Loading...
HomeMy WebLinkAboutNCC204926_NOI Application_20201102Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 10/30/2020 8:11:22 AM (NCG01 NOI Submission) Approve by Gamble, Aana C 10/30/2020 9:21:14 AM (Review- Construction NOI 34581) • The task was assigned to Gamble, Aana C by round robin distribution 10/30/2020 8:12 AM • The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: November 3, 2020 5:00 PM. The priority is: High 10/30/2020 8:12 AM Submit by Selkane, Aziza 11/2/2020 10:21:26 AM (Payment Verification for NCC204926) * Holly Ntemann • Selkane, Aziza assigned the task to Selkane, Aziza 11/2/2020 10:19 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 11, 2020 5:00 PM. The priority is: High 10/30/2020 9:21 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Geotechnical Investigation for the Roxboro Afterbay Auxiliary Spillway 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers 2. County* Person 3. Highway or Street Edwin Robertson Road Address* Street name only is acceptable if no address number assigned yet 4. CityorTownship* Semora 5. State * NC 6. Zip Code * 27343 7. Latitude* Enter the latitude in decimal degrees 36.5228 8. Longitude * Enter the longitude in decimal degrees (K JST be negative) -78.9981 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 11/02/2020 Estimated Construction Project Start Date 10. Date to End* 03/31/2021 Estimated Construction Project End Cate 11. SIC (Primary)* Industrial (1541) Standard Industrial Oassification for Development 12. Acres to be 1.65 disturbed* (including off -site borrow and waste areas) 13. Total site area 25.00 (acres) * 14. Post- 0.00 construction (Estirrated) impervious area (acres) * NCC Project NCC-PERSO-2020-Geotechnical Investigation for the Roxboro Tracking ID Afterbay Auxiliary Spillway Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Hyco Reservoir Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 22-58-(0.5) Index No.* NCWaterbody Index Nunber Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Progress LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Duncan If Corporation, enter Faegistered Agent First %rre 3. Last Name* Brewer It Corporation, enter Pbegistered Agent Last %rre 3b. Title Project Director CCP Project Managment 4. Permitee E-mail duncan.brewer@duke-energy.com Address* 5. Permittee 336-330-2058 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 1551-PEB3A Address Line 2 City State / Frovince / Fbgion Raleigh NC Fbstal / Zip Code Country 27602 United States Check box if the F Yes street address the same as mailing address 7. Permittee Street Street Address Address* 1700 Dunnaway Road Address Line 2 City State / Frovince / Region Semora NC Fbstal / Zip Code Country 27343 US 8. Type of Individual Ownership C. Site Contact Information Part C. Roject Site Contact Inforrration ......................................................................................................................................................................................................... 1. Primary Site Duncan Contact - First Name * 2. Primary Site Brewer Contact - Last Name * 3. Title Project Director CCP Project Managment 4. Site Contact E- duncan.brewer@duke-energy.com mail Address* 5. Site Contact 336-330-2058 Telephone No. 6. Organization Duke Energy Name 7. Site Contact Street Address Mailing Address* 170 Dunnaway Road Address Line 2 city Semora Fbstal / Zip Code 27343 8. Consultant Name (Optional) Samuel Kees First and Last nacre 9. Consultant E-mail Skees@schnabel-eng.com This person will be copied on all correspondence. 10. Consultant 336-274-9456 Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 10/28/2020 Approved * 2. E&SC Plan Project PERSO-2021-005 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan PERSO-2021-005_20201028_LOA.pdf 256.72KB Approval letter or Mast beRDFformat Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification eNO1 certification Rox505.pdf 61.81 KB Form Mist be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Duncan Brewer Title Project Director CCP Project Management Organization Legally Plesponsible Entity Duke Energy Progress LLC Date * 10/30/2020 F. Tracking and COC Info NOI Tracking No. 34581 NC Reference No. NCG01-2020-4926 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC204926 Coverage (COC) Uses 'count number' variable (increrrented by SP) No.* Count Number 4926 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC204926-2020 Invoice Due Date 11/29/2020 Initial Fee $ 100.00 Invoice Status OPEN