Loading...
HomeMy WebLinkAbout20070578 Ver 1_CAMA Permit Application_20070403~~ ,~~~~ 2007fJ~78 ~~~_ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, DlrectOr William G. Ross Jr., Secretary April 2, 2007 .. MEMORANDUM: {- - ~;,` ~ ~ui1r TO: Cyndi Karoly, Supervisor 401 Oversight & Express Permits Unit ~"- ~ ` " Division of Water Quality-Surface Water Protection FROM: Doug Huggett, Major Permits Coordinator SUBJECT: CAMA Permit Application Review Applicant: Robert Hesch Project Location: 414 Loder Ave., adjacent to the AIWW & Myrtle Grove Sound, New Hanover Co. Proposed Project: expansion of existing docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 25, 2007. If you have any questions regarding the proposed project, contact Robb Mairs at (910) 796-7423, when appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 Phone: 910-796-72151 FAX: 910-395-39641 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Robert Hesch 2. LOCATION OF PROJECT SITE: 414 Loder Ave., adjacent to the Atlantic Intracoastal Waterway and Myrtle Grove Sound, in New Hanover County. Photo Index - 2006: 21-7383, P, Q-15 2000: 21-263, Q, R- 15 1995: 21-246, O, P-23 State Plane Coordinates - X: 2342068 Y: 137911 Rover file: 0-032713A Latitude: 34°07'24.83413"N Longitude: 77°52' 1 1.=17838~-~\ 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 3/27/07 Was Applicant Present -Yes 5. PROCESSING PROCEDURE: Application Received - 3/27/07 (complete) Office -Wilmington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Wilmington/New Hanover County Land Classification From LUP -Conservation /Resource Protection (B) AEC(s) Involved: PT, EW, OR (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing -Municipal sewer Planned - N/A (F) Type of Structures: Existing -Single family residence, bulkhead and private dock Planned -Expansion of existing private dock (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands -Shaded (B) Non-Vegetated Wetlands -Open water 510 sq. ft. (C) Other -High ground disturbance (D) Total Area Disturbed: 510 sq. ft. (E) Primary Nursery Area: Yes (F) Water Classification: ORW Open: Yes 8. PROJECT SUMMARY: The applicant proposes to expand an existing private docking facility with new boatlifts and gazebo. Robert Hesch Page Two 9. PROJECT DESCRIPTION: The project site encompasses approximately 0.05 acres and is located at 414 Loder Ave., adjacent to the AIWW/Myrtle Grove Sound, in Wilmington, New Hanover County. To locate the property, take College Road south from Wilmington towards Carolina Beach. Turn left onto Piner road at the intersection of S. College Road and NC Hwy 421, and follow until you reach a stop sign at Myrtle Grove Road. Turn right onto Myrtle Grove Road and travel south approximately 0.4 mi. until you reach Loder Ave., which would be located on the left. Continue traveling east until the road turns to the right onto a gravel road. The property of interest will then be on the left. The applicant currently maintains an elevated single-story residence on the property. The 51 linear feet of shoreline is stabilized by a bulkhead. The highground portion of the property is primarily wild grass. The area waterward of the existing bulkhead consists of mixed §404 Wetlands type vegetation and Coastal Wetlands, which includes: Marsh Elder (Iva frutescens), Grounsel-bush (Baccharus halimifolia), Sea Ox-eye (Borrichia frutescens), and Salt Meadow Grass (Spartina patens). Low marsh consists primarily of Smooth Cordgrass (Spartina altern~ora), which covers