Loading...
HomeMy WebLinkAbout20201577 Ver 1_PreFiling Acknowledgement Email_20201029Strickland, Bev From: lase rf iche @ ncde n r.gov Sent: Thursday, October 29, 2020 8:08 AM To: gerald@mogmit.com Subject: Pre -Filing Meeting Request Acknowledgement - SPC Zebulon site - 20201577 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for SPC Zebulon site that you submitted on 10/23/2020. The ID number for that project is 20201577, Version 1. Reviewer Contact Information: Reviewer: Rick Trone Email: rick.trone@ncdenr.gov Reviewing Office: Central Office - (919) 707-9000 You will either be contacted by staff to set up a meeting or notified by email that the 30 calendar day clock has been reached and you are allowed to submit your application. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID# * 20201577 Version * 1 Regional Office* Central Office - (919) 707-9000 Reviewer List* Rick Trone Pre -Filing Meeting Request submitted 10/23/2020 Contact Name * Contact Email Address Project Name* Project Owner* Project County* Owner Address: Gerald Pottern gerald@mogmit.com SPC Zebulon site Chris Williford, SPC Mechanical Wake Street Address 1908 Baldree Rd S. Address Une 2 aty Wilson Fbstal / Zip ODde 27893 Is this a transportation project?* r Yes r No State / Frovince / Pbegion NC Country us Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Please list all existing project ID's associated with this projects.* NBRRO#19-289 SAW-2019-01775 Do you know the name of the staff member you would like to request a meeting with? Cheng Zhang did the field confirmation in Sept 2019 Please give a brief project description below.* SPC Mechanical is planning to build a commercial HVAC manufacturing facility on the site. The proposed site plan avoids the FEMA 1 % floodplain and riparian buffers along Little Creek, but a small %etland on an unnamed tributary along the south edge of Gannon Ave is unavoidable. On Sept 1, 2019, Samantha Dailey of USACE confirmed that the channel Wthin the affected %etland is NOT a stream, and Cheng Zhang of NCDWR confirmed that the tributary is NOT subject to Neuse buffers. The proposed permanent impact Wll be 3,556 sq.ft (0.082 acre) of wetland, mostly non - forested. There is no temporary impact to %etlands, streams, or Neuse buffers. Runoff from developed areas on the site will be routed to a stormwater detention basin and discharged onto a riprap dissipator at the edge of the vvetland and floodplain along Little Creek. See attached site plan. Please give a couple of dates you are available for a meeting. 10/26/2020 Please attach the documentation you would like to have the meeting about. 44838C- Rev- EXII. 0- IMPACT- EX2. 0 Wetland 1.2MB Impact.pdf Zebulon ACE PJD-Request Maps-2.pdf 794.56KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 10/23/2020