HomeMy WebLinkAbout20201650 Ver 1_PreFiling Acknowledgement Email_20201103Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Tuesday, November 3, 2020 9:49 AM
To: karrance@hazenandsawyer.com
Cc: Trone, Rick V
Subject: Pre -Filing Meeting Request Acknowledgement - Snow Hill Road Force Main -
20201650 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Snow Hill Road Force Main that
you submitted on 11/2/2020. The ID number for that project is 20201650, Version 1.
Reviewer Contact Information:
Reviewer: Rick Trone
Email: rick.trone@ncdenr.gov
Reviewing Office: Central Office - (919) 707-9000
You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you
are allowed to submit your application.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not
monitored.
ID#* 20201650
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 11/2/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Keven Arrance
karrance@hazenandsawyer.com
Snow Hill Road Force Main
City of Durham, Water Management
Durham
Street Address
1600 Mist Lake Drive
Address Line 2
aty
Durham
Fbstal / Zip Code
27704
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
20-241
State / Province / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below.*
The project consists of construction of a new sewer force main, connecting
the new Snow Hill Road Pump Station (currently under construction) to the
existing Eno River Pump Station. The proposed force main extends
approximately 2.78 miles. The proposed project generally follows either
existing sewer easements or roadway rights -of -way. A stream determination
for buffer applicability was conducted on 9/10/2020 for the project.
Installation of the proposed force main will be by open cut trenching for the
majority of the length. Trenchless installation techniques will be used to
install the crossing of the Eno River (mainstem and an oxbow).
Please give a couple of dates you are available for a meeting.
11 /4/2020
11 /5/2020
11 /6/2020
11 /23/2020
11 /24/2020
Please attach the documentation you would like to have the meeting about.
SHRFM_topo_prefiling mtg map.pdf 615.43KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 11/2/2020