an area approximately 120 feet in width towards the AIWW. The applicant received CAMA Minor Permit No. OS-48 for the bulkhead and additional fill material to raise the elevation of the property to match that of both adjacent riparian property owners. The applicant also maintains a private pier and floating dock waterward of his residence, which was authorized under CAMA General Permit No. 41517-D. The access pier extends towards the AIWW for a distance of approximately 189', by 6' in width. The structure spans approximately 120' of marsh. The pier then terminates onto a floating dock measuring 40' in length by 6' in width, which runs perpendicular to the shoreline, and is accessed from a gangway ramp. The existing docking facility could potentially accommodate up to four vessels, however, the CAMA General Permit only authorizes up to two vessels. The application states that the water depths at the terminal end of the docking system range from approximately -3.0' to -4.0' @ Mean Low Water (MLW) (See Sheet 4 of 7). Based on site visit on March 27, 2007 at 10:00 a.m., water depths were approximately -1.0' to -2.0' @ Normal Low Water (NLW) at the location of the existing floating dock. The Wilmington-New Hanover County Land Use Plan classifies the area as Conservation. The waters of the AIWW in the vicinity of the project site are classified as Outstanding Resource Waters (ORW) by the NC Division of Water Quality. The area is designated as a Primary Nursery Area (PNA) by the NC Division of Marine Fisheries, and is OPEN to the taking of shellfish. Hesch Page Three PROPOSED PROJECT: The applicant proposes to expand an existing private docking facility with new boatlifts and gazebo. A gazebo, measuring 16.5' in length by 12' in width, would be constructed on the north side of the existing pier, approximately 16' short of where the pier terminates. The existing section of fixed dock adjacent to the gazebo would be covered as well. The applicant also requests to convert the existing 40' slips into four 20' slips. Two boatlifts would be installed on the terminal end of the pier. One boatlift, measuring 13' in length by 12' in width, would be installed on the waterward side of the proposed gazebo, and one single pole, rotating boatlift, measuring 13' in length by 12' in width, would be installed on the southern side of the waterward end of the access pier. The applicant states that stops would be installed on the boatlifts to prevent the boatlift cradles from resting on the substrate. The applicant also states the proposed boatlifts would allow for safer access to vessels due to the tidal amplitude and the frequent wake activity in this area of the AIWW/Myrtle Grove Sound. Furthermore. the applicant states that the request to allow the existing floating dock to accommodate four vessels would rec~uirc no structural change and would not restrict facility to allow transient vessels to utilize dock at any given time. The expansion of the existing docking facility would accommodate a total of six vessels (See Sheet 2 of 7 and Narrative). 