Loading...
HomeMy WebLinkAbout20100251 Ver 1_More Info Letter_20100503NCDEE R North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 3, 2010 CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Rodney Tart Harnett County Department of Public Utilities P.O. Box 119 Lillington, NC 27546 Subject Property: Brightwater Medical Complex Ut to Neills Creek [030607, 18-16-(0.7), WSIV] REQUEST FOR MORE INFORMATION Dear Mr. Tart: DWQ Project # 10-0251 Harnett County On March 31, 2010, the Division of Water Quality (DWQ) received your application dated March 30, 2010, to fill or otherwise impact 0.35 acres of 404/wetland and 219 linear feet of perennial stream, to construct the proposed mixed-use development at the site. On April 9, 2010, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will place this project on hold as incomplete until we receive this additional information. If we do not receive the requested information, your project will be formally returned as incomplete. Please provide the following information so that we may continue to review your project. Additional Information Requested: Brightwater Biotechnologv_and Medical Center: 1. Please clarify which parts of the proposed development are Phase I and Phase II on a full-sized plan sheet that shows surface waters, topographic lines and all anticipated impervious surfaces. 2. You must provide the Required items Checklist associated with each of the Wet Detention Basin Supplement Forms and all required items listed therein at the correct scales. The checklist includes a signed and notarized Operation and Maintenance Agreement for the wet detention ponds as well as many other items. If all required items are not included in the next submittal, your application will be returned. 3. Please provide a table of elevations, areas, incremental volumes and accumulated volumes for the ponds and forebays. This must include rows for key elevations (bottom, sediment cleanout, permanent pool, temporary pool, etc.). 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 Location: 2321 Crabtree Blvd., Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX: 919-733-6893 Internet: hdp://h2o.enr.state.nc.us/ncwetlands/ NorthCarohna A I Witrally An Equal Opportunity 1 Affirmative Action Employer Harnett County Department of Public Utilities Page 2 of 4 May 3, 2010 4. Please show the following items on the pond profiles: a. The forebay invert, ponds invert and sediment clean-out elevations. b. The correct side slopes: 10:1 for the vegetated shelf and 3:1 elsewhere. c. The permanent and temporary pond elevations as well as any other relevant storage elevations. d. The size, length and slope of the outlet barrel. 5. The average depths provided are less than the required minimum of 3 feet. This depth cannot include the 1' of sediment storage. Please revise the ponds to provide the minimum depth or more. Please correct the errors in the calculation of average depth in your resubmittal. 6. The forebay volumes must comprise 10 percent of the total volume of the BMP. None of the four ponds have an appropriate forebay volume. 7. Planting plans for the ponds must be provided on the plans as per 10.3.7 of the BMP manual. 8. Please provide the drawdown calculations for each pond. 9. Please provide a soils test based on in-field borings conducted in the footprint of the proposed wet detention ponds to document the SHWT elevation. Liners may be required if it is well below the permanent pool elevations. See also 10.3.2 of the BUT manual. 10. Please show details of all the pond outlets and associated energy dissipation devices. 11. Per the BMP Manual, the emergency spillway must be hardened with concrete, rip rap or other appropriate material. 12. Please be sure that any changes are consistently reflected on all documents (plans, calculations, supplement forms, etc.) 13. For the Phase II portion of the site, you must provide a conceptual stormwater management plan that includes the following: a. A depiction of the drainage areas on the site. b. An estimation of the percentage imperviousness associated with each of the drainage areas. c. A calculation of the water quality volume associated with each drainage area. d. A depiction of the proposed BMP (state the type of BMP you plan to use) on the site plan that is correctly sized based on the water quality volume. Harnett Health Hospitals: 1. Please address the following issues with Wet Detention Basin #2: Harnett County Department of Public Utilities Page 3 of 4 May 3, 2010 a. The pond appears to be short circuiting. Please shift the outlet location to lengthen the flow path length to width ratio. A ratio of at least 3:1 (L: W) is recommended. b. The 18" pipe discharging into the pond needs to enter the pond via a forebay. c. Sizing of the pond must take into account the build-out of the offsite drainage area to the north. Another option would be to bypass that area around the pond, and treat it separately if it is ever developed. 