Loading...
HomeMy WebLinkAboutNCC190283_Emails RE Change in Legally Responsible Person_20201029Georgoulias, Bethany From: Georgoulias, Bethany Sent: Thursday, October 29, 2020 2:56 PM To: Clarke, Janet L Subject: RE: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 Hi, Janet, Yes, I see the part you highlighted in the email, but I thought that meant you provided someone else's email for the Modification email to go to, and not a change to the legally responsible individual on the initial permit. Unfortunately we did not make a note about that being part of the change at the time. I apologize for that confusion. Type Name * George Battle, III 1'itin * Vice Chancellor of Institutional Inlegrity & Risk Management Organization * The llniversq of N*0 Carolina 21 Chapel fill Date * 0312312020 Emdil Address* gbatlle@ad_une.edu Br"U for Cwcyeow Te le ph On e N u mbe r * (919)962-3795 0"Xt Nxytff d -e nNd to rexjh yw Review Date 03i232020 We have since revised our Modification form to include the option of changing legally responsible person, so it is more clear for us to keep track of (but still not ideal, obviously). I have marked this permit file as having had a change in that person. Please make sure a Modification is submitted with the signed form uploaded for any future changes in legally responsible person. For streamlining future processes for things like future modifications or NOTs, the responsible individual can delegate signature authority for NPDES permits to another individual who can sign on their behalf. This is similar to how a corporate VP might delegate NPDES permit responsibilities down to a plant manager, for example. Those signing should meet those requirements outlined in the NCG01 permit regarding signatory authority. I hope this helps, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncderingov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: httl2://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater D, E Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Clarke, Janet L [mailto:jlclarke@ehs.unc.edu] Sent: Thursday, October 29, 2020 2:27 PM To: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: FW: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Bethany, I'm forwarding correspondence regarding this project from last spring. I thought I had changed the legally responsible person in the modification request, but perhaps I didn't if there was an option to only select one item on the list. Also, due to the fact that our Vice Chancellors change frequently (lately it's been every year or two) and it is a complicated process to go through the signature approval process at UNC, is there a way to have this process streamlined? I'm not sure whether it's better to just keep re-routing the current correspondence or send a stack of documents to the new Vice Chancellor. Thanks! Respectfully, Janet Clarke, CPESC Stormwater Specialist Environment, Health and Safety UNC Chapel Hill (919) 843-0475 (0) (919) 883-7163 (C) Jlclarke@ehs.unc.edu From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Sent: Monday, March 23, 2020 2:06 PM To: Clarke, Janet L <ilclarke@ehs.unc.edu>; Riggins, Daryl <riggins@mcadamsco.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: RE: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 Thanks, Janet. I'll make sure the information gets added. Bethany Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: httl2://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater From: Clarke, Janet L [mailto:ilclarke@ehs.unc.edu] Sent: Monday, March 23, 2020 1:18 PM To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>; Riggins, Daryl <riggins@mcadamsco.com> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: RE: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Bethany, Thank you for the clarification. This is the first project for which UNC has submitted an online modification request. When the original ESC plan was submitted for this project, the final locations and designs of the off -site stormwater devices were not determined or designed. So, this is a change (addition) to the project area, and is meant to update the original NCG01 permit with the additional construction work. The original permit was reviewed and approved by Sally Castle with DEMLR LQS. UNC often needs to submit ESC plan modifications after being issued the initial permit. We've been asked by DEMLR to submit modifications each time there is a change to project area, project size, and/or significant changes to erosion and sedimentation control measures. Please let me know if that helps answer your questions, or if you need additional information. Thanks! Respectfully, Janet Clarke, CPESC Stormwater Specialist Environment, Health and Safety UNC Chapel Hill (919) 843-0475 (0) (919) 883-7163 (C) ilclarke@ehs.unc.edu From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Sent: Monday, March 23, 2020 12:32 PM To: Riggins, Daryl <riggins@mcadamsco.com>; Clarke, Janet L <jlclarke@ehs.unc.edu> Cc: Lucas, Annette <annette.lucas@ncdenr.gov> Subject: RE: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 Janey and Daryl, Thank you both for this information about the Modification request for this project. Daryl is correct; we discourage uploading entire sets of the E&SC plans, particularly because of storage space and because this detailed documentation is not necessary for the NPDES Stormwater Construction permit. Typically we are getting revised E&SC approval documentation from the local program or State reviewing office because disturbed acreage has changed, for example. Did the RRO need to issue another letter when the off -site stormwater control measure design was approved, or was that not necessary? These construction details might be more specific to post -construction stormwater control design rather than the construction stormwater permit. That's a separate kind of permit. We can certainly add the information to the NCG01 permit file for reference if it's helpful to understand pending construction activity changes. I just wanted to make sure I understood whether or not there had been another review and approval by the E&SC program authority. Also, thank you for the suggestion to add another contact to the Modification form. I maintain these forms, and that is something I can do in the near future, and to make sure that person is copied on emails. Thanks, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater From: Riggins, Daryl [mailto:riggins@mcadamsco.com] Sent: Monday, March 23, 2020 11:55 AM To: Clarke, Janet L <jlclarke@ehs.unc.edu>; Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Subject: [External] RE: Mod request for Construction Stormwater Permit - NCC190283 External email. Do not click links or open attachments unless you verify. Send all sus ' attachment to report.spam@nc.gov Janet, Complete plan set is attached. The online form explicitly directs to upload selected sheets only, so that's what I did. Let me know if there's anything more you need! Daryl Riggins, PE I Project Manager, Education + Healthcare McAdams 2905 Meridian Parkway, Durham, NC 27713 office 919. 361. 5000 1 direct 919. 287. 0872 1 mobile 919. 357. 0445 1 riggins@mcadamsco.com www.mcadamsco.com f mcadamsco.coml I linkedin flinkedin.coml I twitter ftwitter.coml I instagram f instagram.coml I join our team fmcadamsco.com T]McADAms creating experiences through experience From: Clarke, Janet L <jlclarke@ehs.unc.edu> Sent: Monday, March 23, 2020 11:28 AM To: bethany.georgoulias@ncdenr.gov Cc: Riggins, Daryl <riggins@mcadamsco.com> Subject: FW: Mod request for Construction Stormwater Permit - NCC190283 Bethany, I'm the UNC erosion control contact for the project, and I submitted the online form but used Mr. Battle's email since he is the Responsible Party. If I could add a suggestion for the online modification form, I think it would be helpful to include the erosion control and design engineer contacts on the form, since we are the technical experts for the permitting. I'll contact Annette Lucas and make the same suggestion. This project was initially submitted in 2019 without the complete design for the off -site stormwater control measure, and we are just submitting the plans for the additional work prior to beginning construction on this phase of the project. Daryl, I believe it would be helpful to also submit the ESC drawing with the Filterra devices. Question: on the online form, were you able to attach two documents, or just the one page? Please let me know if you need additional information to approve the modification. Thank you! Respectfully, Janet Clarke, CPESC Stormwater Specialist Environment, Health and Safety UNC Chapel Hill (919) 843-0475 (0) (919) 883-7163 (C) jlclarke@ehs.unc.edu From: Brennan, Catherine <crbrennan@ehs.unc.edu> Sent: Monday, March 23, 2020 10:48 AM To: Myers, Sharon A <samyers@ehs.unc.edu>; Clarke, Janet L <jlclarke@ehs.unc.edu> Subject: FW: Mod request for Construction Stormwater Permit - NCC190283 FYI — Can you guys take a look and follow-up? From: Battle, George Edward III <gbattle3@unc.edu> Sent: Monday, March 23, 2020 10:46 AM To: Brennan, Catherine <crbrennan@ehs.unc.edu> Subject: Fwd: Mod request for Construction Stormwater Permit - NCC190283 Hi Cathy. Are you the right person to respond to this question? Thank you. George Get Outlook for iOS From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Sent: Monday, March 23, 2020 10:42:01 AM To: Battle, George Edward III <gbattle3@unc.edu> Subject: Mod request for Construction Stormwater Permit - NCC190283 Mr. Battle, We received the modification request for the above project. The original E&SC approval provided was from the Raleigh Regional Office (attached). The only documentation uploaded with this mod request was a site plan (attached). Was there any kind of approval from the RRO regarding this change to the scope of the project? Thank you, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http_//deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater