Loading...
HomeMy WebLinkAboutNCG030308_CEI_20201030ROY COOPER Governor MICHAEL S. REGAN` Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality October 30, 2020 Godwin Manufacturing Co., Inc. Attn: Ryan Taylor, CEO PO Box 1147 Dunn, NC 28335 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG030000 Godwin Mfg Co, Certificate of Coverage NCG030308 Harnett County Dear Mr. Taylor: On October 29, 2020, Michael Lawyer, Environmental Program Consultant, and Penny Markle, Environmental Specialist, with the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DENMLR) conducted a site inspection for the Godwin Mfg Co facility located at 17666 US Highway 421 South, Dunn, Harnett County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Ms. Cathy Jackson, Executive Assistant, was also present during the inspection and her time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG030000 under Certificate of Coverage NCG030308. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Mingo Swamp, class C;Sw waters in the Cape Fear River Basin. As a result of the inspection, the facility was found to be compliant with the conditions of the NCG030000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or via e-mail at mike. lawyer@ncdenr.gov. Sincerely, .�T Michael Lawyer, CPSWQ Environmental Program Consultant DEMLR Enclosure: Compliance Inspection Report ec: Cathy Jackson, Executive Assistant — Godwin Manufacturing Co., Inc. Chris Ward, Plant Manager — Godwin Manufacturing Co., Inc. cc: FRO — DEMLR, Stormwater Files North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Q E Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 Q;-I/ NOFrr.i r..aa �Nn oaaemacmrmaoMrem�uuni� ,'r""� 910.433.3300 Compliance Inspection Report Permit: NCG030308 Effective: 11/01/18 Expiration: 05/31/21 Owner: Godwin Mfg Co SOC: Effective: Expiration: Facility: Godwin Mfg Co County: Harnett 17666 US Hwy 421 S Region: Fayetteville Dunn NC 28334 Contact Person: Chris Ward Title: Plant Manager Phone: 910-892-0141 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Cathy Jackson 910-591-5202 Related Permits: Inspection Date: 10/29/2020 Entry Time 10:05AM Exit Time: 01:15PM Primary Inspector: Mike Lawyer Phone: 910-433-3394 Secondary Inspector(s): Penny Markle?A/\ Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: E Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030308 Owner- Facility: Godwin Mfg Co Inspection Date: 10/29/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: Reviewed the facility's Stormwater Pollution Prevention Plan (SPPP), which appeared to contain all necessary components and associated documentation pertaining to the annual review and update requirements. A written Solvent Management Plan could be incorporated into the SPPP to waive the TTO monitoring requirement Monitoring records from 2017 through 2020 for two stormwater discharge outfalls that had been identified by the facility were reviewed. There have been occasional, non-consecutive exceedances of the benchmark values for Copper and Zinc and one exceedance of the benchmark value foi TSS. During site observations, three additional stormwater discharge outfalls were identified. The additional outfalls and direction of flow need be added to the site map and the outfalls need to be monitored per the conditions of the permit. It was relayed by the inspectors that two of the additional outfalls, which are located near outfall #1 could potentially be covered under Representative Outfall Status (ROS) being granted for outfall #1. A copy of the ROS Request Form will be included with the inspection report. Secondary containment is provided for ASTs, however it appeared that the drain valve for one of the containment structures did not have a locking mechanism. At the time of inspection, facility grounds appeared to be well maintained. Page 2of3 Permit: NCG030308 Owner- Facility: Godwin Mfg Co Inspection Date: 10/29/2020 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? E ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? N ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? N ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑'E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? KEI ❑ ❑ Comment: Page 3 of 3