HomeMy WebLinkAboutNCC200862_Email RE NOT Request Not Approved with Insp Report_20201103Georgoulias, Bethany
From: laserfiche@ncdenr.gov
Sent: Tuesday, November 3, 2020 7:32 AM
To: greg.sparks@nagsheadnc.gov
Cc: Georgoulias, Bethany; McCoy, Suzanne; cliff.ogburn@nagsheadnc.gov; David Ryan
Subject: NOT Request Not Approved
This email is to notify you that your request to rescind COC No. NCC200862 for the project Town of Nags
Head W. Side Multi -Use Path Phase 813 was not approved for the following reason:
The 10/14/2020 inspection report indicated land disturbing activities were not yet completed. Please submit the
NOT request for this project when you receive the final close-out inspection for this site.
If you have any questions, please contact The NC DEMLR Stormwater Program at (919) 707-3640.
This email was automatically generated by Laserfiche. Please do not respond to this email address, as
responses are not monitored.
'a111111111 IMIin,IIII Rim, lam, a- a a•aa
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Dare Project: Town of Nags Head- West Side River basin: Pasquotank
Person financially responsible: TownofNags Head- CliffOgbom, Town Manager Project#: DARE-2020-007
Address: P.O. Box 99, Nags Head, NC 27959
1. Project Location: US 158, Nags Head
Pictures: No
2. Weather and soil conditions: 70 degrees, sunny, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with the NPDES Permit? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
a. Contact made with (name): No one was on -site. Title:
Inspection report: Sent Report Date given/sent: October 20, 2020
9. Corrective action needed: None.
10. Comments: The site appeared to be in compliance during the time of inspection. Continue monitoring
until all land disturbing activities have been completed, and the site is deemed stable enough
to be released from the erosion and sediment control permit.
Reported by: Scott Gmboski Others present:
Date of inspection: October 14, 2020 Time arriving on site: 2:40 PM Time leaving site: 2:50 PM