Loading...
HomeMy WebLinkAbout20080915 Ver 2_More Info Received_20100420t)s - bgks U .1/ PDuke I'Energy® April 7, 2010 Mr. John Dorney - Supervisor North Carolina Department of Environment and Natural Resources Division of Water Quality - Wetlands Unit 1650 Mail Service Center Raleigh, North Carolina 27699-1650 MAJOR PROJECTS- CAROLINAS Duke Energy Corgoratlon 526 South Church St. Charlotte, NC 28202 Project Mailing Address: 5657 Rays Dairy Avenue Morganton, NC 28655 =J APR 2 0 2010 DE* - WATER QUALITY WETLANDS AND STQRmwATER BRANCH Re: Catawba-Wateree Hydroelectric Project, Linville Dam Embankment Seismic Stability Improvements at the Bridgewater Development Clean Water Act Section 4041401 Individual Permit USACE File No.: 20082753 Dear Mr. Dorney: Duke Energy Carolinas, LLC is submitting, for your review, this Individual Permit Package (eight copies), for the jurisdictional waters of the U.S., including wetlands that will be affected by the Linville Dam Embankment Seismic Stabilization Improvements (ESSI) Project. Attached to this letter are the Permit Application and the Project Narrative that describes the proposed ESSI Project. A check for $575.00 is also included for the 401 Water Quality Certification Fee. This package will satisfy Duke Energy and the Federal Energy Regulatory Commission (FERC) obligations under Sections 404 and 401 of the Clean Water Act (CWA), and addresses project-related concerns designed to determine what extent the proposed actions may affect any jurisdictional waters of the U.S. Should you have any questions or comments regarding this request or the federally listed species consultation, please feel free to contact me at (828) 391-6754 or James McRacken with HDRIDTA at (704) 342-7373. In addition, my direct mailing address is 5657 Rays Dairy Ave, Morganton, North Carolina 28655. Sincerely, Duke Energy Carolinas, LLC LAO? Jonathan R. Wise Project Director www.duke-energy.com Attachments cc: Brian Chrisman - HDRIDTA James McRacken - HDRIDTA APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT (33 CFR 325) The Public burden for this collection of information is estimated to average 10 hours per response, although the majority of applications should require 5 hours or less. This includes the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302; and to the Office of Management and Budget, Paperwork Reduction Project (0710-0003), Washington, DC 20503. Respondents should be aware that notwithstanding any other provision of law,no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please DO NOT RETURN your form to either of those addresses. Completed applications must be submitted to the District Engineer having jurisdiction over the location of the proposed activity. PRIVACY ACT STATEMENT Authorities: Rivers and Harbors Act, Section 10, 33 USC 403;Clean Water Act, Section 404, 33 USC 1344; Marine Protection, Research and Sanctuaries Act, 33 USC 1413. Principal Purpose: Information provided on this form will be used in evaluating the application for a permit. Routine Uses: This information may be shared with the Department of Justice and other federal, state, and local government agencies. Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application (see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. (ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS) 1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETED (ITEMS BELOW TO BE FILLED BY APPLICANT) 5. APPLICANT'S NAME 8. AUTHORIZED AGENT'S NAME AND TITLE (an agent is not required) Duke Energy Carolinas, LLC James A. McRacken Jr. / Senior Scientist Jonathan R. Wise / Project Manager 6. APPLICANT'S ADDRESS 9. AGENT'S ADDRESS 5657 Rays Dairy Ave, Morganton, NC 28655 HDR DTA, 400 S. Tryon Street Charlotte, NC 28201-1006 WC2401 Charlotte, NC 28285 7. APPLICANT'S PHONE NOS. W/AREA CODE 10. AGENT'S PHONE NOS. W/AREA CODE a. Residence a. Residence b. Business (828) 391-6754 b. Business 704.342.7373 11. STATEMENT OF AUTHORIZATION I hereby authorize, James A. McRacken Jr. to act in my behalf as my agent in the processing of this application and to furnish, upon request, supplemental information in support of this permit application. Z /D ej ICANT'S SIGNATURE DATE