Loading...
HomeMy WebLinkAbout20041040 Ver 3_Approval Letter_20100413NCDENR North Carolina Department of Environment and Beverly Eaves Perdue Governor Division of Water Quality Coleen H. Sullins Director Natural Resources Dee Freeman Secretary T A ri113 2010 SLIM H Ss IS N01 DWQ Project # 04 1040 V2 & V3 Brunswick County NC Baptist Assembly Attn: Richard Holbrook, Dito UAMAPERM 100 Caswell Beach Road Oak Island, NC 28465 Subject Property: NC Baptist Assembly Dredging Project, Oak Island Approval of 401 Water Quality Certification with Additional Conditions Dear Mr. Holbrook: You have our approval, in accordance with the attached conditions and those listed below, to maintenance dredge in the boat basin and existing access channel, as described within your CAMA Express application dated March 10, 2010 and 401 Express application received by the Division of Water Quality (DWQ) Wilmington Regional Office (WiRO) on April 7, 2010 and additional information received on April 12, 2010. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Numbers 3698 (GC 3698) and 3700 (GC 3700. These Certifications can also be found on line at: http://h2o.enr.state.nc.us/ncwetlands/certs.h.tml. These Certifications allow you to use the corresponding Nationwide 35 (NW 35) and 16 (NW 16) when issued by the US Army Corps of Engineers and the CAMA Major Permit when issued by the Division of Coastal Management. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge, and stormwater regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you maybe required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed on the following pages. Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Phone: 910-796-7215 / FAX: 910-350-2004 Internet: www.ncwaterguality.orq An Equal Opportunity/Affirmative Action Employer 50% Recycled/ 10% Post Consumer Paper NorthCarolina Naturally Customer Service 1-877-623-6748 Page Two NC Baptist Assembly Attn: Richard Holbrook, Director DWQ Project # 04 1040 V2 & V3 April 13, 2010 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Open Waters Calculation of quantities were (shallow bottom) dredged done in Auto CADD (Figure 3 of 4 basin and channel 3.92 acres (170,672.45 sq ft) attached) Coastal wetlands N/A 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. Turbidity Standard The turbidity standard of 25 NTUs (Nephelometric Turbidity Units) shall not be exceeded as described in 15 A NCAC 2B..0200. Appropriate sediment and erosion control practices must be used to meet this standard. Please notify DWQ ifANY turbidity issues arise during this protect Page Three NC Baptist Assembly Attn: Richard Holbrook, Director DWQ Project # 04 1040 V2 & V3 April 13, 2010 4. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. 6. No dredging within 10' of coastal wetlands This letter includes approvals for impacts for open water dredging and does not approve impacts to CAMA Coastal Wetlands. 8. Moratoriums Dredging moratoriums shall be observed as required by the NC Division of Marine Fisheries, NC Wildlife Resources, US Fish and Wildlife and National Marine Fisheries. 9. "Re-opener" Clause NC Baptist Assembly and its authorized agents shall conduct their activities in a manner consistent with state water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of state law and federal law. NC Baptist Assembly shall require its contractors (and/or agents) to comply with all of the terms of this Certification, and shall provide each of its contractors (and/or agents) a copy of this Certification. A copy of this Certification shall be included in the construction contract and available on the job site at all times. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15A NCAC 2H.0507(d). Before modifying the certification, DWQ shall notify NC Baptist Assembly and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to NC Baptist Assembly in writing, shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the proj ect. Page Four NC Baptist Assembly Attn: Richard Holbrook, Director DWQ Project # 04 1040 V2 & V3 April 13, 2010 10. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 /Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or waters impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan in the Central Office in Raleigh at 919.733.1786 or Joanne Steenhuis in the DWQ Wilmington Regional Office at 910.796.7215. Sincerely, Coleen H. Sullins, Director Division of Water Quality Enclosures: GC 3698 GC 3700 Certificate of Completion cc: Greg Finch - Land Management Group David Timpy - USACE Wilmington Regulatory Field Office Ian McMillan - DWQ 401 Unit Doug Huggett - DCM Morehead City Jason Dail - DCM Wilmington W. i i