10. ANTICIPATED IMPACTS: The proposed expansion of the existing docking facility with gazebo and boatlifts would incorporate approximately 510 sq. ft. of Estuarine Waters and Public Trust Areas. The existing footprint of the facility would not extend waterward of the existing structure, which extends approximately 10~' into a waterbody that measures approximately 615' across. This distance would conform to the 1/4 width rule and would not extend beyond the established pier head length. As proposed, the applicant's proposal would not encroach into the 80-foot setback from the AIWW. The docking facility as proposed could potentially provide docking space for up to six (6) vessels. ~- Submitted by: Robb Mairs Date: 3/30/07 Office: Wilmington Property Owner: Robert Hesch Project Address: 414 Loder Ave, Wilmington, NC 28409 NARRATIVE The purpose of this CAMA major application is to install two boat lifts, add gazebo to existing pier and floating dock, and convert the existing two 40' slips on each side of the floater to four 20' slips. Boat lifts applied for will have stops installed to prevent coming into contact with earth ~~~9,Q and allow preservation of habitat beneath. The floater slips will allow a tie down waiting ~,~ _ area to utilize lift use during high tides, as well as maintain a safe boarding area while ,> wake activity of frequent boat traffic subsides. Furthermore; splitting each 40' slip to two 20' slips requires no structural changes and will maintain full compliance when two transient vessels like jetskis are docked on one side of floater. After converting the existing 40' slips #land #2 to the proposed 20' slips #1 through #4, the addition of the boat lifts will create boat slips #5 and #6. The additional lifts and gazebo are intended for personal craft and private residential use. ~„. RECEfVEf~ DCM WILNiWGTCN. NC MAR 0 i 200? DCM MP-1 APPLICAflON for Ma1or Development Perm (last revised '12127/06) 07 05 8 '~ 7 mil North Carolina DIVISION OF COASTAL MANAGEMENT 7. Primary Applicant/ Landowner Information Business Name N/A Project Name (if applicable) N/A Applicant 1: First Name Robert MI M Last Name Hesch Applicant 2: First Name MI Last Name If additional applicants, please attach an additional page(s) with names listed. Mailing Address 414 Loder Ave PO Box City Wilmington State NC ZIP 28409 Country USA Phone No. 910 - 793 - 0734 ext. FAX No. 910 - 793 - 6248 Street Address (if different from above) City State ZIP Email roberthesch@email.com 2. Ageni/Contractor Information Business Name Above Par Marine Construction AgenU Contractor 1: First Name MI Last Name Jeff E Terry AgenU Contractor 2: First Name MI Last Name Mailing Address PO Box City State 7105 Lipscomb Dr. Wilmington NC ZIP ~"' Phone No. 1 Phone No. 2 28412 910 - 231 - 781 4 ext. - - ext. FAX No. Contractor # 910 458 7759 N/A Street Address (if different from above) City State ZIP Email terryhome@bel lsouth. net <Form continues on back> DCN1 WILMINGTON, NC ti~ aR o 7 2007 Zs2-~t78-2at?~3 .. ~-~~B-~FcCf,IAS"r .. ww~5ar.ncc~~st~imara~,~~sent.ne2 Form DCM MP-1 (Page 2 of 4) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # New Hanover 414 Loder Ave. N/A Subdivision Name City State Zip Formerly Myramar Campgrounds Wilmington NC 28409 - Phone No. -Lot No.(s) (if many, attach additional page with list) 910 - 793 - 0734 ext. #2 Myramar, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Intracoastal Waterway c. Is the water body identified in (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ^Natural ®Manmade ^Unknown Intracosatal Waterway e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ^Yes ®No work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft.) 51 ft 22,500 c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or 50 ft x450 ft, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 3 ft ®NHW or ^NWL e. Vegetation on tract Grass on highground, marsh and open water in riparian f. Man-made features