2. Please address the following issues with Wet Detention Basins # 1 and #2: a. The double 6-inch diameter orifices appear to draw down in less than 2 days. Also, please provide drawdown calculations that show that the minimum required treatment volume draws down in 2 to 5 days. b. Please provide calculations that show how the treatment volume was calculated using the Simple Method. c. The stage storage output provided does not provide all the information needed. Please provide a table of elevations, areas, incremental volumes and accumulated volumes for the overall pond and forebay so that we can verify volumes, areas, and elevations provided on the plans and supplement forms. This must include rows for key elevations (bottom, sediment cleanout, permanent pool, temporary pool, etc.). d. On page 3 of the O&M Agreements, the elevations for when sediment is to be removed are incorrect. e. The average depths provided are less than the required minimum of 3 feet. This depth cannot include the F of sediment storage. Please revise the ponds to provide the minimum depth or more. f. Please provide the SHWT elevations. A liner may be required if it is well below the permanent pool elevation. See also 10.3.2 of the BMP Manual. g. Planting plans for the ponds must be provided on the plans as per 10.3.7 of the BMP Manual. h. Please provide outlet details on the plans showing orifices, weirs, trash rack, etc. i. We recommend adding an emergency spillway in the event the outlet structure gets clogged. That way the flow is released in a controlled manner. j. The outlet structures should be moved closer to the bank of the ponds to allow for easier inspection and maintenance of the outlets. 3. Please be sure that any changes are consistently reflected on all documents (plans, calcs, supplement forms, O&M forms, etc.) Please submit this information or otherwise address this request within 30 calendar days of the date of this letter. If we do not receive this requested information within 30 calendar days of the date of this letter, your project will be withdrawn and you will need to reapply with a new application and a new fee. Harnett County Department of Public Utilities Page 4 of 4 May 3, 2010 This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please-call Mr. Ian McMillan or Ms. Amy Chapman at 919-733-1786 if you have any questions regarding or would like to set up a meeting to discuss thi matter. Sin ly, Ian McMillan, Acting Supervisor 401 Oversight/Express Review Permitting Unit UM cc: Crystal Amschler, U.S. Army Corps of Engineers - Wilmington Regulatory Field Office Chad Turlington, DWQ Fayetteville Regional Office File Copy Troy Beasley, Withers & Ravenel, 1410 Commonwealth Drive, Suite 101, Wilmington, NC 28403 Hunter Freeman, Withers & Ravenel, 111 Mackenan Drive, Cary, NC 27511 Warren Sugg, Mulkey Engineers & Consultants, P.O. Box 33127, Raleigh, NC 27636 Filename: 100251BrightwaterMedica[Complex(Harnett)On_Hold2 ¦ Complete items 1, 2, and 3. Also complete item 4 if Restricted Delivery is desired. ¦ Print your name and address on the reverse so that we can return the card to you. ¦ Attach this card to the back of the mailpiece, or on the front if space permits. 1. Article Addressed to: RODNEY TART 5/4/10 HARNETT COO EPT OF PUBLIC UTILITIES PO BOX9 LILLINGTON NC 27546 DWQ 10-0251 HARNETT CO Agent A. ?7))U. e X / , 2 Addressee B. _ Received by tjWnted Name) C. Date of Delivery PtiI it ithu,v D. Is delivery add different f If YES, enter deli ress b ?I item 1? III 3. Service Type X Certified Mail ? Express Mail ? Registered ? Return Receipt for Merchandise ? Insured Mail ? C.O.D. 4. Restricted Delivery? (Extra Fee) ? Yes 2. Article Number (Transfer from service label) 7 0 0 9 2 8 2 0 0004 4137 2124 UNITED STATES POSTAL SERVICE • Sender: Please print your name, address, and ZIP+4 in this box • First-Class Mail Postage 8 Fees Paid USPS Permit No. G-10 NC DENR DIVISION OF WATER QUALITY 401 OVERSIGHT/EXPRESS UNIT 2321 CRABTREE BOULEVARD, SUITE 250 RALEIGI I, NC 27604