HomeMy WebLinkAbout20201296 Ver 1_Pre-Filing Meeting Request_20200929 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnYlmnal2nlrtl Qua fay
ID#* 20201296 Version* 1
Regional Office* Mooresville Regional Office-(704)663-1699
Reviewer List* Donna Hood
Pre-Filing Meeting Request submitted 9/29/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Chris Tinklenberg
Contact Email Address* Chris.Tinklenberg@kimley-horn.com
Project Name* Cross Charlotte Trail- Davidson to Matheson
Project Owner* City of Charlotte
Project County* Mecklenburg
Owner Address: Street Address
600 East 4th Street
Address Line 2
City State/Rovince/Region
Charlotte NC
Fbstal/Zip Code Country
28202 USA
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
• Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes (' No
Do you know the name of the staff member you would like to request a meeting with?
Bryan Roden-Reynolds(USACE),Alan Johnson (DWR)
Please give a brief project description below.*
The project is located along an abandoned railroad right-of-way between E
24th Street and Jordan PI in Charlotte, Mecklenburg County, NC.The
proposed project includes the construction of a 12'wide and 16'wide
greenway.The project also includes the replacement of an abandoned
railway timber bridge structure with a 12'x 6' reinforced concrete box
culvert.
Please give a couple of dates you are available for a meeting.
10/7/2020
10/8/2020
10/9/2020
Please attach the documentation you would like to have the meeting about.
D2M Cover Sheet.pdf 610.52KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
teCt ar.. Gre
Submittal Date 9/29/2020