HomeMy WebLinkAbout20060138 Ver 1_Information Letter_20100401?MIJNKA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor Director Secretary
April 1, 2010
City of Greensboro
Attn: Thomas L. Cordell
Engineering Design & Inspection
300 W. Washington St.
Greensboro, NC 27401-2624
Darrell Ferguson
NCDOT, Division 7-Resident Engineer
PO Box 14996
1584 Yanceyvilte Street
Greensboro, NC 27415
Subject: Iiornaday Road
DWQ permit no. 20060138
Guilford County
Dear Sirs:
In response to your requests, Amy Euliss and Sue Homewood, NC Division of Water Quality (DWQ)
meet with Mr. Cordell and other City of Greensboro staff, a NCDOT Division 7 Inspector, and Adam
Holcomb of Dane Construction regarding the placement of bent #3 on March 31, 2010. As a follow rip
to our meeting, Dane Construction sent us a letter dated March 31, 2010 detailing the construction
activities that will occur adjacent to and inside DOT's Long Branch Mitigation Site and the Randleman
Lake Buffer. Through issuance of this letter, we approve the commencement of construction activities
and placement of sediment and erosion control activities in the Randleman Lake Buffer as detailed in the
March 31, 2010 letter from Dane Construction, as long as the following conditions are met:
1. DWQ permit no. 20060138 shall be modified to account for permanent and temporary impacts
to Randleman buffer associated with bent placement and sediment and erosion control measures.
An modification application shall be received within 30 days of your receipt of this letter.
2. Any disturbed vegetation shall be replanted with like vegetation.
3. If the Long Branch mitigation site is inadvertently harmed, this site shall be repaired. This could
result in increased monitoring time of the mitigation site. If any repairs to the mitigation site are
necessary, these shall be coordinated with and approved by NCDOT and DWQ.
4. Please reassess the location of the preformed scour hole. Diffuse flow must be achieved at the
outlet of the preformed scour hole. If necessary, the placement of the scour hole might need to
be shifted away from the bridge bent.
Winston Salem Regional Office
l 585 Warghtown steel, Winston Salem. North Carolina 27107-2241
Phone: 33(1 FAX: 336771-0631
Internet: http:llporlal.nedencorg7weblwgO om lmhvsro
NhCarolina
oa t
?atl{rally
OF
An Equal Opportunity 1 Alfrmalive Action Employer
5. Erosion control measures must installed in a manner that is in compliance with Division of Land
Resources requirements.
Please contact Amy Euliss at 336-771-4959 or myself at 336-771-4964 if you have any questions.
Sue Homewood
Winston Salem Regional Office
cc: Adam Holcomb, Dane Construction, e-copy
Andy Williams, USACE Raleigh Field Office, e-copy
Chuck Kirchner, Land Quality, e-copy
Jamie .Lancaster, NCDOT PDEA- NEU, e-copy
Jerry Parker, NCDOT Division 7
DWQ Wetlands/401 Unit
File Copy