and uses now on tract Existing retaining wall, pier, and floating dock g. Identify and describe the existing land uses adjacent to the proposed project site. Private residential h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Residential L,,, (Attach zoning compliance certificate, if applicable) ®Yes ^No ^NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ^Yes ®No k. Has a professional archaeological assessment been done for the tract? If yes, attach a copy. ^Yes ®No ^NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a ^Yes ®No ^NA National Register listed or eligible property? <Form continues on next page> DCM WILMINGTON, NC MAR 0 7 2007 .2~-$fllt-2$fiP .. 9-$~$-~i~C~.%;,ST .. v~r~na.ncc~stw'abs~r~ae~raesr#.n~4 Form DCM MP-1 (Page 3 of 4) APPLICATION for Major Development Permi# m. (i) Are there wetlands on the site? ^Yes ®No (ii) Are there coastal wetlands on the site? ®Yes ^No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? ^Yes ®No (Attach documentation, if available) n. Describe existing wastewater treatment facilities. Currently septic, permit in-hand to attach to county sewer o. Describe existing drinking water supply source. Private well p. Describe existing storm water management or treatment systems. All surface run-off directed towards road away from waterway 5. Activities and impacts a. Will the project be for commercial, public, or private use? ^Commercial ^PubliGGovernment ®Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. Provide lifts for personal boats/jetski out of the frequent wake activity from boats on Intercoastal Waterway. The lifts are to be located to keep existing slips on each side of floating dock as tie down waiting area to utilize high tides for lift use, and also allow safe boarding while wake activity subsides. The two existing 40' slips are proposed to be spilt into four 20' slips in order to maintain compliance when docking two transient private watercraft on one side of floater at any time (no structure changes or additional disturbance is needed to split the 40' slips). c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Pylons will be hammer driven with minimal water-jet assist, conventional construction for decking and structure, all equipment on steel barge to be stored on site through duration of project d. List all development activities you propose. Propose to install two boat lifts and add gazebo to existing pier and floating dock. The addition of the boat lifts will create boat slips #5 and #6, after existing 40' slips #1 and #2 are converted to the four 20' slips #1-#4 described in Section b above. One lift will be a typical 4 piton boat lift, while the other will be a small single piton lift for small craft like jon-boat or jet ski. Boat lifts applied for will have stops installed to prevent contact with earth and allow preservation of habitat beneath. Splitting the two existing 40' slips to four 20' slips does not require structure changes. e. Are the proposed activities maintenance of an existing project, new work, or both? New work f. What is the approximate total disturbed land area resulting from the proposed project? 0 ®Sq.Ft or ^Acres g. Will the proposed project encroach on any public easement, public accessway or other area ^Yes ®No ^NA that the public has established use of? °~• h. Describe location and type of existing and proposed discharges to waters of the state. N/A i. Will wastewater or stormwater 6e discharged into a wetland? ^Yes ®No ^NA If yes, will this discharged water be of the same salinity as the receiving water? ^Yes ^No ^NA j. Is there any mitigation proposed? ^Yes ®No ^NA If yes, attach a mitigation proposal. R E C E I~ E d DCM WILMINGTON. NC <Form continues on back> MAR 0 7 2007 252-808-2803 .. 