Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCS000548_Map (Topo) from DWR_20191221
��//// ° � � � - o ' o -. � � o �c ; ..7✓�•0 � � °� � .� 1 ��i' L,r.,.�',- / \ - :dam. q I �l �9 / PROPOSED CLEAN WATER I o INFILTRATION STORAGE TANK ✓° .9 Ly a P � b �Ci O O "' � ` K,7.�,y T O I \ \ ° o � �� n� 4 /\ aa9°�.. (�.° � �^ 4' � `'. , �'.. o - 4 � y �° °a ¢� ��Ss'a °• ;CCR-15S � i e o - � ° �"o�J�'e'•a�ge °, v�'6 `�.• °.� p' � � P' _ .e CCR-15D // �� -07 / °Qp / / � — — � 1 � f ° %° �. ° o > ` •,, �r • ° �' �_� MW-2 ' \ °� •e _ �/ / EX-06/ ° 1 a • e�' si \ ° EX-04 MW-14 ° o GQ AB-10D ® MW 14S'' 4 fl ° EX-0301 •�. - °~ AB 10BR / ° PROPOSED EXTRACTION ' D EX-0COLLECTION \ GWA-10S EX-01 PROPOSED EXTRACTION COLLECTION *q b q IN-1 0 Q, _ _ r r� °4 •$ ,;,• AND PUMP STATION EX-56 0 a.. j�D \\ _ •a'aQ EX-12 `\ / ° � \ -\d // \\D � a,. - 3 t.m De?3.. ^ ° ati• `a �� �,jo - fl / BORROW AREA • / P ° ° j� -- o�j o 4' \ I � 6,q \1\\°o-� vy / �IN,15' � • . EX-13 9 • IN-16 / AL-1S $� // b / // � °�4• ° ° ' moo• a =�io�� ea EX-17 IN-10 \ GWA-11BR I N-20 IN-21 • / /� \\ ° EX-19 IN-12 �-IN-224 EX-20 DRY ASH LANDFILL -PHASE I (PERMIT NO. 1804 o ya / / / /' a o a a / / / / CCR-12S - 9 °� 1 TREANMENTEPLANT TO THE S ORAGE TA OK OSED r� a .. •I t= ) � .� _ 1 CCR-12D G7 , \� � • Ex-24 PIPING TO INSTALLED BYBOR/NG $ Ex-27 CONCRETE SPILLWAY EMERGENCY SPILLWAY r \ // �/ °i o \ NEW WASTE WATER TREATMENT PAD 9 / \ •• n �'�'� � I NEW OUTFLOW STRUCTURE \ \ EXISTING 36" DISCHARGE PIPE TO / / /� (APPROXIMATE) / / CCR-91 TIE TREATED GROUNDWATER LINE TO EXISTING 36" LINE WHICH DISCHARGES TO NPDES OUTFALL 002 a \ sl Q• o "- D s ° P a \ \\ % / / AB-16RLL o. \ \� °16 (INACTIVE) LEGEND \ \ d \ \ \\ �. // / / / EX-45 O EX-44 EXTRACTION WELL IN BEDROCK FLOW ZONE DUKE ENERGY CAROLINAS PROPERTY LINE �i EX-06 EXTRACTION WELL IN SAPROLITE, TRANSITION AND BEDROCK FLOW ZONE — — — — ASH BASIN COMPLIANCE BOUNDARY ® IN-14 CLEAN WATER INFILTRATION WELL IN THE SAPROLITE FLOW ZONE — ASH BASIN WASTE BOUNDARY ABMW-0 MONITORING WELL IN ASH PORE WATER LANDFILL COMPLIANCE BOUNDARY EX47 / MW-06S MONITORING WELL IN SAPROLITE MATERIAL — — LANDFILL BOUNDARY GWA-51D MONITORING WELL IN TRANSITION ZONE PROPOSED CLEAN WATER INFILTRATION PIPING Q• / / 14 \ F} \ �� o a ©a / / / } a.;0 � \ 6g• °tom.. ,'ooG>.a Cc_�-• d a• / / / MW-01BR MONITORING WELL IN COMPETENT BEDROCK PROPOSED CLEAN WATER INFILTRATION PIPING FLOW DIRECTION AB-3BR ABANDONED MONITORING WELL PROPOSED EXTRACTION WELL COLLECTION LINE b / \ e °° ° ' - / / EX-48 O S- NON -CONSTRUCTED SEEP (APPROXIMATE) PROPOSED EXTRACTION WELL COLLECTION LINE FLOW DIRECTION ® NPDES REGULATED PLANT WATER PROPOSED EXTRACTION WELL COLLECTION MAIN LINE NPDES REGULATED PLANT WATER FLOW DIRECTION y PROPOSED EXTRACTION WELL COLLECTION MAINLINE FLOW DIRECTION EX-49 EFFLUENT CHANNEL (APPROXIMATE) [NON -JURISDICTIONAL] 