HomeMy WebLinkAbout20052132 Ver 2_Pre-Filing Meeting Request_20200930ID#* 20052132 Version* 2
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 9/30/2020
Contact Name * Brian Rubino
Contact Email Address* brubino@quible.com
Project Name* Sandy Point Development
Project Owner* The Fund for Sandy Point North Carolina, LLC, Attn: Sam Young
Project County* Chowan
Owner Address: Street Address
P.O. Box 789
Address Line 2
aty
State / Province / Region
Edenton
NC
Fbstal / Zip Code
Country
27932
USA
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit W Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
401 Cert
Do you know the name of the staff member you would like to request a meeting with?
Chris Pullinger
Please give a brief project description below.*
This is an existing project for a mixed -use waterfront development. It has
been permitted under CAMA Major #138-06 (which is valid until
12/31/2020). There is an associated 401 Water Quality Certification that
expires with the CAMA Permit DWQ #05-2132.
At this time, we are seeking a permit modification for replacement of an
older wood bulkhead (361 ft only) to be built immediately adjacent to the
existing one at the Sandy Point Historic Homesite. This is the only design
modification for the entire project. To date, the boat channels have been
dredged and all compensatory mitigation has been successfully completed.
No upland development has occurred. In association with this modification,
USACE will also be including a General Permit through the existing CAMA
Permit (the 291 Joint permitting process). Initially, USACE permitted this
through an Individual Permit, but since new dredging and mitigation has
been complete/satisfied, they will be able to cover this through the 291
Process moving forward.
In summary, if a meeting is required, this would be looking at the new
bulkhead replacement with no wetland impacts. We have thoroughly
discussed this with NCDCM and USACE. No other design modifications are
requested,
Thanks,
Brian Rubino
Please give a couple of dates you are available for a meeting.
10/2/2020
10/7/2020
10/5/2020
Please attach the documentation you would like to have the meeting about.
P03178-2020 CAMA MOD-EXHIBIT-091720.pdf 219.03KB
bulkhead replacement photo.pdf 4.79MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 9/30/2020
Q:\ZUU.S\pu,)i lb\UYOwingS\(-AMA\F'UJI lb—J I WUKKING ZUZU.UW(, y/ZI/ZUZU Z:Ub F'M Imu
NOTE: THIS DOCUMENT IS PRELIMINARY - NOT FOR CONSTRUCTIO1N,
RECORDATION, SALES OR CONVEYANCES - THIS DOCUMENT IS FOR
DISCUSSION PURPOSES ONLY! EXISTING INFORMATION SHOWN ON THIS
DOCUMENT DOES NOT REPRESENT A COMPLETE ACCURATE SURVEY AND IS NOT
CERTIFIED BY A LICENSED PROFESSIONAL LAND SURVEYOR. ALL INFORMATION
SHOWN ON THIS DOCUMENT IS SUBJECT TO ANY REQUIREMENTS BY ANY
REGULATORY AGENCY, ENTITY OR AUTHORITY.
QUIBLE & ASSOCIATES, P.C. DOES NOT GUARANTEE THE ACCURACY OR THE
COMPLETENESS OF ANY INFORMATION IN THIS DOCUMENT AND IS NOT RESPONSIBLE
FOR ANY ERROR OR OMISSION OR ANY LOSSES OR DAMAGES RESULTING FROM THE
USE OF THIS INFORMATION.
PROPOSED DREDGE SPOIL I
LOCATION f5.69 ACRES ' (20) TRANSIENT SLIPS I
18' X 40'
1 ..
SPOIL RETEN� BERM
N. WI12 11 . �� PUBLIC PIER
Im-m-olaa
'BENS ACE
'
16' X 35\
RESIDENTIAL
SUP TYP.
W
3 FUEL/ PUMP -OUT
aQ
SLIPS
18' X 40'
GREENSPACE
GROINS CONSTRUCTED
IN 2009
SHEET PILE GROIN
2 FT. x 100 FT.
EXISTING
a 514 LF
BULKHEAD
+ +
�M
7r777'\���7 7F7�LU
�-�-Ll_L I1111 �1
- —� 75' AM
L GREENSPACE
30' _
1
PROPOSED REPLACEMENT
\ BULKHEAD 2 FT WATERWARD
OF EXISTING (361 LF)
EXISTING 100 LF OF PIER CONSTRUCTED IN 2018
(COMPLETE 235 LF PIER AND PLATFORM
AT A LATER DATE)
6 FT. WIDE - 235 LF. PIER WITH
12 FT. x 12 FT. PLATFORM
CHANNEL EXCAVATED IN 2009
PROJECT
COPYRIGHT CQ 2020
2= CAM" MODIFICATION PLAN
NC License#: C-0208
P03178
QUIBLE & ASSOCIATES, P.C.
THIS DOCUMENT IS THE PROPERTY OF
QuibleSINCE 1959
SANDY POINT
QUIBLE &ASSOCIATES, P.C. ANY
ALTERATION OF THIS DOCUMENT IS
DRAWN BY
PROHIBITED.
& Associates P.C.
TAZ/AZ/JTM
IF THIS DOCUMENT IS NOT SIGNED AND
SEALED BY A LICENSED PROFESSIONAL
THEN THIS DOCUMENT SHALL BE
ENGINEERING** * CONSULTING * PLANNING
ENVIRONMENTAL SCIENCES * SURVEYING**
CHECKED BY
YEOPIM TOWNSHIP CHOWAN COUNTY
BDR
CONSIDERED PRELIMINARY, NOT A
NORTH CAROLINA
**ENG./SUR. NOT OFFERED AT BLACK MTN. OFFICE"
CERTIFIED DOCUMENT AND SHALL NOT
BE USED FOR CONSTRUCTION,
8466 Caratoke Hwy, Powells Point, NC 27966
Phone: (252) 491-8147 Fax: (252) 491-8146
0 200 400
DATE
RECORDATION, SALES OR LAND
90 Church St., Ste. B, Black Mountain, NC 28711
09/17/20
CONVEYANCES, UNLESS OTHERWISE
"=200
Phone: (828) 793-0398 Fax: (252) 491-8146
NOTED.
GRAPHIC SCALE IN FEET 1
a dministratorOquible.com