NAME, LOCATION, AND DESCRIPTION OR PROJECT OR ACTIVITY 12. PROJECT NAME OR TITLE (see instructions) Linville Dam Embankment Seismic Stability Improvements Project 13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT STREET ADDRE (if applicable) Linville River/Lake James APR 2 ly 2010 15. LOCATION OF PROJECT DENR-WATERIDUAUTY WETLANDS AND ST00VATIA OMNCN Burke North Carolina COUNTY STATE 16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions) Section, Township, Range, Lat/Lon, and/or Accessors's Parcel Number, for example. Linville River below the Bridgewater Powerhouse/Linville Dam 17. DIRECTIONS TO THE SITE 1-40 to exit 100, turn south and travel to SR 1168 and turn right. Go to Main Street and take left. Take a right on Bridge St. And travel to Linville St. / Powerhouse Rd. And take a left. Travel approximately 3.8 miles to the Bridgewater hydroelectric plant. Project area is around the existing and the powerhouses. (See attached location map in narrative) OMB APPROVAL NO. 0710-0003 Expires December 31, 2004 ENG FORM 4345NOD, Jul 97 EDITION OF FEB 94 IS OBSOLETE (Proponent: CECW-OR) 18. Nature of Activity (Description of project, include all features) The construction of an approximately 100' counterweight stability berm on the downstream side of Linville Dam. This will involve the placement of approximately 1 million cubic yards of fill on the downstream of the dam. In addition, offsite borrow areas are planned to be utilized, therefore, temporary and permanent roadways will need to be constructed to transport the borrow material to the construction site. (Please see attached narrative) 19. Project Purpose (Describe the reason or purpose of the project, see instructions) To provide dam safety improvements in the event of a catastrophic earthquake event. These improvements have been mandated by the Federal Energy Regulatory Commission (FERC). USE BLOCKS 20-22 IF DREDGED AND/OR FILL MATERIAL IS TO BE DISCHARGED 20. Reason(s) for Discharge The construction of the stability berm, the borrow haul roads, and the placement of sediment and erosion control structures will result in a discharge of fill material into jurisdictional waters of the U.S., including wetlands. Please see attached narrative. 21. Type(s) of Material Being Discharged and the Amount of Each Type in Cubic Yards Approximately 1 million cubic yards of soil for the stability berm and various amounts for haul road and sediment and erosion control impacts. Please see attached narrative. 22. Surface Area in Acres of Wetlands or Other Waters Filled (see instructions) Approximately 0.02 acres of jurisdictional wetland and approximately 748 feet of jurisdictional surface water (575 ft. permanent and 173 temporary) will be impacted. Please see attached narrative. 23. Is Any Portion of the Work Already Complete? Yes No X IF YES, DESCRIBE THE COMPLETED WORK 24. Addresses of Adjoining Property Owners, Lessees, Etc., Whose Property Adjoins the Waterbody (If more than can be entered here, please attach a supplemental list). See Attached Adjacent Property Owners List. 25. List of Other Certifications or Approvals/Denials Received from other Federal, State, or Local Agencies for Work Described in This Application. AGENCY TYPE APPROVAL IDENTIFICATION NUMBER DATE APPLIED DATE APPROVED DATE DENIED See Attached Would include but is not restricted to zoning, building, and flood plain permits 26. To the best of my knowledge the proposed activity described in my permit application complies with and will be conducted in a manner that is consistent with the Louisiana Coastal Management Program. Application is hereby made for a permit or permits to authorize the work described in this application. I certify that the information in this application is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant. -YA //o SIGNATURE OF APPLICANT DATE SIGNATURE OF A NT DA E The application must be signed by the person who desires to undertake the proposed activity (applicant) or it may be signed by a duly authorized agent if the statement in block 11 has been filled out and signed. 18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both. ENG FORM 4345NOD, Jul 97 EDITION OF FEB 94 IS OBSOLETE (Proponent: CECW-OR)