Loading...
HomeMy WebLinkAbout090124_SSE Calculations_20201030 Sludge Survey Evaluation Form Today's Date10302020 Facility # 090124 Owner: Priest Farms #3 Lagoon ID1 Sludge Survey Received:9/23/2020 Sludge Survey Performed:12/16/2013 Sludge Depth (Row O): (ft) 3.6 Existing Treatment Depth (Row P): (ft) 5.60 Start Date:03/23/95 Facility age at time of survey:(yr)19 Average Sludge Accumulation (ft/yr):0.19 1 Requested Extension: (yr) Requested Due Date2021 Sludge Accumulation during extension period: (ft)0.19 5.41 Treatment Depth Available after Extension: (ft) Sludge level OK?YES Ratio Estimates Based on DepthEXISTINGEXEMPTION Ratio of Sludge layer to total trmt depth 0.390.41 Ratio of Sludge depth OK?NO EXISTINGEXEMPTION Average Sludge layer thickness (T)3.63.79 Depth of the lagoon from top of bank to bottom soil surface (D) 10.110.1 Slope=Horizontal/vertical side slope (S) 33 Length at the top of inside bank (L) 375375 Width at the top inside slope (W) 175175 Thickness of existing liquid treatment zone (Y) 5.605.41 Lm Length at midpoint of sludge layer ()=L-2S(D-(T/2)) 325.20325.78 Wm Width at midpoint of sludge layer ()=W-2S(D-(T/2)) 125.20125.78 Vs Volume of sludge ()=Lm*Wm*T 146574.14155377.42 Vsg Volume in gallons ()=Vs*7.481 1096521.171162223.10 Z Thickness of total treatment zone ()=T+Y 9.209.20 Lz Length at midpoint of total treatment zone ()=L-2(S)(D-(Z/2)) 342.00342.00 Wz Width at midpoint of total treatment zone ()=W-2(S)(D-(Z/2)) 142.00142.00 Vz Volume of total treatment zone ()=Lz*Wz*Z 446788.80446788.80 Ratio(R) of sludge layer volume to total trmt volume0.3280.348 Sludge Volume Ratio OK?YES Maximum extension until end of permit cycle Next survey to be done: (calendar yr) 12/31/2024 Notification letter mailed: 4/12/2019