Loading...
HomeMy WebLinkAboutNC0047597_Pretreatment Audit_20201029ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality October 29, 2020 Ms. Vicki Westbrook Assistant Director of Water Management City of Durham 101 City Hall Plaza Durham, NC 27701 Subject: Pretreatment Audit City of Durham South Durham WRF - NPDES Permit No. NCO047597 North Durham WRF - NPDES Permit No. NCO023841 Durham County Dear Ms. Westbrook: On September 30, 2020, Cheng Zhang of the Raleigh Regional Office (RRO) conducted an audit of City of Durham's pretreatment program. The assistance given by Mr. Tyrone Battle, the industrial pretreatment coordinator, was greatly appreciated. The audit report is attached. Findings during the inspection were as follows: 1. The city has 13 Significant Industrial Users (SIUs), 4 of which are also Categorical Industrial Users (CIUs). It was noted that there were no SIUs in SNC for the most recent two semi- annual periods. 2. The pretreatment inspection file review included Cormetech (Permit No. 1036), Corning (Permit No. 1030) and AW NC (Permit No. 1011). The files needed for review were available for inspection, contained all the required elements and were in excellent condition. 3. The POTW and the three SIUs reviewed completed monitoring as required by the Industrial User Pretreatment Permits (IUPs) during the first semi-annual period of 2020. Cormetech and Corning were in compliance. AW NC had 6 zinc violations. The City issued two Notice of Violations for these violations as required by the Enforcement Response Plan (ERP). AW NC was entered into a consent order for zinc on February 20, 2 02 0. The order was set to expire on August 31, 2020, but was extended to February 28, 2020. AW NC had been in compliance with the order. norDE Q�� North Carolina Department of Environmental Quality I Division of Water Resources r rnani wa Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 oep,m ,t ie n��m.nni"i;� 919.791.4200 4. A review of the files containing the pretreatment program elements was conducted. These files are well organized. All elements are up to date. ERP was updated and approved recently. S. Long Term Monitoring Plan (LTMP) data were reviewed during the inspection. It was noted that all locations were sampled with required frequencies and all samples analyzed with required detection levels since the last inspection. 6. During the audit, Mr. Battle inspected one of the SIUs, Cormetech. The inspection was very thorough. It was evident that Mr. Battle has good relationship with the industry representatives and broad knowledge of the SIU's pretreatment operation. 7. It is recommended that the City takes pump station capacities into consideration when allocating flow to SIUs in the future. City of Durham's pretreatment Program is very well managed. Thank you for your continued support of the Pretreatment Program. If you have any questions or comments, please call Cheng Zhang at (919) 791-4200 (or email: cheng.zhang@ncdenr.gov). Sincerely, EDocuSigned by: UaAA1,SSA, f, t't.au WALL B2916E B 2144F... Vanessa . anuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources Enclosure: City of Durham Pretreatment Audit Form CC: Central Files w/attachment (Laserfiche) Cheng Zhang, RRO Tyrone Battle, City of Durham (Electronic copy only) NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT Waterkesources ENVIRONMENTAL QUALITY Background Information [Complete prior to audit; review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Durham City 2. Control Authority Representative(s): Tyrone Battle 3. Title(s): Pretreatment Coordinator 4. Address of POTW: Mailing 101 City Hall Plaza City Durham Phone Number 919-560-4386 Fax Number 919-560-4418 Zip Code 27701 E-Mail Gerald.Battleaa-,durhamnc.2ov 5. Audit Date 09/30/2020 6. Last Inspection Date: 09/16/2019 Inspection Type: ® PCI ❑ Audit 7. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s) ? ® Yes ❑ No If No, Explain. 8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ®Yes ❑ No If Yes, Explain. North Durham WRF experienced several BOD violations, possibly caused by sampling tubing contamination. 9. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No Order Type and Number: Are Milestone Dates Being Met? ❑ Yes ❑ No ® NA Parameters Covered Under Order ICIS Coding Main Program Permit Number INICI0I0I4 I7 Is 19 I7 I MM/DD/YY 109 130 120 10. ................................................................. Current Number of Significant Industrial. Users(SIUs)?............................................................................................... 11 11. .............................................................................. Number of SIUs with No IUP,..or with an Expired IUP?.............................................................................................................................. 0 12. .................................................................................................................................................................................................................................................................................................... Number of SIUs Not Inspected by POTW in Last Calendar Year? 0 13. .................................................................................................................................................................................................................................................................................................... Number of SIUs Not Sampled by POTW in Last Calendar Year? 0 14. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC for Limits Violations During Either of Last 2 Semi -Annual Periods? 0 15. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC for Reporting During Either of Last 2 Semi -Annual Periods? 0 16. .................................................................................................................................................................................................................................................................................................... Number of SIUs in SNC with Pretreatment Schedule? 0 17. .................................................................................................................................................................................................................................................................................................... Number of SIUs on Schedules? 1 18. Current Number of Categorical Industrial Users.(C1Us)..?............................................................................................ 4 19. Number of C11tJs in SNC? 0 NC DWR Pretreatment Audit Form Revised: December 2016 Page 1 21. PRETREATMENT PROGRAM ELEMENTS REVIEW- Review POTW files, verify POTW has copy of each Program Element in their File, complete with all supporting documents and PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) ND: 10/30/2017 SD: 10/30/2017 ® Yes ❑ No ND: 1/16/2018 SD: 1/16/2018 ® Yes ❑ No 11/1/2022 Industrial Waste Survey (IWS) 4/7/2017 ® Yes ❑ No 7/11/2017 ® Yes ❑ No 4/30/2022 Sewer Use Ordinance (SUO) 12/21/2012 ® Yes ❑ No 3/4/2013 ® Yes ❑ No Enforcement Response Plan (ERP) 2/14/2020 ® Yes ❑ No 3/17/2020 ® Yes ❑ No Long Term Monitoring Plan (LTMP) 3/29/2004 ® Yes ❑ No 5/18/2004 ® Yes ❑ No Legal Authority (Sewer Use Ordinance-SUO) 22. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction? ❑ Yes ® No If yes, Please list these towns and/or areas. Durham County receives flow from the City under an inter - jurisdictional agreement. 23. If yes to #22, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts? ❑ Yes ❑ No ® NA A copy, if not already submitted, should be sent to Division. 24. If yes to #22, Have you had any trouble working with these towns or districts? ❑ Yes ❑ No ❑ NA If yes, Explain. 25. Date of Last SUO Adoption by Local Council 12/26/2013 26. Have you had any problems interpreting or enforcing any part of the SUO? ❑ Yes ® No If yes, Explain. Enforcement (Enforcement Response Plan-ERP) 27. Did you send a copy of the ERP to your industries? ❑ Yes ® No If no, POTW must send copy within 30 days. Updated ERP was sent SIUs on September 15, 2020. 28. Have you had any problems interpreting or enforcing any part of the ERP (i.e. any adjudication, improper enforcement, etc? ❑ Yes ® No If yes, Explain. 29. List Industries under a Schedule or Order and Type of Schedule or Order AW NC is under a consent order for zinc. Resources 30. Please Rate the Following: S=Satisfactory M=Marginal U=Unsatisfactory 31 Rating Explanation, if Unsatisfactory Personnel Available for Maintaining 2 full time technicians dedicated to pretreatment, FOG, and POTW's Pretreatment Program ®S ❑M ❑U se to e. Access to POTW Vehicles for 3 vehicles. Sampling, Inspections, and ®S ❑M ❑U Emergencies Access to Operable Sampling 15 samplers. Equipment ®S ❑M ❑U Availability of Funds if Needed for Additional Sampling and/or Analysis ®S ❑M ❑U Reference Materials ®S ❑M ❑U Staff Training (i.e. Annual and Regional Workshops, Etc.) ®S ❑M ❑U Does the POTW have an adeauate data management system to run the pretreatment nroaram? Yes n No Explain Yes or No. AmeriTech Software. NC DWR Pretreatment Audit Form Revised: December 2016 Page 2 32. How does the POTW recover the cost of the Pretreatment Program from their industries? Explain. Sampling costs and surcharges. Public Perception/ Participation 33. Are there any local issues affecting the pretreatment program (e.g.. odor, plant closing, new or proposed plants)? ❑ Yes ® No If yes, Explain. 34. Has any one from the public ever requested to review pretreatment program files? ❑ Yes ® No If yes, Explain procedure. If no, How would the request be addressed? Required to be in writing on letterhead. Director, city attorney, and public affairs officer will be informed. 35. Has any industry ever requested that certain information remain confidential from the public? ❑ Yes ® No If yes, Explain procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential from public. If no. how would the request be addressed?. Would be marked confidential, sealed, and stored in a separate locked cabinet. 36. In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No 37. Is the public notified about changes in the SUO or Local Limits? ® Yes ❑ No 38. Were all industries in SNC published in the last notice? ® Yes ❑ No Permitting (Industrial Waste Survey-IWS) 39a... How does the POTW become aware of new or changed Users? Chamber of Commerce contacts the POTW before a user arrives. Weekly emails from City Permitting (on construction) 39b. Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision? (Who is an SILT?) Conversation, short form. Long form and inspection required if necessary. 40. Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate? ❑Yes ®No If Yes, How many are there? Please list each site and how it is permitted, if applicable. 41. Does the POTW accept waste by (mark if applicable) ® Truck ❑Dedicated Pipe ❑ NA Only Septage is accepted. 42. If the POTW accepts trucked waste, what controls are placed on this waste? (example. designated point, samples drawn, manifests required) Designated discharge point and the capacity to take samples. Haulers are required to purchase septage tickets from the City. Trucks are weighed, IDs checked, manifests submitted, area monitored by video camera. 43. How does the POTW allocate its loading to industries? Mark all that apply ❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other Explain Other: 44. Review POTW's copies of current allocation tables for each WWTP. Are there any over allocations? ❑ Yes ® No If yes, What parameters are over allocated? 45. If yes to #43, What is being done to address the over allocations? (short-term IUPs, HWA to be revised, pollutant study, etc.) N/A 46. Does the POTW keep pollutant loading in reserve for future growth / safety? ® Yes ❑ No If yes, what percentage of each parameter 30-40% 47. Has the POTW experienced any difficulty in allocation? (for example: adjudication by an industry) ❑ Yes ® No If yes, Explain. 48. How does the POTW decide on which pollutants to limit in the permits? Monitor for? (for example: were only those pollutants listed on the application limited; categorical parameters; NPDES Pollutants of Concern) Federal guidelines, capacity to impact the POTW. NC DWR Pretreatment Audit Form Revised: December 2016 Page 3 49. How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits ? Explain. Federal/State guidelines, capacity to impact the POTW. Permit Compliance 50. Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No If yes, which industries? What was (will be) the outcome of the adjudication? 