1-888-dRCOAST .. www.nccoastalmanagement.net Form DCM MP-1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additionallnformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) - (t) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name Ron Strickland Phone No. 910-512-1752 Address 418 Loder Ave Name Brad Southerland Phone No. 910-262-8733 Address 410 Loder Ave Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. CAMA General #41517-D CAMA Minor #05-048 h. Signed consultant or agent authorization form, if applicable. i. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further cerkify that the information provided in this application is truthful to th//e//best of my knowledge. Date ~ ' ~ G 7 Print Name ~~ ~~i H~_t ~c6/ ~ ,~~ Signature ,-'~~ / Please indicate application attachments pertaining to your proposed project. ^DCM MP-2 Excavation and Fill Information ^DCM MP-5 Bridges and Culverts ^DCM MP-3 Upland Development ®DCM MP-4 Structures Information RECEIVED ACM WILMINGTON, NC MA.R 0 7 2007 r~~-8-20 .. "-~sII~-~~~.5"t° .. =rv~rrtiv,nc~~~sstai~naazagernea~~.nei Form DCM MP-4 STRUCTURES (Construction within Public Trust Areasj Attach this form to Joint Application for CAMA Major Permit, Form DCM MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 7. DUCKING FACILITY/MARINA CHARACTERISTICS a. (i) Is the docking facility/marina: ^Commercial ^Pubtic/Govemment ®Private/Community ^This section not applicable b. (i) Will the facility be open. to the general public? ^Yes ®No c. (i) Dock(s) and/or pier(s) (ii) Number Existing: 1 (iii) Length Existing: 212ft (iv) Width Existing 6 ft (v) Floating ®Yes ^No e. (i) Are Platforms included? ®Yes ^No If yes: (ii) Number Proposed: One Gazebo (iii) Length 16.5 ft (iv) Width 12 ft (v) Floating ^Yes ®No Note: Roofed areas are calculated from dripline dimensions. d. (i) Are Finger Piers included? ^Yes ®No If yes: (ii) Number (iii) Length (iv) Width (v) Floating ^Yes ^No f. (i) Are Boatlifts included? ®Yes ^No If yes: (ii) Number 2 Lifts (One 12x13 and One Single-piton) (iii) Length 13 (iv) Width 12 g. (i) Number of slips proposed h 6 Total. Convert existing two 40' slips to four 20' slips and add two boat lifts (ii) Number of slips existing 2 40' Slips i. Check the proposed type of siting: ^ Land cut and access channel ~+° ^Open water; dredging for basin and/or channel ®Open water; no dredging required ^Other; please describe: k• Typical boat length: 30 ft RECEIVED DCM WILMINGTON, NC MAR 0 7 2007 Check all the types of services to be provided. ^ Full service, including travel lift and/or rail, repair or maintenance service ^ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips: 2 40' wetslips existing, convert to 4 20' slips ® Dry storage; number of boats: ^ Boat ramp(s); number of boat ramps: ® Other, please describe: Add 2 drv-slips: one 4-pylon lift and one single-piton lift j. Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). Private runabout /cruiser boats and personal watercraft I. (i) Will the facility be open to the general public? 252-308-2803 :: 1-332-aRCaAST :: www.nccoastalmanagement.net revised: 12i27~`OS u t"~e.. _ . _.M#~rro_ ~, _ ~ cs~ ~ m. (i) Will the facility have tie pilings? ^Yes ®No ^Yes ®No (ii) If yes number of tie pilings? 