HomeMy WebLinkAboutSW4200902_Supplement EZ_20201022 SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Miller's Reserve 2 Project Area ac 51.33 3 Coastal Wetland Area ac N/A 4 Surface Water Area ac N/A 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H`1003(4) 7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in.1 003(4)(c-d)out of the setback? NO 10 Is streambank stabilization proposed on this project? NO NUMBER AND TYPE OF SCMs:'< 11 infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(IS-FS 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfiiter 0 26 Filterra 0 FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Clark Fleming 28 Organization: Evans Engineering,Inc. 29 Street address: 4609 Dundas Drive 30 City,State,Zip: Greensboro,NC,27407 31 Phone numbers: 336-854-8877 32 Email: caf@evans-eng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer u® /A e e AL m Signature of Designer as a 035014 OW Seal Date WEB' POND ::1]Drainage area number 2 jDesign volume of SCM(cu ft) L65181 of 3%the SCM at the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? No 5 What are the side slopes of the SCM(H:V)? 3:1 Does the SCM have retaining walls,gabion walls or other engineered 6 side slopes? No Are the inlets,outlets,and receiving stream protected from erosion 7 (10-year storm)? Yes Is there an overflow or bypass for inflow volume in excess of the 81 design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Drawdown Orifice 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 General MDC(10)? 14 is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes rMet J.".4 SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Elevation of the excavated main pool depth(bottom of sediment 20 removal)(fmsl) 723.00 21 Elevation of the main pool bottom-(top of sediment removal)(fmsl) 724.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 730.00 23 Elevation of the permanent pool(fmsl) 730.50 24 Elevation of the top of the vegetated shelf(fmsl) 731,00 25 Elevation of the temporary pool(fmsl) 732.50 26 Surface area of the main permanent pool(square feet) 21872:1 27 Volume of the main permanent pool(cubic feet) 65181 of 28 Average depth of the main pool(feet) 4.97 ft 29JAverage depth equation used Equation 3 30 If using equation 3,main pool perimeter(feet) 557.0 ft 31 If using equation 3,width of submerged veg.shelf(feet) 3.0 ft 32 Volume of the forebay(cubic feet) 16070 of 33 Is this 15-20%of the volume in the main pool? Yes 34 Clean-out depth for forebay(inches) 63 in 35 Design volume of SCM(cu ft) 65181 of 36 Is the outlet an orifice or a weir? Orifice 37 If orifice,orifice diameter(inches) 316 38 If weir,weir height(inches) 39 If weir,weir length(inches) 40 Drawdown time for the temporary pool(days) 3.28 Are the inlet(s)and outlet located in a manner that avoids ih-ort- 41 Icircuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance(inches) 84 in 44 Depth of forebay at exit(inches) 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 ft 47 Slope of vegetated shelf(H:V) 6:1 Does the orifice drawdown from below the top surface of the 481 permanent pool? Yes Does the pond minimize impacts to the receiving channel from the 1- 49 yr,24-hr storm? Yes Are fountains proposed?(If Y,please provide documentation that 50 MDC(9)is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52,Are the dam and embankment planted in non-clumping turf grass? Yes 53�Species of turf that will be used on the dam and embankment Tall Fescue 54 Has a planting i been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION ,5 fPIeta,;j_6se this space to provide any additional information about the we 55 wet pond(s): Wet Pond 1 2:29 PM 10/22/2020