Loading...
HomeMy WebLinkAbout20201650 Ver 1_PreFiling Acknowledgement Email_20201103Strickland, Bev From: laserfiche@ncdenr.gov Sent: Tuesday, November 3, 2020 9:49 AM To: karrance@hazenandsawyer.com Cc: Trone, Rick V Subject: Pre -Filing Meeting Request Acknowledgement - Snow Hill Road Force Main - 20201650 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Snow Hill Road Force Main that you submitted on 11/2/2020. The ID number for that project is 20201650, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20201650 Version* 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 11/2/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Keven Arrance karrance@hazenandsawyer.com Snow Hill Road Force Main City of Durham, Water Management Durham Street Address 1600 Mist Lake Drive Address Line 2 aty Durham Fbstal / Zip Code 27704 Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 20-241 State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below.* The project consists of construction of a new sewer force main, connecting the new Snow Hill Road Pump Station (currently under construction) to the existing Eno River Pump Station. The proposed force main extends approximately 2.78 miles. The proposed project generally follows either existing sewer easements or roadway rights -of -way. A stream determination for buffer applicability was conducted on 9/10/2020 for the project. Installation of the proposed force main will be by open cut trenching for the majority of the length. Trenchless installation techniques will be used to install the crossing of the Eno River (mainstem and an oxbow). Please give a couple of dates you are available for a meeting. 11 /4/2020 11 /5/2020 11 /6/2020 11 /23/2020 11 /24/2020 Please attach the documentation you would like to have the meeting about. SHRFM_topo_prefiling mtg map.pdf 615.43KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 11/2/2020