51. Demonstrate how the POTW judges compliance. This should include compliance judgment on all violations of limits, reporting requirements, and permit conditions, as well as for SNC. AmeriTech Software and compliance judgement sheets. 52. Does the POTW use the Division's model inspection form or equivalent? ® Yes ❑ No If no, does the POTW form include all DWQ data? ❑ Yes ❑ No 53. Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ® Yes ❑ No If no, Explain. 54. What criteria are used to determine if a slug/spill control plan is needed? Federal/State criteria and the capacity to impact the POTW. Plan required if aggregate 1320 gallons of storage or 660 gallons for any one container. 55. What criteria does the POTW use to determine if a submitted slug/spill control plan is adequate? Basic information: Correct contact information, responsible officials, who they are, process type. 56. How does the POTW decide where the sample point for an SIU should be located? Preferably downstream of all process control and with no domestic. Segregated to the particular industry that uses it. POTW is involved before users arrive as it is simpler to change a location on a blueprint than digging up pipe. Staff safety is also taken into consideration. 57. Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time? (example: correct location; proper programming of sampler; clean equipment; swirling the sample bucket uniformly) POTW: ® Yes ❑ No SIU: ® Yes ❑ No If yes, Explain. POTW lab tech knows sample locations, samplers are run for the proper amount of time with the minimum of 100 ml/hour collected, sample bucket is swirled uniformly. 58. Who performs sample analysis for the POTW for Metals POTW, Enco(low level HO Conventional Parameters POTW Organics Enco, Lancaster (pharmaceutical), and Meritech (Toxticity) 59. Explain the Chain of Custody Procedure used for both in house and commercial lab samples. POTW lab tech fills out all information (date/time collected/preservatives used), samples are placed in cooler and Chain of Custody (in house or commercial labs) is left for the lab to pickup if applicable with the time relinquished. Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA) 60a. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 60b. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 60c. Is LTMP/STMP Data Maintained in Table or Equivalent? ® YES ❑ NO Is Table Adequate? ® YES ❑ NO 60d. All LTMP/STMP effluent data on Discharge Monitoring Report (DMR)? ® YES ❑ NO DWQ Inspector, verify yourself! 60e. If NO to any above, list violations 60f. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: 61. Do you complete your own headworks analysis (HWA) ? ® Yes ❑ No If no, Who completes your HWA? Phone (_) -- 62. Do you have plans to revise your HWA in the near future? ® Yes ❑ No If yes, What is the reason for the revision? (mark all that apply) ❑Increased average flow ❑NPDES limits change ❑More LTMP data available ❑Resolve over allocation ❑5 year expiration ®Other Explain. Plant construction. 63. In general, what is the most limiting criteria of your HWA? ❑Inhibition ® Pass Through ❑Sludge Quality NC DWR Pretreatment Audit Form Revised: December 2016 Page 4 64. Do you see any way to increase your loading in the future (Example: obtaining more land for sludge disposal)? ❑ Yes ® No Explain. Looking into more land for sludge disposal as current land available is being restricted. Plant upgrade will provide more MAHL. Summary 65. Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment? No NC DWR Pretreatment Audit Form Revised: December 2016 Page 5 INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS AND 1 IU INSPECTION) 66. User Name P. Cormetech 2. AW NC 3. Corning 67. IUP Number 1036 loll 1030 68. Does File Contain Current Permit? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 69. Permit Expiration Date 3/31/2021 12/31/2022 3/31/2023 70. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A N/A 433.17 N/A 71. Does File Contain Permit Application Completed Within One Year Prior ® Yes ❑ No ®Yes ❑ No ® Yes ❑ No to Permit Issue Date? 72. Does File Contain Inspection Completed Within Last Calendar Year? ® Yes ❑ NoI ® Yes ❑ No ® Yes ❑ No 73. a. Does File Contain Slug/Spill Control Plan? a. ®Yes []No a. ®Yes ❑No a. ®Yes []No b. If No, is One Needed? (See Inspection Form from POTW) b. ❑Yes ❑No b. ❑Yes ❑No b. ❑Yes ❑No 74. For 40 CFR 413 and 433 TTO Certification, Does File Contain a Toxic ❑Yes❑No®N/A F ®Yes❑No❑N/A ®Yes❑No❑N/A Organic Management Plan (TOMP)? 