HomeMy WebLinkAbout20201544 Ver 1_Pre-Filing Acknowledgement Email_20201102 Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, November 2, 2020 7:31 AM
To: Farrell, Sean C
Subject: Pre-Filing Meeting Request Acknowledgement - SR 1975 Lighthouse Road Pipe Burial
Waiver Request - SR 1975 Lighthouse Road Pipe Burial Waiver Request - 20201544
Ver 1
Attachments: DWR Pre-Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form
for SR 1975 Lighthouse Road Pipe Burial Waiver Request that you submitted on (date). The ID
number for that project is 20201544, Version 1 .
Reviewer Contact Information:
Reviewer:
Reviewer Email:
Reviewing Office: Wilmington Regional Office - (910) 796-7215
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email
address, as responses are not monitored.
tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20201544 Version* 1
Regional Office* Wilmington Regional Office-(910)796-7215
Reviewer List* Joanne Steenhuis
Pre-Filing Meeting Request submitted 10/22/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Sean Farrell
Contact Email Address* scfarrell@ncdot.gov
Project Name* SR 1975 Lighthouse Road Pipe Burial Waiver Request
Project Owner* NCDOT Division 3
Project County* Duplin
Owner Address: Street Address
5501 Barbados Blvd
Address Line 2
City State/Rovince/Region
Castle Hayne NC
Fbstal/Zip Code Country
28429 USA
Is this a transportation project?* (' Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (;' No
Do you know the name of the staff member you would like to request a meeting with?
Joanne Steenhuis
Please give a brief project description below.*
Due to existing steep geomorphic fall of the stream channel,the required
burial under GC4132 can not be met.We are proposing to bury the inlet of
the proposed main flow 60"CMP 1' below the streambed and set the pipe
at a 1.5%slope,which will put the outlet approximately 1.5'above the
streambed elevation.We will construct a riprap flume to prevent continued
scour on the outlet.
Please give a couple of dates you are available for a meeting.
10/26/2020
10/27/2020
10/28/2020
Please attach the documentation you would like to have the meeting about.
Duplin SR 1975 Lighthouse Road Pipe.pdf 16.63KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
4527. rt
Submittal Date 10/22/2020