Loading...
HomeMy WebLinkAbout20201557 Ver 1_Buffer Determination_20201103ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director DuPont Industrial Biosciences USA, LLC ATTN: George T. Xenakis, DuPont de Nemours 914 Centre Road Wilmington, Delaware 19805 NORTH CAROLINA Environmental Quality November 03, 2020 2020-1557 v1 (Express) Lenoir County Subject: On -Site Determination for Applicability to Neuse Riparian Buffer Rules (15A NCAC 02B .0714) (EXPRESS Program) Subject Property/ Project Name: DuPont Bioswale Address/Location: NC HWY 11, approximately 0.4 miles south of Canady Road, Grifton, North Carolina Stream(s) Evaluated: (1) — UT to Neuse River, Class C, NSW; Stream Index 27-(75.7); Neuse River Basin Determination Date: August 17, 2020 Staff: Chris Pullinger Determination Type: Buffer: Stream: ® Neuse (15A NCAC 02B .0714) ❑ Intermittent/Perennial Determination ❑ Tar -Pamlico (15A NCAC 02B .0734) ❑ Catawba (15A NCAC 02B .0614) ❑ Jordan (15A NCAC 02B .0267) (governmental and/or interjurisdictional projects) ❑ Randleman (15A NCAC 02B .0724) ❑ Goose Creek (15A NCAC 02B .0605-.0608) Stream E/I/P* Not Subject Subject Start@ Stop@ Soil Survey USGS Topo 2020-1557 man-made ditch X 2020-1557 Start 2020-1557 Finish X *E/1/P = Ephemeral/Intermittent/Perennial The Division of Water Resources has determined that the streams listed above and included on the attached map have been located on page 12 of the most recent published (1977) NRCS Soil Survey of Pitt County, North Carolina and/or the most recent copy of the Grifton USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the Neuse Riparian Buffer Rule. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or not present on the property. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify them to be at least intermittent streams. There may be other streams or features located on the property that do not appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. This on -site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Paul Wojoski DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): clo Paul Wojoski DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 D E Q�� North Carolina Department of Environmental Quality I Division of Water Resources Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889 NoarH o AaouNA Dopanmeol f Envo-onma.wi aUari /� 252.946.6481 This determination is final and binding as detailed above unless an appeal is requested within sixty (60) days. This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers or waters. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910)-251-4629. If you have questions regarding this determination, please feel free to contact Chris Pullinger at (252) 948-3918. Sincerely, Robert Tankard, Assistant Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: WaRO DWR File Copy/LASERFICHE Patrick L. Covil, PE; Dewberry Engineers Inc. (via e-mail: pcovil@dewberrv.com) George T. Xenakis, DuPont de Nemours (via e-mail: George.T.Xenakis@dupont.com) Emily Thompson, USACE Washington Field Regulatory Office (via e-mail) Randall Jones, WaRO DEMLR (via e-mail) Lyn Hardison, One Stop Permitting — WaRO (via e-mail) N,a A! rl# C Le l FA zLe/ �o , ? O 4 'r f020 55.7—v1-Finish f 1 1 Management Commission Division d Water Resources For NeuseBasin Buffw D ovem er 3 20 Reviewed by��� DWR Project #2029-1557 vl