HomeMy WebLinkAbout20031508 Ver 2_Certification of Completion_20080423Mar 22 10 02:03p Island Oak Realty 252 473 6555 p.1
Certification of Completion
DWQ Project No.: O 3- t S't g y 6 P County: W y cal e
Applicant: -?- n 1 no 15J
Project Name:_,r` APR lc
Date of Issuance of Wetland Permit: ? - - o o cES ;[W%*vjXT1 j ER E3WCAi
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit.
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the_a licant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I, _< \2?.„-\A,\ ?o, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401. Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: / Date: V . 'p. a -
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature: Date:
If this project was designed by a Certified Professional
I, /b'?'1 /? ?? ri'' as a duly registered Professional ?(i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized td observe (periodically,
weekly, full tune) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, other sup materials.
S ign re: Registration No. L^ oq Date 3Z23 210