HomeMy WebLinkAbout 260025_Plan of Action_20201102 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 26-25 County: Cumberland
Facility Name: Riverview Farm
Certified Operator Name: Robbie 0 wood Operator#: 1005726
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID): 1 2
Spillway (Yes or No): No No
Level (inches): 21" 16"
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
#NAME?
3. Earliest possible date to begin land application of waste: 6/23/2020
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Russel 0 Wood Phone:
Facility Owner/Manager(print)
Date: 6/22/2020
Facility Owner/Manager(signature)
Cover Page Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Riverview#1 (26-25) line m = 56.4 lb PAN
2. Structure ID: Riverview#2(26-25) line m = 388.2 lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n. lines1 +2+3+4+5+6= 444.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract# p. field# q. crop r. acres s.remaining IRR.t TOTAL PAN u.application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column r x s
2089 F1 Bermuda Pasture 1.95 100.00 195.0 3/1-9/30
2089 F2 Bermuda Pasture 10.99 100.00 1099.0 3/1-9/30
2089 F2a Bermuda Pasture 16.82 100.00 1682.0 3/1-9/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)= 2976.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II)= 444.6 lb. PAN
x. Crop's remaining PAN balance(line v from section III)= 2976.0 lb. PAN
y. Overall PAN balance(w-x)= -2531 lb. PAN
Summary Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Remaining PAN will very per irrigation gun therefore the remaining PAN numbers on this form are a
conservative estimate. Waste will be applied as soon as weather permits.
Summary Riverview Farm (26-25) PoA30day(6-22-20) Page 2 of 2
PLAN OF ACTION(PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Riverview#1 26-25
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 21.0 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches
c. line b- line a(inches in red zone)= -2 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 65,136 ft2
e. line c/12 x line d x 7.48 gallons/ft3 -81,203 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 74,019 ft3
h. current herd# 700 certified herd# 700
actual waste produced = current herd# x line g = 74,019 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 35,910 ft3
k. (lines h + i+j)x 7.48 x 30 days/line f= 137,045 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/20/2019 1.01 lbs/1000 gal.
m. ((lines e+k)/1000)x line I = 56.4 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Riverview#2 26-25
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches
c. line b-line a(inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 86,041 ft2
e. line c/12 x line d x 7.48 gallons/fe 160,897 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 88,823 ft3
h. current herd# 840 certified herd# 840
actual waste produced = current herd# x line g = 88,823 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 52,865 ft3
k. (lines h +i+j)x 7.48 x 30 days/line f= 176,637 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/20/2019 1.15 lbs/1000 gal.
m. ((lines e+k)/1000)x line I= 388.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 2 Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 26-25 County: Cumberland
Facility Name: Riverview Farm
Certified Operator Name: Robbie 0 Wood Operator#: 1005726
lagoon to the lowest point on the top of the dam for lagoons without spillways; and from
the current liquid level in the lagoon to the bottom of the spillway for lagoons with
spillways.
Structure 1 Structure 2 Structure 3 Structure 4
Lagoon Name (ID): 1 2
Spillway (Yes or No): No No
Level (inches): 21" 16"
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Quality prior to transfer of waste
to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
#NAME?
3. Earliest possible date to begin land application of waste: 6/23/2020
I hereby certify that I have reviewed the information listed above and included within the attached
Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.
Russel 0 wood Phone:
Facility Owner/Manager(print)
Date: 6/22/2020
Facility Owner/Manager (signature)
Cover Page Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR.STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Riverview#1 (26-25) line m = 56.4 lb PAN
2. Structure ID: Riverview#2 (26-25) line m = 388.2 lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n. lines1 +2+3+4+5+6= 444.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract# p. field# q. crop r. acres s.remaining IRR-L TOTAL PAN u.application window'
2 PAN balance BALANCE FOR
(lb/acre) FIELD(lbs.)
column r x s
2089 F1 Bermuda Pasture 1.95 100.00 195.0 3/1-9/30
2089 F2 Bermuda Pasture 10.99 100.00 1099.0 3/1-9/30
2089 F2a Bermuda Pasture 16.82 100.00 1682.0 3/1-9/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.Total PAN available for all fields(sum of column t)= 2976.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II)= 444.6 lb. PAN
x. Crop's remaining PAN balance(line v from section III)= 2976.0 lb. PAN
y. Overall PAN balance(w-x)= -2531 lb. PAN
Summary Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 2
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump& haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
Remaining PAN will very per irrigation gun therefore the remaining PAN numbers on this form are a
conservative estimate. Waste will be applied as soon as weather permits.
Summary Riverview Farm (26-25) PoA30day(6-22-20) Page 2 of 2
PLAN OF ACTION(PoA)FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Riverview#1 26-25
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 21.0 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches
c. line b-line a(inches in red zone)= -2 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 65,136 ft2
e. line c/12 x line d x 7.48 gallons/fe -81,203 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 74,019 ft3
h. current herd# 700 certified herd# 700
actual waste produced = current herd# x line g = 74,019 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 35,910 ft3
k. (lines h +i+j)x 7.48 x 30 days/line f= 137,045 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/20/2019 1.01 lbs/1000 gal.
m. ((lines e+ k)/1000)x line I= 56.4 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 1 Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID): Riverview#2 26-25
2. Current liquid volume in 25 yr./24 hr. storm storage&structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm &structural freeboard 19.0 inches
c. line b-line a(inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 86,041 ft2
e. line c/12 x line d x 7.48 gallons/fe 160,897 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 88,823 ft3
h. current herd# 840 certified herd# 840
actual waste produced = current herd# x line g = 88,823 ft3
certified herd#
i. volume of wash water according to structural design 0 ft3
j. excess rainfall over evaporation according to design 52,865 ft3
k. (lines h + i+j)x 7.48 x 30 days/line f= 176,637 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated L 12/20/2019 _ 1.15 lbs/1000 gal.
m. ((lines e+k)/1000)x line I = 388.2 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Structure 2 Riverview Farm (26-25) PoA30day(6-22-20) Page 1 of 1