720 10 FOOT CONTOUR (2016 LIDAR BASED) ® ASH BASIN PONDED WATER (APPROXIMATE) 2 FOOT CONTOUR (2016 LIDAR BASED) _ $ / / EX-50 0 WETLAND BY McKIM & CREED 1A 0 -2B STREAM BY McKIM & CREED O SURFACE WATER (AERIAL PHOTOGRAPH AND TOPOGRAPHIC MAP BASED) NOTES m 1.) ALL BOUNDARIES ARE APPROXIMATE. \ / / 2.) SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. THEREFORE LOCATIONS ARE DEEMED TO BE APPROXIMATE. \ ° \ o• ° / 3.) DUKE ENERGY PROPERTY LINES ARE REPRESENTED BASED ON DUKE ENERGY'S INTERPRETATION OF HISTORICAL DOCUMENTED PROPERTY BOUNDARIES AND CURRENT CATAWBA EX-52 COUNTYGIS. 4.) THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP IS NOT TO BE USED FOR �� o< \ ° \` ` m /�• / �' JURISDICTIONAL DETERMINATION PURPOSES. THE WETLANDS AND STREAM BOUNDARIES WERE OBTAINED FROM A STREAM AND WETLAND DELINEATION BY McKIM & CREED MARCH 2O16. 5.) THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. THE TOPOGRAPHY BASED ON A COMBINATION OF SOURCES. LIDAR DATA OBTAINED FROM NC FLOODPLAIN MAPPING PROGRAM -SPATIAL DATA DOWNLOAD AT https://sdd.nc.gov/DataDownload.aspx# ° \ O \ \ \ pa ' / /° / d EX-53 DATA WAS SOURCED FROM THEIR PHASE 4 - 2016 QL2 LIDAR �•{ _ `"'°. d 6.) SITE FEATURES INCLUDING UTILITIES ARE BASED ON SEVERAL SOURCES. ANY UTILITIES SHOWN ARE FOR REFERENCE PURPOSES ONLYAND HAVE NOT BEEN FIELD VERIFIED WITH / ° / REGARDS TO THEIR HORIZONTAL OR VERTICAL LOCATIONS IN THE FIELD. ALL FEATURES INCLUDING UTILITIES ARE DEEMED TO BE APPROXIMATELY LOCATED. CCR 5S \ _\\\ \ / �' � 2015 AERIAL PHOTOGRAPHS OBTAINED FROM NC ONE MAP AT https://nconemap.maps.arcgis.com/apps/webappviewer/index.html. id_ 2c8a9b366c4841f1be2b464347d04a2b 2014 AERIAL PHOTOGRAPH FROM WSP DATED APRIL 2014. DRAWING TITLED "ASBUILT SURVEY, SHEET 1 OF 1 BY CHRISTIAN P SHURTER, PROFESSIONAL LAND SURVEYORP, PROJECT NUMBER 2482 AND CADD NO. 2482 2011003 DRAWING TITLED AERIAL TOPOGRAPHIC SURVEY FOR CLIFFSIDE BY WSP, JOB NUMBER 1570002.000 AND DRAWING FILE NAME APRIL2014_CLIFSIDE_FINAL_10-30-15.DWG DRAWING BY BECHTEL, LOS ANGLES TITLED "DRAINAGE PLANT AREA", REVISED FEBRUARY 23,1994, DRAWING NUMBER C-3027, REVISION 23 7.) DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIP 3200 (NAD83 AND NAVD 88). / ��, � \\ PROPOSED EXTRACTION COLLECTION � DUKE GRAPHIC SCALE'` 200 0 100 200 400 ENERGY (IN FEET) FIGURE ES-3 CAROLINAS DRAWN BY: J. CHASTAIN DATE: 12/21/2019 PROPOSED CORRECTIVE ACTION APPROACH 4 o Q �, - �\� \ w. /. o•P // ccR.4s ro REVISED BY: - DATE:- CORRECTIVE ACTION PLAN UPDATE CHECKED BY: B. GREEN DATE: 12/21/2019 MARSHALL STEAM STATION VIP APPROVED BY: W. GERALD DATE: 12/21/2019 TERRELL, NORTH CAROLINA PROJECT MANAGER: B WILKER o\ \ Terra www.synterracorp.com ° P ' syn IRGE STRUCTURE I TE) 002 TDOCK C:3° 0 LLECTION PROPOSED GROUND WATER EXTRACTION TREATMENT SYSTEM RA1 PROPOSED CLEAN WATER el LAKE NORMAN