HomeMy WebLinkAbout20201217 Ver 1_06b_PJD confirmation email 07-28-2020_20201029Roth, Kelly
From: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.miI>
Sent: Tuesday, July 28, 2020 10:00 AM
To: Roth, Kelly
Subject: RE: Duke Energy Project Walter Sanitary Sewer site visit
Hi Kelly. Your updated map for the Project Walter sewer site (SAW-2018-01747) appears to reflect the changes made
and discussed during our site visit on 7/15/2020. 1 will use this map when processing the PJD and/or permit
application/request for this site. Please let me know if you have any questions.
-Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Phone: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0
Thank you for taking the time to visit this site and complete the survey.
From: Roth, Kelly <roth@mcadamsco.com>
Sent: Saturday, July 18, 2020 8:38 AM
To: Bailey, David E CIV USARMY CESAW (USA)<David.E.Bailey2@usace.army.mil>
Subject: [Non-DoD Source] Duke Energy Project Walter Sanitary Sewer site visit
Dave -
The ORM form and updated delineation map for the Project Walter Sanitary Sewer project area are attached. I have not
heard back from the PM about whether they want a PJD or AJD. But, I wanted to at least give you the ORM form and
map now because I will be on vacation all next week. If I do hear back from the PM next week, either Jennifer or I will
pass that info along to you.
Thanks,
Kelly Roth I Environmental Consultant II, Water Resources
McAdams
2905 Meridian Parkway, Durham, NC 27713
office 919. 361. 5000 x210 I direct 919. 287. 0716 1 roth@mcadamsco.com
Blockedwww.mcadamsco.com I linkedin I twitter I instagram I loin our team
0 MAM
creating experiences through experience
0210i ac
ry s.
I
J
\ \_L
W2
/- 0.007 ac
i
i W30.001:ac
�y`��
{{ s
� W5 C
./-0.02Vao � x,
�, ' �► •� . � rM�
4 �
HOT
d _ /,t17461 ac
� II
m I
LEGEND
— Streams
Ponds
..._ ��
- Wetlands
Sanitary Sewer Sealer OUtfall ProjectArea ST RT S1 (Perennlal)r@'Prop'e rtyLlne
(Continues from off-site)Project Walter Subject Property /-1890 LIF
Parcel Boundaries
Features depicted were field verified by \\ /
2-ft contours David Bailey of the USACE on 7/15/2020. j \
0 75 150
FIGURE 4. JURISDICTIONAL AND ISOLATED WATERS DELINEATION MAP Feet
PROJECT WALTER SANITARY SEWER OUTFALL 1 inch = 150 feet
GARNER, WAKE COUNTY, NC VERSION: 2
DATE: 7/17/2020
JOB NO DKE-
MCADAMS DRAWN BY: oth 18190