Loading...
HomeMy WebLinkAboutNCC204870_ESC Approval Submitted (4)_20201103ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Acan g Director NORTH CAROLINA Environmental Quality April 8, 2020 LETTER OF APPROVAL WITH PERFORMANCE RESERVATIONS LGI Homes of NC, LLC ATTN: Keith Sears, Reg. Const, Manager 1450 Lake Robbins Drive, Suite 430 The Woodlands TX 77380-3258 RE: Project Name: Lot Clearing Plan for Lot 140 at Avery Pond SD, Ph III D Acres Approved: 0.36 Project ID: HARNE-2020-108 County: Harnett City: Hectors Creek Township Address: Avery Pond Drive River Basin: Cape Fear Stream Classification: HQW Submitted by: Lee R. Hines, Jr., PE Date Received by LQS: March 23, 2020 Plan Type: NEW — Residential Dear Mr. Sears: This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form may be accessed at.deq.nc.gov/NCGO I. Please direct questions about the NOI form to Annette Lucas at Annette. lucas ncdenr. gov or Paul Clark at Paul.clarkL@ncdenr.gov, After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Qi�� Fayetteville Regional office 1 225 Green Street, Suite 71<41 Fayetteville. North Carolina 28301 w�7'JH 1r oe®M1�MMFmkanarenla€a I, - Rill A-ATAno Letter of Approval with Performance Reservations LGI Homes of NC, LLC April 8, 2020 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, zo ;� T othy L. L nty, P� a Regional Engineer DEMLR Enclosures: Certificate of Approval Modifications Required for Approval NPDES NCGO 1 Fact Sheet cc: Lee R. Hines, Jr., PE (via email) Landon Chandler, Harnett County (via email) Fayetteville Regional Office — DEMLR file Letter of Approval with Performance Reservations LGI Homes of NC, LLC April 8, 2020 PERFORMANCE RESERVATIONS Project Name: Lot Clearing Plan for Lot 140 at Avery Pond SD, Phase III D Project fD: HARNE-2020-108 County: Harnett • Location of proposed silt fence outlet may need to be revised. The determination should be made after clearing activities are completed. (GS 113A-57(3), 15A NCAC 04B3.0113) Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities