Loading...
HomeMy WebLinkAbout20201217 Ver 1_06b_PJD confirmation email 07-28-2020_20201029Roth, Kelly From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.miI> Sent: Tuesday, July 28, 2020 10:00 AM To: Roth, Kelly Subject: RE: Duke Energy Project Walter Sanitary Sewer site visit Hi Kelly. Your updated map for the Project Walter sewer site (SAW-2018-01747) appears to reflect the changes made and discussed during our site visit on 7/15/2020. 1 will use this map when processing the PJD and/or permit application/request for this site. Please let me know if you have any questions. -Dave Bailey David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Thank you for taking the time to visit this site and complete the survey. From: Roth, Kelly <roth@mcadamsco.com> Sent: Saturday, July 18, 2020 8:38 AM To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil> Subject: [Non-DoD Source] Duke Energy Project Walter Sanitary Sewer site visit Dave - The ORM form and updated delineation map for the Project Walter Sanitary Sewer project area are attached. I have not heard back from the PM about whether they want a PJD or AJD. But, I wanted to at least give you the ORM form and map now because I will be on vacation all next week. If I do hear back from the PM next week, either Jennifer or I will pass that info along to you. Thanks, Kelly Roth I Environmental Consultant II, Water Resources McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 x210 I direct 919. 287. 0716 1 roth@mcadamsco.com Blockedwww.mcadamsco.com I linkedin I twitter I instagram I loin our team 0 MAM creating experiences through experience 0210i ac ry s. I J \ \_L W2 /- 0.007 ac i i W30.001:ac �y`�� {{ s � W5 C ./-0.02Vao � x, �, ' �► •� . � rM� 4 � HOT d _ /,t17461 ac � II m I LEGEND — Streams Ponds ..._ �� - Wetlands Sanitary Sewer Sealer OUtfall ProjectArea ST RT S1 (Perennlal)r@'Prop'e rtyLlne (Continues from off-site)Project Walter Subject Property /-1890 LIF Parcel Boundaries Features depicted were field verified by \\ / 2-ft contours David Bailey of the USACE on 7/15/2020. j \ 0 75 150 FIGURE 4. JURISDICTIONAL AND ISOLATED WATERS DELINEATION MAP Feet PROJECT WALTER SANITARY SEWER OUTFALL 1 inch = 150 feet GARNER, WAKE COUNTY, NC VERSION: 2 DATE: 7/17/2020 JOB NO DKE- MCADAMS DRAWN BY: oth 18190 kC Pmiects\DKE\DKE-18190\Storm\Wetlands\GIS\Sanitary Sewer\DKE18190 Fioure 4 Delineation Mao2020-05-19—d, 71171202011. 02.36AM, roth