Loading...
HomeMy WebLinkAbout20201354 Ver 1_Pre-Filing Meeting Request_20200930ID#* 20201354 Version* 1 Regional Office* Winston-Salem Regional Office - (336) 776-9800 Reviewer List* Sue Homewood Pre -Filing Meeting Request submitted 9/30/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Kelly Boone, CDM Smith boonekr@cdmsmith.com Richland Creek Sewer Outfall Aerial Sewer Pipe Replacement City of High Point, Mr. Derrick Boone, Asst. Public Services Director Guilford Street Address 211 S. Hamilton St. Address Line 2 Room 206 aty High Point Rbstal / Zip Code 27260 Is this a transportation project? * r Yes r No Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit F Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No State / Frovince / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below. * Project involves replacement of 16 aerial segments of an existing 48-inch sewer along Richland Creek in an existing easement. Wetlands and streams have been delineated by CDM Smith. It is currently anticipated that only the sewer pipe will be replaced; the concrete pipe supports will remain as is with only minor structural repairs. New manholes will be installed on the sewer to facilitate access and repairs. It is expected that impacts to streams and wetlands will be temporary. Few, if any, permanent impacts are anticipated at this time. This assessment will be further refined with development of design. It is anticipated that this project will meet conditions of USACE Nationwide Permit program and corresponding DWR General Certifications for WQC. Please give a couple of dates you are available for a meeting. 10/19/2020 10/26/2020 10/27/2020 Please attach the documentation you would like to have the meeting about. 2020 03 19—Rich land Creek - FINAL route 1.24MB figure.pdf pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/30/2020