Loading...
HomeMy WebLinkAboutSW6130901_Supplement_20130903Permit (to be provided by DWQ) � �F W A TF9 A i*•' 0 QG NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part /I/) must be printed, filled out and submitted along with all of the required information. I. PIROJECT.INFORMATION Project name Stone Gables Apartments Stormwater BMP Contact person Samuel J. Powers, PE Phone number 910.671.9530 Date 29-Aug-13 Drainage area number 1 II:DESIGN JNFORMATION Site Characteristics Drainage area 1,883,423'; ft2 Impervious area, post -development 1,610,837' ft2 %impervious ` 85.53 % Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 128,660,' ft3 222,4031ft3 OK, volume provided is equal to or in excess of volume required. u�l N ;(YorN) 3.0 in 0.35(unitless) 0.84,' (unitless) 0.13i in/hr OK 1.92 ft3/sec 4.61 ft3/sec 2.69 ft3/sec 252.00; fmsl 250.00! fmsl 249.50i fmsl 250.50 fmsl 249.50 fmsl 241.00` fmsl 240.00 fmsl 1.00 ft Y (Y or N) 25ff. fmsl OK Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by D4Q) a 11. -DESIGN INFORMATION Surface Areas Area, temporary pool 118,650 ft2 Area REQUIRED, permanent pool 50,852 ft' SAIDA ratio 2.70 (unitless) Area PROVIDED, permanent pool, Aperm pooh 97,697 ft` OK Area, bottom of 1 Oft vegetated shelf, Abet shelf 87,0721 ft` Area, sediment cleanout, top elevation (bottom of pond), AW wd 58,5741 ft ml Volumes Volume, temporary pool 222,408 ft' OK Volume, permanent pool, Vpem PWI 710,525: ft3 Volume, forebay (sum of forebays if more than one forebay) 133,0701 ft3 Forebay % of permanent pool volume 18.7% % OK SAIDA Table Data Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.70 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) N (Y or N) Volume, permanent pool, Vpen-pool 710,525 ft' Area provided, permanent pool, Apewpoa 97,697 ft` Average depth calculated 7.00 ft OK Average depth used in SAIDA, da,, (Round to nearest 0.5ft) 7.011 ft OK Calculation option 2 used? (See Figure 10-2b) Y j (Y or N) Area provided, permanent pool, Apermyool 97,697 ft` Area, bottom of 10ft vegetated shelf, Abor shelf 87,072 ft2 Area, sediment cleanout, top elevation (bottom of pond). Abot-pond 58,574 ft2 "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 8.50 ft Average depth calculated 7.631 ft OK Average depth used in SAIDA, da , (Round to down to nearest 0.511) 7.5' ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 4.00. in D C 2 0 2.013 Area of orifice (if -non -circular) < in2 I Coefficient of discharge (CD) 0.K (unitless) Driving head (Ho) 0.67ft Drawdown through weir? N (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unitless) Length of weir (L) ft Driving head (H) It Pre -development 1-yr, 24-hr peak flow 1.92, ft3/sec Post -development 1-yr, 24-hr peak flow 4.611 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.69j;ft3/sec Storage volume drawdown time 3.751 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 31:1 OK Vegetated shelf slope 10 i :1 OK Vegetated shelf width 10.0' ft OK Length of flowpath to width ratio 4', :1 OK Length to width ratio 3.5:1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.6-ft OK Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump Out Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III;`; REQUIRED ITEMS CHECKLIST ,,. , � � �' { Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. SIP C203 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. C'111 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. S_ C19 11 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. Sp C 104 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified . 'UVV%T on the plans prior to use as a wet detention basin. S �� I�QF• D 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. S�Q C iO4- 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the Bova entire drainage area is stabilized. sN9 WS.R,LS,C 7. The supporting calculations. S�Q A 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. W I A its A 9. A copy of the deed restrictions (if required). ImfMkf S�Q "._ 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1