2. DOCKING FACILITY/MARINA OPERATIONS ®This section not applicable a. Check each of the following sanitary facilities that will be included in the proposed project. ^ Office Toilets ^ Toilets for patrons; Number: ;Location: ^ Showers ^ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. c. Describe the disposal of solid waste, fish offal and trash. d. How will overboard discharge of sewage from boats be controlled? e. (i) Give the location and number of "No Sewage Discharge" signs proposed. (ii) Give the location and number of "Pumpout Available" signs proposed. f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. g. Where will residue from vessel maintenance be disposed of? h• Give the number of channel markers and "No Wake' signs proposed. i. Give the location of fuel-handling facilities, and describe the safety measures planned to protect area water quality. :,,,. j. What will be the marina policy on overnight and live-aboard dockage? k. Describe design measures that promote boat basin flushing? RECEIVED DCM WILMINGTON, NC r,anR (1 ~ ~f107 ~~~-~~I~-~i~S .: t.S€~S-~~L9siS2- :: ~rrw.rtc~o~s~am~na Cm~nfatet. ,, rev'€seci: '!~~'27,•t} 9..:. t`~ss::~~~r~~, ~tas~e ~ c I. If this project is an expansion of an existing marina, what types of services are currently provided? m. Is the marina/docking facility proposed within a primary or secondary nursery area? ^Yes ^No n. Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ^Yes ^No o. is the mannaiaocking tacility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ^CW ^SAV ^SB ^WL ^None p. Is the proposed marina docking facility located within or within close proximity to any shellfish leases? ^Yes ^No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s): ^Commercial ^PublicJGovernment ^Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GRO/N (e.g., wood, sheetpile, etc. If a rock groin, use MP-2, Excavation and Fill.) ®This section not applicable a• (i) Number (ii) Length (iii) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c. Maximum distance beyond NHW, NWL or wetlands ~,- 6. MOORING PILINGS and BUOYS ®This section not applicable a. is the structure(s): b. Number ^Commercial ^PubliGGovernment ^Private/Community c~ Distance to be placed beyond shoreline d. Description of buoy (color, inscription, size, anchor, etc.) Note: This should be measured from marsh edge, if present. . GCNI VVILMiNGTON, NC MAR 0 7 2007 ~"" -`~S .. `f-~-=f~t3AS'f' .: ~w.nc~r~asta)ar~a.~~ment.nct_ revised: 1~fZri{3S ~+Drm 3`30iY7 i~~l~''-~ {Structures, Page 4 of 4j e. Arc of the swing 7. GENERAL a. Proximity of structure(s) to adjacent riparian property lines b. Proximity of structure(s) to adjacent docking facilities. 15 feet 30 feet when complete Note: For buoy or mooring piling, use arc of swing including length of vessel. c. Width of water body 615 feet d. Water depth at waterward end of structure at NLW or NWL 3.6 ft e. (i) Will navigational aids be required as a result of the project? ^Yes ®No ^NA (ii) If yes, explain what type and how they will be implemented. 8. OTHER ^This section not applicable a. Give complete description: /~~ Date 414 Loder Ave Project Name Robert Hesch Ap~ nt N ~ a• Applicant Signature RECEIVED GCM WILMINGTON, NC MAR Q 7 2007 252-808-2808 :: 1-888-4RCOA5T :: ~rvww.nccoastaimanagement.net revised: 12;27;06 .. ~ c ~ ~ m O 4 f -- ~ ~ a to ~ ~ ~ ~ ~~ a ~~ ~ c ~ ~ N ~ ~ z ~ ~ a v, .~ a .. a o ~i I~ t0 ~ ~~ ~ `~ ' p U Z° ~~ ¢ a-- ~ j~; ~Q~ ~ ° ~ ~o9~os~ ~_ o Z~ ~~ ~~ a W p`~ :a^oa~ ail~~W :: ~ ~ c , a~~8 ~ ~ . ~ a ~ 8a ~ QeQ~e~ ~ T ~ -- , ~ d a ~ ~ ro ~~ P~! a8a~lo~ S '' ` __ ~ ~ - , v ", _p~tj d ~o ~ ~~ c Y ~l/~ J ~ la / `.C L ~ ~ ~` ,~ ' i~,m ~ ~ yq .. ~ - - "' ~ ~~r ..... 1 . ^^,, A ~.lA n T~ ~? ~ 7 ~ xa~{ ~ „' ,. `° ` ~ ~ - ~ ~~ ~ ~_ . ~ .., ,., ~ _~ - `... C _ as ,. p '. Q t~ U_ ~L N Q L O Z vi N c~ t6 C O L r~ i Z o° ~~ ' '~~' !~ ~\ 0 .~ 0 RECEfVED DCM WILMINGTON, NC MAR 0 7 2007 H~ m; m _N E m o m U L H EQ ~w Q Z Q C L ~ 0 V ~ m ~ m m h ~ L ~ my _~ ¢~ ~- ma a~ ac o o` ~ a ~ mF a~ bm U O ._. U ~ L O ~ U ~ ~o Qm o~ N ~ ~ ry OE r~ rn i. ` o av U0 PROPERTY LINE o~~ Brad Souther anc 410 coder Robert Hesch 414 Loder F~~~.i~f C~CM V"JI'L~~i~NG?~~~, ~~ Ron Strick and 418 Loder PROPERTY LINE LEGEND ® PROPOSED STRUCTURAL ADDITIONS ~~~ ~,r ~~~L~ ~ oz•o5t~ PRQIECT INFORIMTION: Namx ROBERT HESCH Address: 414 IADER AYE WIL41NCiDN, NC 2&09 Deeertptlon: PROPOSED DOCK MODIFlGTION PWJ PROPOSED CONVERSION OF (2) EXISTING 40' SLIPS TO (4) 20' SLIPS 0 STRUCTURE CHANGES REQUIRED PROPOSED GAZEBO 12 x 16.5 = 198 square footage allotment of countable surface is less than the 204 sq. ft. that are allowed the property's 51' shoreline. Robert Hesch so' 414 Loder PROPERTY LINE w ~ 15' RIPERIAN SETBACK Z i a a • a e i a o 'z 15' RIPERIAN SETBACK PROPERTY LINE o~~~ PROPOSED SLIP #5 LIFT : 12' x 13' "~- ~ N J ~ N N ~T1NG SUP t EXISTING FLOATER PROPOSED SLIP #3 PROPOSED SLIP #4 PROPOSED SLIP #6 ROTATING LIFT SETS ON TOP OF PIER 1500 LB CAPACITY ~~~~~ ~~~!~ w~~~~~~~r~~~~~~_ "iA~t ~ i ~~ ~~% ~a ~~~ °< LEGEND PROPOSED STRUCTURAL ADDITIONS PROJECT INFORMATION: Nams ROBERT HESCH Addrm: 414 LODER AVE. WILMINGTON, NC 28/08 Oeecrtptlon: PROPOSED OOCN MOOIFlCATION PIAN 13EXISTING PIER ~o~~~ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O ~ N ~ ~t ~ O ~ 00 0~ ° N O ~ N r~ d- ~ co I~ 00 ~ ~- PROPERTY LINE Robert Hesch 50' 414 Loder PROPERTY LINE W, ~•. ,,. . . •. •. Z• . 2 1 i •~• •e e i e o ,o ,a - 2' ( - 3' ~ - 4' NORMAL HIGH WATER DEPTH suP ~ a FLOA R suP 2 a ROTAl11~G UFT 5' IJ -6' IJ -7' 07 •0576 LEGEND MARSH Mph ~ 7 ~~~ PRQIECT INFORMA710N: Nome: ROBERT HESCH Addroa: 414 LODFR AVE WILMINGTON, NC 28409 Deaerlptlon: PROPOSED DOCK MODIFICATION PIMI 11ME/DATE OF WATER DEPRi MEASUREMENT ~~ L~c ~~E~o 7 PROPOSED STRUCTURAL ADDITIONS o~~~ LINE Robert H esch 414 Loder 50' PROPERTY LINE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O .- N r~ ~ t.f) c0 ~ 00 ~ ~ N O ~ N r~ ~ ~ c~ f~ 00 Q~ ~ ~ n- ~ ~ ~ ~ ~ r- ~- I ' `,' ,`,` ,' ,', ', GAZ BO U SLIP 1 ~~t :. .. .. suP z a ~.,. ,•.•,. ,.,.,. .~•~. ROTATI G LIFT ~'.+5.~..'..•±4'......+3''. .•.+2.•. +~ -1 -2' -3 -4 0 NORMAL LOW WATER DEPTH LEGEND MARSH .PROPOSED STRUCTURAL ADDITIONS PRQIECT INFORMATpN: Name: ROBERT HESCN Addrep: 414 LODER AVE WILMINGTON, NC 28409 Deecrlption: PROPOSED DOCK MOgFKiUION PLAN ~~C:~~~~fE4~_ ~1C~Er i~U~li.i~~l~u'~~iB'~~,~ ~v"a RME/OATE OF WATER DEF1fi MEASUREMEM y~j~~ ~/~/~ ~ 0 0 0 0 0 0 0 0° 0 0 0 0 0 0 0 0 0 0 0 ° °. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0~ N~ ~- ~ co ~ oo ~ o ~- 0 WATERLINE SHO NORMAL HIGH WATER DEPTH (BEGINS @ PYLON #6) LEGEND ~~ EXISTING PIER -~M- WATERLINE SOIL C-~[~V~~Y~~ 1e1,,aV~ 6"~lL~~l~JG~„ ~~~ SAAR Q ~ 2 070578 PRQIECT INFORNATKIN: Nome: ROBERT HESCH Addrett: 414 IODER A4E. WILA11NGfON, NC 28409 Deeodp8on: PROPOSED DOCK MODIFICARON PLAN T9AE/DATE OF WAlfli DEPfH MFASUREMEM 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ N -~ ~ ~ ~ ~` 00 ~' ° O ~ N ~ d - ~ c 0 ~ 00 ~ r - ~ - ~ ~- r - ~- ~ ~ - ~- N ~1 WATERLINE SHO NORMAL LOW WATER (BEGINS @ PYLON #17) LEGEND ~ EXISTING PIER -w..w•n- WATERLINE