75. a. Does File Contain Original Permit Review Letter from Division? a. ®Yes []No a. ®Yes ❑No a. ®Yes []No b. All Issues Resolved? b.❑Yes❑No®N/A b.❑Yes®No❑N/A b.❑Yes❑No®N/A 76. During Most Recent Semi -Annual Period, Did POTW Complete its ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No Sampling as Required by IUP, including Flow? 77. Does File Contain POTW Sampling Chain -Of -Custody Forms? ® Yes ❑ No ® Yes ❑ No ® Yes ❑ No 78. During Most Recent Semi -Annual Period, Did SIU Complete its ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑No®N/A Sampling as Required by IUP, including Flow? 79. During Most Recent Semi -Annual Period, Did SIU submit all reports on ®Yes❑No❑N/A ®Yes❑No❑N/A ❑Yes❑NoON/A time? 80a. For categorical IUs with Combined Wastestream Formula (CWF), does ❑Yes❑No®N/APTs❑NoN 7esONoON/A file include process/dilution flows as Required by IUP? 80b. For categorical IUs with Production based limits, does file include ❑Yes❑NoON/A ❑Yes❑No®N/A ❑Yes❑No[D production rates and/or flows as Required by IUP? 81. During Most Recent Semi -Annual Period, Did POTW Identify All ❑Yes❑NoON/A ®Yes ❑ No ❑Yes❑No®N/A Limits Non -Compliance from Both POTW and SIU Sampling? 82. During Most Recent Semi -Annual Period, Did POTW Identify All ❑Yes❑No®N/A ❑Yes❑No®N/A ❑Yes❑No®N/A Reportin& Non -Compliance from SIU Sampling? 83. a. Was POTW Notified by SIU (Within 24 Hours) of All Self- a.❑Yes❑No®N/A a.❑Yes❑No®N/A a.❑Yes❑No®N/A Monitoring Violations? b. Did Industry Resample and submit results to POTW within 30 Days? b.❑Yes❑No®N/A b.❑Yes❑No®N/A b.❑Yes❑No®N/A c. If applicable, did POTW resample and obtain results within 30 days of becoming aware of SIU limit violations in the POTW's sampling of SIU? c.❑Yes❑No®N/A c.®Yes❑No❑N/A c.❑Yes❑No®N/A 84. During Most Recent Semi -Annual Period, Was SIU in SNC? ❑ Yes ® No ❑ Yes ®No ❑ Yes ®No 85. During Most Recent Semi -Annual Period, Was Enforcement Taken as ❑Yes❑No®N/A ®Yes❑No❑N/A ®Yes❑No❑N/A Specified in POTW's ERP (NOVs, Penalties, timing, etc.)? 86. Does File Contain Penalty Assessment Notices? 0Yes0No[9 ❑Yes❑No®N/A ❑Yes❑No®N/A 87. Does File Contain Proof Of Penalty Collection? ❑Yes❑No[D ❑Yes❑No®N/A ❑Yes❑NoON/A 88. a. Does File Contain Any Current Enforcement Orders? a.❑Yes❑No®N/A a.®Yes❑No❑N/A a.❑Yes❑No®N/A b. Is SIU in Compliance with Order? b.❑Yes❑No®N/A b.®Yes❑No®N/A b.❑Yes❑No®N/A 89. Did POTW Representative Have Difficulty in Obtaining Any Requested ❑ Yes ® No ❑ Yes ®No ❑ Yes ® No Information For You? FILE REVIEW COMMENTS: 81 - AW NC had four daily maximum and two monthly average violation for zinc in January and February 2020. 85 - The POTW issued two NOVs for AW NC's zinc violations. 88 - AW NC was entered a consent order on February 20, 2020. The order would expire on August 31, 2020, but was extended to the end of February 2021. AW NC has been in compliance with the order. NC DWR Pretreatment Audit Form Revised: December 2016 Page 6 INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY I N I C 1 0 1 0 1 4 1 7 1 5 1 9 1 7 I 1 09 1 30 1 20 1 1. Industry Inspected: Cormetech 2. Industry Address: 5000 International Drive, Durham NC 27712 3. Type of Industry/Product: Manufacturing/Environmental catalysts 4. Industry Contact: Lanette Plyler Title: Director of Environmental Health & Safety Phone: 919-620-3023 Fax: 919-620-3001 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ® Yes ❑ No 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ® Yes ❑ No B. Plant Tour ® Yes ❑ No C. Pretreatment Tour ® Yes ❑ No D. Sampling Review ® Yes ❑ No E. Exit Interview ® Yes ❑ No Industrial Inspection Comments: The inspection was thorough, and met the Division's requirements. Audit SUMMARY AND COMMENTS: Audit Comments: The prouram is well managed. Requirements: None Recommendations: Pump station capacities should be taken into consideration when allocating flow to SIUs in the future. NOD: ❑ Yes ® No NOV: ❑ Yes ® No QNCR: ❑ Yes ® No POTW Rating: Satisfactory® Marginal ❑ Unsatisfactory ❑ Audit COMPLETED BY: Cheng Zhang, RRO DATE: September 30, 2020 NC DWR Pretreatment Audit Form Revised: December 2016 Page 7