Loading...
HomeMy WebLinkAbout20201544 Ver 1_Meeting Request Review_20201022 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnYlmnal2nlrtl Qua fay ID#* 20201544 Version* 1 Regional Office* Wilmington Regional Office-(910)796-7215 Reviewer List* Joanne Steenhuis Pre-Filing Meeting Request submitted 10/22/2020 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Sean Farrell Contact Email Address* scfarrell@ncdot.gov Project Name* SR 1975 Lighthouse Road Pipe Burial Waiver Request Project Owner* NCDOT Division 3 Project County* Duplin Owner Address: Street Address 5501 Barbados Blvd Address Line 2 City State/Rovince/Region Castle Hayne NC Fbstal/Zip Code Country 28429 USA Is this a transportation project?* (' Yes r No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes (;' No Do you know the name of the staff member you would like to request a meeting with? Joanne Steenhuis Please give a brief project description below.* Due to existing steep geomorphic fall of the stream channel,the required burial under GC4132 can not be met.We are proposing to bury the inlet of the proposed main flow 60"CMP 1' below the streambed and set the pipe at a 1.5%slope,which will put the outlet approximately 1.5'above the streambed elevation.We will construct a riprap flume to prevent continued scour on the outlet. Please give a couple of dates you are available for a meeting. 10/26/2020 10/27/2020 10/28/2020 Please attach the documentation you would like to have the meeting about. Duplin SR 1975 Lighthouse Road Pipe.pdf 16.63KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature S rt Submittal Date 10/22/2020 Reviewer Meeting Request Decision Has a meeting been scheduled?* r Yes r No