Section 401 Certification application, dated February 22, 2010 NC DWQ letter, dated March 18, 2010, received March 31, 2010 Dear Ms. Sullins; The North Carolina Department of Transportation (NCDOT) is in receipt of the North Carolina Division of Water Quality's letter requesting adherence to the Jordan Lake Riparian Buffer Rules for the subject project pursuant to 15A NCAC .0267. The NCDOT understands that this project falls within the Jordan Lake Watershed. However, ?llhce?,;r;,nn(6)(b)0vl.ofthe.R,,1E 9--vi"des a grandfatheringallowanceforprojects "_.if CY.Finding of No Significani Impacts has been issued for the project prior- to the effective date of this Rule for state and federal entities." A Finding of No Significant Impact (FONSI) was signed by the Federal Highway Administration and the NCDOT in January 1998, well before the August 2009 effective date of the Rule. Therefore, the NCDOT believes that, pursuant to 15A NCAC .0267 (6)(b)(iv), the project is not subject to the Jordan Lake Riparian Buffer Rules, given that it is a present and ongoing activity. Nevertheless, the NCDOT recognizes the need to reduce degradation to water quality statewide. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION TELEPHONE: 919-431-2009 LOCATION: PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 4701 Atlantic Ave., NATURAL ENVIRONMENT UNIT FAX: 919-031-2001 Suite 116 1598 MAIL SERVICE CENTER Raleigh, NC 27604 RALEIGH NC 27699-1598 WEBSITE.. ?.N000TORG The NCDOT has implemented the following controls in the current design to minimize impacts to the unnamed tributary of Travis Creek: • Provided grass swale treatment for the second outfall prior to discharge through the buffer. • Reduced velocities in the existing culvert during high flow events by providing additional pipe capacity in the overbank. This will help to improve the stability of the downstream channel. • No rip rap is to be placed in the streambed at the outlet of the pipe extension to help preserve the natural integrity of the streambed • 2:1 fill.slopes;are;to betused to reduce the footprint in the jurisdictional areas. In additio, we are investigating and, if feasible, will reduce the number of outfatls from three to two by combihifig'two drainage systems and providing discharge to level ground outside of the fifty foot riparian buffenrto zrpreformed scour hole. We respectfully request that the NC DWQ continue to process our February 2010 Section 401 Certification application, as originally proposed, and concur that this project is not subject to the Jordan Lake Riparian Buffer Rule. Please direct any questions to Ms. Deanna Riffey at (919) 431-1594. Thank you for your consideration in this important mater. Gregory J. Thorpe, Ph.D., Manager Project Development and Environmental Analysis Branch Cc: Nfl . Brian `v`v'ieitn.NCOWQ Ms. Amy Euliss, NCDWQ Dr. David Chang, P.E., Hydraulics Mr. Travis Wilson, NC WRC File: U-3I IOB 2_/2 FW: U-3110B Page 1 of I FW: U-31108 Euliss, Amy Sent: Monday, May 10, 2010 8:40 AM To: Carrillo, Sonia For the 10-0168 file... -----Original Message----- From: Wrenn, Brian Sent: Thursday, May 06, 2010 4:14 PM To: Lusk, Elizabeth L Cc: Euliss, Amy; Thorpe, Gregory J; Harris, Philip S; Chang, David S; Karoly, Cyndi; Ridings, Rob Subject: RE: U-31106 Elizabeth, DWQ's management has decided to accept your response as adequate for our request for additional information on the U-3110B project. The 401 will be issued shortly out of the Winston-Salem regional office. As a follow-up to discussions on this issue, DWQ will be requesting a list of all projects in the Jordan watershed that have an approved FONSI prior to the effective date of the Jordan Nutrient strategy that have not be permitted. You mentioned in our conversations that DOT wants to know what to expect regarding the Jordan rules. DWQ would like the same level of expectations regarding future permit applications in the Jordan watershed. A formal request for this information will be forthcoming. If you have any questions, please let me know. Thanks. Brian -----Original Message--- From: Lusk, Elizabeth L Sent: Tuesday, April 20, To: Wrenn, Brian Cc: Euliss, Amy; Thorpe, Subject: U-31108 Brian, 2010 1:36 PM Gregory J; Harris, Philip S; Chang, David S Please see attached. We are sending a hard copy through the mail. We would be happy to meet and discuss any questions or suggestions. Thanks, Elizabeth Elizabeth L. Lusk Project Mgmt. Group Natural Environment Unit NCDOT, PDEA voice: (919) 431-6760 fax: (919) 431-2001 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. https://mail.ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJH14%2bmA%2f... 5/10/2010