HomeMy WebLinkAboutNCC204876_NOI Application_20201029Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 10/26/2020 4:50:58 PM (NCG01 NOI Submission)
Approve by Garcia, Lauren V 10/28/2020 10:34:24 AM (Review- Construction NOI 34014)
• The task was assigned to Garcia, Lauren V by round robin distribution 10/26/2020 4:51 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: October 28, 2020 5:00
PM 10/26/2020 4:51 PM
Submit by Selkane, Aziza 10/29/2020 11:29:48 AM (Payment Verification for NCC204876)
* Anna Serio
• Selkane, Aziza assigned the task to Selkane, Aziza 10/29/2020 11:28 AM
The task was assigned to DEMLR NCG01 Payment Team. The due date is: December 9, 2020 5:00
PM 10/28/2020 10:34 AM
.• SThF� ';
1
NORTH CAROLINA
EnrlronmertW quallly
A. Project Information
Part A.
Project Location and Waterbody Information
Are you submitting IT No
an NOI that was r Yes
rejected before?
1a. Project Name * The Oaks at Windwood, Section Three, Part Three - Lots 45-58
1 b. Specific Lot This field rray be used to list specifc lot numbers.
Numbers
2. County* Cumberland
3. Highway or Street Windwood Drive
Address* Street narre only is acceptable if no address number assigned yet
4. City or Township* Cedar Creek Township
5. State * NC
6. Zip Code * 28391
7. Latitude* Enter the latitude in decimal degrees
35.0271
8. Longitude* Enter the longitude in decimal degrees (M.JST be negative)
-78.7149
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
10/26/2020
Estimated Construction Project Start Date
10. Date to End*
11/30/2022
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Single Family Houses (SFE) (1521)
Standard Industrial Classification for Developrrent
12. Acres to be
5.85
disturbed*
(including off -site borrow and waste areas)
13. Total site area 6.22
(acres) *
14. Post- 0.98
construction (Estirrated)
impervious area
(acres) *
NCC Project NCC-CUMBE-2020-The Oaks at Windwood, Section Three, Part
Tracking ID Three - Lots 45-58
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please
enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You
may enter up to 3 waterbodies if needed.
15a. Receiving Buck Creek
Wate rbody* %rre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 18-68-12-5-2
Index No.* NCWaterbody Index Number
Stormwater rJ No
discharges will flow r- Yes
to additional
wate rs *
16a. Is this project r Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B. ^
Fl rnittee Inforrration - Legally Fbsponsible Entity and Individual
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization Legally Pesponsible Entity
Name * H&H Constructors, Inc.
It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field.
Note: The organization name must match the business entity name registered with the NC Secretary of State. You can
verify the registration here.
2. First Name * Brian
If Corporation, enter Faegistered Agent First %rre
3. Last Name* Walker
It Corporation, enter Pbegistered Agent Last %rre
3b. Title Division President
4. Permitee E-mail brianwalker@hhhomes.com
Address*
5. Permittee 910-849-5272
Telephone No.*
6. Permittee Mailing Street Address
Address* 2919 Breezewood Avenue, Suite 400
Address Line 2
City
Fayetteville
Fbstal / Zip Code
28303
Check box if the V Yes
street address the
same as mailing
address
7. Permittee Street Street Address
Address* 2919 Breezewood Avenue, Suite 400
Address Line 2
State / Frovince / Fbgion
NC
Country
USA
City State / Frovince / Region
Fayetteville NC
Fbstal / Zip Code Country
28303 USA
8. Type of Non -Government
Ownership *
C. Site Contact Information
Part C.
Roject Site Contact Inforrration
....................................................................................................................................................................................................
1. Primary Site
Brian
Contact - First
Name *
2. Primary Site
Walker
Contact - Last
Name *
3. Title
Division President
4. Site Contact E-
brianwalker@hhhomes.com
mail Address*
5. Site Contact
910-849-5272
Telephone No.
6. Organization
H&H Constructors, Inc.
Name
7. Site Contact
Street Address
Mailing Address*
2919 Breezewood Avenue, Suite 400
Address Line 2
city
Fayetteville
Postal / Zip Code
28303
8. Consultant Name
(Optional)
Dennis A. Gilbert
First and Last nacre
9. Consultant E-mail
dgilbert@mkrinc.com
This person will be copied on all correspondence.
10. Consultant
910-484-5191
Telephone No.
State / Province / Region
NC
Country
USA
D. E&SC Plan
Part D. ^
Erosion & Sediment Control (E&SC) Ran Approval Information
......................................................................................................................................................................................................................................................................................................................................
1. Date E&SC Plan 10/26/2020
Approved *
2. E&SC Plan Project CUMBE-2021-034
Number/ID * Assigned by agency or local program
3. E&SC Plan r State DEQ Office
Approved by* r Local Program
4. State DEQ Office * Fayetteville (FRO)
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application. For linear projects, please also upload a site map showing the overall extent of the project or
include the beginning point and end point coordinates in the "Notes" box below.
5. E&SC Plan APPROVAL-CUMBE-2021-034-H&H.pdf 770.86KB
Approval letter or Mast beRDFformat
Grading Permit
6. Site Location Map Helpful for linear project review
(Optional) Oaks at Windwood EC Lots 45 - 58-Approved Plan
703.2KB
p1.pdf
Mast be RDF format. Rease do not upload entire set of E&SC plans.
7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded documents support
the application. Include additional w aterbodies for linear projects if necessary.
8. NOI Certification WDO 45-58 NOI Certificate.pdf 501.31 KB
Form Mast be RDFfon-rat
This is an Express F No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6E (i) provides that:
Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other
document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement
of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the
Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
17 I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
rJ The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* 17 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* rJ I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
f Authorized Responsible Person*
Important: The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible
person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who
owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager
that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more
information on signatory requirements, see Part IV, Section B, Item (6) of that permit.
Signature
r � c l ter=t
Type Name * Brian Walker
Title Agent
Organization Legally Responsible Entity
H&H Constructors, Inc.
Date * 10/26/2020
F. Tracking and COC Info
NOI Tracking No. 34014
NC Reference No.
NCG01-2020-4876
Uses 'count_nurrber' variable (increrrented by SP)
Certificate of
NCC204876
Coverage (COC)
Uses 'count number' variable (increrrented by SP)
No.*
Count Number 4876
Sequential nurrber for subrrittal that is incremented by Stored Frocedure
COC Year 2020
Year of date reviewed (used to assign YY digits after "NOC' in COCno.)
Initial Invoice No. NCC204876-2020
Invoice Due Date 11/27/2020
Initial Fee $ 100.00
Invoice Status OPEN