Loading...
HomeMy WebLinkAbout20201360 Ver 1_Shoreline Stabilization_20201102Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 11/2/2020 2:17:03 PM (Submittal) Submit by Montalvo, Sheri A 11/2/2020 11:33:28 PM (Non -DOT - Approver) • The task was assigned to Montalvo, Sheri A 11/2/2020 2:17 PM Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: becherer seawall dwr.pdf IM Pre -fling Meeting or Request Date 10/1/2020 ID# 20201360 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * rich.becherer@yahoo.com Rease provide an email address for payrrent and requests for pure information here. Owner Information: Name: * Richard Becherer Email: * rich.becherer@yahoo.com Phone Number:* (423)802-4962 (xxx)xxx-xxxx Mailing Address:* Street Address 514 Young Avenue Address Line 2 City State / Frovince / Region Chattanooga TN Fbstal / Zip Code Country 37405-4240 Us Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* Becherer Seawall If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Street Address 111 lake breeze dr Address Line 2 Latitude:* 35.160292 City State / Province / Fbgion Cullowhee NC Fbstal / Zip Code Country 28723 US Longitude:*-83.150054 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* siteplan20200925_11203485.pdf 159.57KB siteplan20200925_11211198.pdf 163.59KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* IMG951525. jpg 50.47KB IMG951526. jpg 53.57KB IMG951527. jpg 83.62KB 4. Location of the property (where work is to be conducted) Nearest Town:* Glenville County: * Jackson Lake/ river/ ocean adjacent to Glenville property: Subdivisions name or site address:* Glen Pointe Include phasellot nunter Directions to site:* 107 to N. Norton 3.4 miles right onto Toby Bryson Rd. Right onto Falls cove Rd: to Lake Breeze Dr Reese include road nacres and numbers, landmarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* Residential Residential, undeveloped, etc. 6. Property Size 1.15 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Replace failing existing 100 ft seawall; add 50 ft of seawall to the right side of existing to prevent further erosion 8. How will the work be done?* r From Land rJ From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 750 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining w alls, etc.) 450 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (number of trees, for instance) 3 trees over 3" in diameter; small shrub vegetation Sketch: siteplan20200925_11211198.pdf 163.59KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certifythat: a I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief a I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. a I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); a 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Richard Becherer Signature: Initial Review Is this accepted into the review process?* Project Number:* 20201360 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Kaylie Yankura:eads\kyankura Asheville Regional Office - (828) 296-4500 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 La ke (At Full Pond/Normal Water Level) �NVIJ`�h�, h� 11 Full Pond/ Normal Water Level i00 Shoreline+-� v�- Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3 a 0 i, 0 m D O L m BANK HEIGHT (ERODED AREA) r t i Me I► 9 W 7A E +. r= a 0 i, 0 m D O L m BANK HEIGHT (ERODED AREA) r t i Me I► 9 W 7A E