HomeMy WebLinkAbout820403_SSE to 2021_20201029ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Howard Brothers Farms, LLC
D&KFarm
391 JC Howard Lane
Autryville, NC 82318
Dear Mr. Howard:
NORTH CAROLINA
Environmental Quality
October 28, 2020
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS820403
D&KFarm
Animal Waste Management System
Sampson County
The Division of Water Resources (Division) received your sludge survey information on
September 23, 2020. With the survey results, you requested an extension of the sludge survey
requirement for the 91 lagoon at the D& K Farm facility. Due to the amount of treatment
volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a
sludge survey is not needed until December 31, 2021.
The next sludge survey for L-2 at Lafayette Farms L-2 should be performed before December
31, 2021. Please retain this letter and keep it with your farm records for reference.
Please call me at 919-707-3663 if you have any questions.
Sincerely,
3CUy A. DI,+N lztp
Bill Dunlap
Animal Feeding Operations Program
cc: Fayetteville Regional Office, Water Quality Regional Operations Section
Permit File AWS820403
DNorth Carolina Department of Environmental Quality Division of Water Resources
E Q��
_ 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
NORTH CARD OapartmeM ofEnviw
ronmenWl Uual� p ` 919.707.9000