I~~ SOIL ~C~~pp`i~lppflppLi~~~~~~ ~~. lY~t'~fl ~ ~ Jw#t~7 PROTECT INFORµ1TI0N: Name: ROBERT HESCH Addrea: 414 I.DDER AYE WILYINGfON, NC 28408 DeecAptbn: PROPOSED DOCK MODIFlCATION PIAN TIME/DATE OF WATER DEPTH A~ASUREMENi ~-`~'~ >i/~l ~7 APPD RENSION DATE ECN ISS JH INRIAL RELEASE 7 A R~\ \O\ W Z Q LL! I N L.L _ ~ -I ~ I-III-I ~ I-III-I ~ I 80' = III=1 I 1=1 I I-III-III-III-III-I Q -I 11=1 I I-I 11=1 I I-1 I I-III-1 I I-I I i 1 - -I 11=1 11-1 I I-III-III-III - - _ ~ -III-III-I -III-III-III-III-III-I = _ _ _ _ ~ I 1 1 I I-III-III-I 1I- Heeds w III-III-III-III-III-III-III-III-III-III III 414 Loa . . - I ~ I III-I ~ I-I ~ I III I ~ I-I I-I I _ - HW W - -~ Q - - - ~ ~ -III-I ~ I-I ~ I 615' MARSH TO MARSH I I-III-III-III III 1 I I i I I II N NL ~ - - = - I=III-III-III-I =1 I I-III-III-III-III- 105' MARSH TO -~ I 11=1 11=1 I I-III-III-I 11- I ~ 1=1 ~ 1=1 ~ I-I ~ I-I ~ I-I ~ I-III-I ~ I-I ~ I-I ~ I-III-I I I-III-III-II PIER HEADLINE ~ _ I-III-III-III-III-III-I i t-I ~ I-I ~ I cn -I ~ 1=1 ~ I-I ~ I ; ~ I 1-1 11-1 11=1 11=1 ~ I-1 11-~ 11=1 I I-1 I 105/615= 17% < 25~ ALLOWED o , III=III-III-HIGH GROUND ISLAND=III-III -I I i-1 11=1 I I i i 1 1 1 = = ~ - i = ~ = ~ I-1 11 1 11 1 I I-III-1 I I_ III-III-III _ -III-III-III-III-III-III-III-III-I 1I- w -1 I I=1 11=1I 1=1 11=1 I I-1 I I-1I I-1 11 1 11 1 I I 1 I I 1I = = - - I I I I I-III 1 I I-III-I 11 1 I I z - _ = = -1 I I-III-1 I I-III-I 1I- III=1 I I-III-III-III-III-III-III-III-III-III-I 1I- 1=1 I I-I 11=1 I I-I 11=1 11=1 I I-III-1 11=1 I I-i 11=1 I I-I 1I- -I I I-I 11=1 I I-III-III-I 1 I-I 11=1 I I-I 11=1 I I-I III-III-III-III-III-III-III-III-III-III-III-I - =1 I I-i I I=1 I I-I I I-I 11=1 I -1 11- i I I-III - -III-1 11=1 I I-1 I I- -III-III-III -III-III-I 11=III X7.0578 ~~CE!'~ ~Civ~ UUILMIt~C~T~?~, ~~ PROJECT INFORMA110N: ixl~il ~ ~ L~~P Noms: ROBERT HESCH 1~~ Addreex 414 LOOER AVE. N1LNINGfON, NC 28409 Daecr(Ption: PROPOSED DOCK MODIFICATION PLAN ONLE55 OINERWISE SPECIFlED SIGNATURES DATE OESCRIPnaN PIER HEADLINE, CHANNEL, AND WATER BODY DINEK510N5 ARE IN FT CRAWN TOLERNICES ON JH OSNN07 ormNOi ~,.,~ k 2 PL. oECMa ~- ~~ ~ ~ SCALE: 1 "=100' B ' ~` 15 6_01 q ~~~ ~ NOT SCAU: s arr SND:T 7 OF 7 FlNISH LEGEND - - - -PROPERTY LINE x-1.3 SPOT ELEVATION • PILE LOT 1 MYRAMAR CAMP SITES M63PG 10 \ ~~ 1 ~ ~ EXISTING PIER 1 ~ ~ ~~ 1 ~~ LOT 2 \ Z MYRAMAR CAMP SITES ~ MB3PG10 1 . ~ . LOT 3 I MYRAMAR CAMP SITES MB 3 PG 10 I --~- (~ ~O ~Q` ~O ~~ ~O ~~ \~~ L ~ SURVEY REFERENCE: c^ fi MB 3 PG 10 ~~,` iS ~~Q- 0~~ ~~v P~ /GO +~ ~, /I / IN i~ i3 3 I~ I~ ~ +~ 6 30 0 / 30 60 90 Scate~ 1' = 30' =',FLOATING DOCK ,'. +~ ~~ PRO S >;;; ;/~~ n >• R POSED ROTATING LIFT ~ ON TOP OF PIER ~ PROPOSED LIFT F k0 G / FLOATING DOCK ETS `~~ F6 ELEVATION SURVEY ;;:{.~ . \t~, ~'``{~~~t~ ' ~ ~~ FOR `~` ROBERT M HESCH k~ ~~ ` d . w,,~' ~~~'; ~ ~ ~• AND ~4 ~ k ~ , TONYA M. PRICE ~ ` ~ ~ _ "i LOT 2 MYRAMAR CAMP SITES ' MAP BOOK 3 PAGE 10 _ ft' ~~ ~~, ' TOWNSHIP, NEW HANOVER COUNTY s t~~ ~ ~ A fi ~~ ' NORTH CAROLINA ~ > ~~ '~ - ~~ ~'~U SCALE: 1 =30 FEBRUARY 27, 2007 ~ +\ , ~ .~ ;Givi "vt~iL~9lPJ~T~~"=. ~'•1~ SHER N D. CRIBB NC PROFESSIONAL LAND SURVEYOR L-1099 MAR 6M 7 'l~i(JI 1144 SHIPYARD BOULEVARD WILMINGTON, NC 28412 910-791-0080 \ I .~ ~ BENCHMARK ~ PK NAIL IN PIER EL 8.34 NAVO 88 1 ~6 ~. ~ EXISTING PIER THE PREMISES SURVEYED IS WITHIN A FLOOD HAZARD AREA ACCORDING TO THE FLOOD INSURANCE RATE MAP FOR NEW HANOVER COUNTY, NC. (COMMUNITY PANEL N ~m ` 370168 3143 J EFFECTIVE APRIL 3, 2006). ~~ ~' 1 o PROPOSED GAZEBO ~~ 'S r° i~ r~ z l~ /~ - + ~~~ ~0 .~