Loading...
HomeMy WebLinkAbout260007_INSPECTIONS_20201102 (3'61vision of Water Resources Facility Number 2' - 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: e'rOmpliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: GrRiiutine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit:I 9----/M4 Arrival Time: Departure Time: /Q,' c �p County:� Region: / /t V Farm Name: ,4 C f60 J<t-n .- Owner Email: Owner Name: R Aldiebd Phone: Mailing Address: Physical Address: Facility Contact: OVp/C Title: 7174-r: Phone: Onsite Representative: f ���/B ✓ Integrator: � r/ 7 0.711&1•"' Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-Layer Dairy Calf -Feeder to Finish /57'/ Va Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder D Poul Ca'aci Po'. Non-Dairy Farrow to Finish —_ Beef Stocker Gilts •Non-La ers -- Beef Feeder Boars •Pullets -- Beef Brood Cow MIECE Other •Turke Poults Other I.Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes No ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach Waters of the State?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes Io ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes No ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 2/4/2015 Continued Facility Number: to - D 7 Date of Inspection: y--///--,Peolel Waste Collection&Treatment 4.Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? ❑ Yes Islo ❑ NA ❑ NE a. If yes,is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): // Observed Freeboard(in): p2 I 5.Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes [3 No ❑ NA ❑ NE (i.e.,large trees,severe erosion,seepage,etc.) 6.Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes Ergo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7.Do any of the structures need maintenance or improvement? 'es ❑ No ❑ NA ❑ NE 8.Do any of the structures lack adequate markers as required by the permit? ❑ Yes lago ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9.Does any part of the waste management system other than the waste structures require ❑ Yes 121Cro ❑ NA ❑ NE maintenance or improvement? Waste Application 10.Are there any required buffers,setbacks,or compliance alternatives that need ❑ Yes I No ❑ NA ❑ NE maintenance or improvement? 11.Is there evidence of incorrect land application?If yes,check the appropriate box below. ❑ Yes a1 o ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑/ Application Outside of Approved Area 12.Crop Type(s): /M �Zls/�:'L �$S,fiz�o�S / //�l'zii .l fJ -ei ' yid 13. Soil Type(s): 1 1 tf /70- „ -1 14.Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EKlo ❑ NA ❑ NE 15.Does the receiving crop and/or land application site need improvement? ❑ Yes D'No ❑ NA ❑ NE 16.Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes 20 ❑ NA ❑ NE acres determination? 17.Does the facility lack adequate acreage for land application? ❑ Yes dNo ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes I3 to ❑ NA ❑ NE Required Records&Documents 19.Did the facility fail to have the Certificate of Coverage&Permit readily available? ❑ Yes ❑ No ❑ NA ❑ NE 20.Does the facility fail to have all components of the CAWMP readily available?If yes,check ❑ Yes �o 0 NA ❑ NE the appropriate box. ❑WUP ['Checklists ❑Design ❑Maps ❑ Lease Agreements Other: 21.Does record keeping need improvement?If yes,check the appropriate box below. ❑ Yes L_'o ❑ NA ❑ NE ❑Waste Application ['Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections ['Monthly and 1" Rainfall Inspections ❑Sludge Survey 22.Did the facility fail to install and maintain a rain gauge? ❑ Yes [:]1 o ❑ NA ❑ NE 23.If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes [ o ❑ NA ❑ NE Page 2 of 3 2/4/2015 Continued Facility Number: b - 0-7 Date of Inspection: 9 24.Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes I l ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes lallo ❑ NA ❑ NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26.Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes [ o ❑ NA ❑ NE 27.Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ErIo ❑ NA ❑ NE Other Issues 28.Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ErNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29.At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ NA ❑ NE If yes,contact a regional Air Quality representative immediately. 30.Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes lNo ❑ NA ❑ NE permit?(i.e.,discharge,freeboard problems,over-application) 31.Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes l No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes IIo ❑ NA ❑ NE 33.Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes []No ❑ NA ❑ NE 34.Does the facility require a follow-up visit by the same agency? ❑ Yes Er-No ❑ NA ❑ NE Comments(refer to question#):Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). ail 1 (74),5z'i`_eG-1-ty1ir7`." Sa •-�— Reviewer/Inspector Name: ��lAl° Phone: �o-D ,'/51 Reviewer/Inspector Signature: Date: -71(- 03-0 Page 3 of 3 2/4/2015