HomeMy WebLinkAboutNCC204870_ESC Approval Submitted (4)_20201103ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Acan g Director
NORTH CAROLINA
Environmental Quality
April 8, 2020
LETTER OF APPROVAL WITH
PERFORMANCE RESERVATIONS
LGI Homes of NC, LLC
ATTN: Keith Sears, Reg. Const, Manager
1450 Lake Robbins Drive, Suite 430
The Woodlands TX 77380-3258
RE: Project Name: Lot Clearing Plan for Lot 140 at Avery Pond SD, Ph III D
Acres Approved: 0.36
Project ID: HARNE-2020-108
County: Harnett
City: Hectors Creek Township
Address: Avery Pond Drive
River Basin: Cape Fear
Stream Classification: HQW
Submitted by: Lee R. Hines, Jr., PE
Date Received by LQS: March 23, 2020
Plan Type: NEW — Residential
Dear Mr. Sears:
This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with
Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is
required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S.
113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This
form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named
project. The NOI form may be accessed at.deq.nc.gov/NCGO I. Please direct questions about the NOI form to Annette
Lucas at Annette. lucas ncdenr. gov or Paul Clark at Paul.clarkL@ncdenr.gov, After you submit a complete and correct NOI
Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually until a Notice of
Termination is issued. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Qi��
Fayetteville Regional office 1 225 Green Street, Suite 71<41 Fayetteville. North Carolina 28301
w�7'JH 1r
oe®M1�MMFmkanarenla€a I, - Rill A-ATAno
Letter of Approval with Performance Reservations
LGI Homes of NC, LLC
April 8, 2020
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this
letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the
approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the
revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity.
This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility
Form, which you provided. You are requested to file an amended form if there is any change in the information included on
the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In
addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you
plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
zo
;�
T othy L. L nty, P� a
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO 1 Fact Sheet
cc: Lee R. Hines, Jr., PE (via email)
Landon Chandler, Harnett County (via email)
Fayetteville Regional Office — DEMLR file
Letter of Approval with Performance Reservations
LGI Homes of NC, LLC
April 8, 2020
PERFORMANCE RESERVATIONS
Project Name: Lot Clearing Plan for Lot 140 at Avery Pond SD, Phase III D
Project fD: HARNE-2020-108
County: Harnett
• Location of proposed silt fence outlet may need to be revised. The determination should be made after clearing
activities are completed. (GS 113A-57(3), 15A NCAC 04B3.0113)
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities