Loading...
HomeMy WebLinkAbout20052132 Ver 2_Pre-Filing Meeting Request_20200930ID#* 20052132 Version* 2 Regional Office* Washington Regional Office - (252) 946-6481 Reviewer List* Robert Tankard Pre -Filing Meeting Request submitted 9/30/2020 Contact Name * Brian Rubino Contact Email Address* brubino@quible.com Project Name* Sandy Point Development Project Owner* The Fund for Sandy Point North Carolina, LLC, Attn: Sam Young Project County* Chowan Owner Address: Street Address P.O. Box 789 Address Line 2 aty State / Province / Region Edenton NC Fbstal / Zip Code Country 27932 USA Is this a transportation project?* r Yes r No Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F- 401 Water Quality Certification - Regular Express r- Individual Permit W Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* 401 Cert Do you know the name of the staff member you would like to request a meeting with? Chris Pullinger Please give a brief project description below.* This is an existing project for a mixed -use waterfront development. It has been permitted under CAMA Major #138-06 (which is valid until 12/31/2020). There is an associated 401 Water Quality Certification that expires with the CAMA Permit DWQ #05-2132. At this time, we are seeking a permit modification for replacement of an older wood bulkhead (361 ft only) to be built immediately adjacent to the existing one at the Sandy Point Historic Homesite. This is the only design modification for the entire project. To date, the boat channels have been dredged and all compensatory mitigation has been successfully completed. No upland development has occurred. In association with this modification, USACE will also be including a General Permit through the existing CAMA Permit (the 291 Joint permitting process). Initially, USACE permitted this through an Individual Permit, but since new dredging and mitigation has been complete/satisfied, they will be able to cover this through the 291 Process moving forward. In summary, if a meeting is required, this would be looking at the new bulkhead replacement with no wetland impacts. We have thoroughly discussed this with NCDCM and USACE. No other design modifications are requested, Thanks, Brian Rubino Please give a couple of dates you are available for a meeting. 10/2/2020 10/7/2020 10/5/2020 Please attach the documentation you would like to have the meeting about. P03178-2020 CAMA MOD-EXHIBIT-091720.pdf 219.03KB bulkhead replacement photo.pdf 4.79MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/30/2020 Q:\ZUU.S\pu,)i lb\UYOwingS\(-AMA\F'UJI lb—J I WUKKING ZUZU.UW(, y/ZI/ZUZU Z:Ub F'M Imu NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTIO1N, RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS DOCUMENT DOES NOT REPRESENT A COMPLETE ACCURATE SURVEY AND IS NOT CERTIFIED BY A LICENSED PROFESSIONAL LAND SURVEYOR. ALL INFORMATION SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY REGULATORY AGENCY, ENTITY OR AUTHORITY. QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE USE OF THIS INFORMATION. PROPOSED DREDGE SPOIL I LOCATION f5.69 ACRES ' (20) TRANSIENT SLIPS I 18' X 40' 1 .. SPOIL RETEN� BERM N. WI12 11 . �� PUBLIC PIER Im-m-olaa 'BENS ACE ' 16' X 35\ RESIDENTIAL SUP TYP. W 3 FUEL/ PUMP -OUT aQ SLIPS 18' X 40' GREENSPACE GROINS CONSTRUCTED IN 2009 SHEET PILE GROIN 2 FT. x 100 FT. EXISTING a 514 LF BULKHEAD + + �M 7r777'\���7 7F7�LU �-�-Ll_L I1111 �1 - —� 75' AM L GREENSPACE 30' _ 1 PROPOSED REPLACEMENT \ BULKHEAD 2 FT WATERWARD OF EXISTING (361 LF) EXISTING 100 LF OF PIER CONSTRUCTED IN 2018 (COMPLETE 235 LF PIER AND PLATFORM AT A LATER DATE) 6 FT. WIDE - 235 LF. PIER WITH 12 FT. x 12 FT. PLATFORM CHANNEL EXCAVATED IN 2009 PROJECT COPYRIGHT CQ 2020 2= CAM" MODIFICATION PLAN NC License#: C-0208 P03178 QUIBLE & ASSOCIATES, P.C. THIS DOCUMENT IS THE PROPERTY OF QuibleSINCE 1959 SANDY POINT QUIBLE &ASSOCIATES, P.C. ANY ALTERATION OF THIS DOCUMENT IS DRAWN BY PROHIBITED. & Associates P.C. TAZ/AZ/JTM IF THIS DOCUMENT IS NOT SIGNED AND SEALED BY A LICENSED PROFESSIONAL THEN THIS DOCUMENT SHALL BE ENGINEERING** * CONSULTING * PLANNING ENVIRONMENTAL SCIENCES * SURVEYING** CHECKED BY YEOPIM TOWNSHIP CHOWAN COUNTY BDR CONSIDERED PRELIMINARY, NOT A NORTH CAROLINA **ENG./SUR. NOT OFFERED AT BLACK MTN. OFFICE" CERTIFIED DOCUMENT AND SHALL NOT BE USED FOR CONSTRUCTION, 8466 Caratoke Hwy, Powells Point, NC 27966 Phone: (252) 491-8147 Fax: (252) 491-8146 0 200 400 DATE RECORDATION, SALES OR LAND 90 Church St., Ste. B, Black Mountain, NC 28711 09/17/20 CONVEYANCES, UNLESS OTHERWISE "=200 Phone: (828) 793-0398 Fax: (252) 491-8146 NOTED. GRAPHIC SCALE IN FEET 1 a dministratorOquible.com