April 13, 2010
Warren County
NCDWQ Project No. 20100256
US 158 at SR 1645
State Project No. 56.209311
APPROVAL of 401 WATER QUALITY CERTIFICATION and TAR-PAMLICO BUFFER
AUTHORIZATION, with ADDITIONAL CONDITIONS
Mr. J.W. Bowman, P.E., Division Engineer
NCDOT, Division 5
2612 North Duke Street
Durham, NC .27704
Dear Mr. Bowman:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
stream stabilization near US 158 at SR 1645 in Warren County:
StreamYmnacts in the Tar-Pamlico River Basin
Site Riprap Fill to Perennial Stream
linear ft Temporary Dewatering to
Perennial Stream linear ft Total Stream Impact
linear ft
1 35 50 85
Total 35 50 85
Total Stream Impact for Project: 85 linear feet.
Tar-Pamlirn Rinarian Buffer Imnacts
Site Zone 1 minus = Zone 1 Zone 1 Buffer Zone 2 minus = Zone 2 Zone 2 Buffer
Impact Wetlands Buffers (not Mitigation Impact Wetlands Buffers Mitigation ,-
(sq ft) in Zone 1 wetlands) Required (sq ft) in Zone 2 (not Required (using
(sq ft) (sq ft) (using 3:1 ratio) (sq ft) wetlands) 1.5:1 ratio)
s f[
1 1906 0 1906 N/A 408 0 408 N/A
Totals 1906 0 1906 0 408 0 408 0
* n/a = Total for Site is less than 1/3 acre and 150 linear feet of impact, no mitigation required
Total Buffer Impact for Project: 2,314 square feet.
The project shall be constructed in accordance with your application dated received April 5, 2010. After reviewing
your application, we have decided that these impacts are covered by General Water Quality Certification Number
3820. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. This approval
is also valid for the Tar-Pamlico Riparian Buffer Rules (15A NCAC 2B.0259/.0267). In addition, you should
acquire any other federal, state or local permits before you proceed with your project including (but not limited to)
Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire
with the accompanying 404 permit.
Transportation Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
Location: 2321 Crabtree Blvd., Ralegh, North Carolina 27604
Phone: 919-733-1786 \ FAK 919-733-6893
Internet. http.llh2o.enr.state.ncuslnmeUandsl
NorthCarolina
Naturally
An Emial Onportonily \ Affirmative Action Employer
I
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWQ and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). Additional buffer impacts may require compensatory mitigation
as described in 15A NCAC 0213.0260. For this approval to remain valid, you must adhere to the conditions listed in
the attached certification(s) and any additional conditions listed below.
Conditions of Certification:
1. All riparian buffers impacted by the placement of temporary fill or clearing activities shall be restored to the
preconstmction contours and revegetated. Maintained buffers shall be permanently revegetated with non-woody
species by the end of the growing season following completion of construction. For the purpose of this condition,
maintained buffer areas are defined as areas within the transportation corridor that will be subject to regular NCDOT
maintenance activities including mowing. The area with non-maintained buffers shall be permanently revegetated with
native woody species before the next growing season following completion of construction.
2. Pursuant to NCAC 15A 2B.0259(6) , sediment and erosion control devices shall not be placed in Zone 1 of any Tar-
Pamlico Buffer without prior approval by NCDWQ. At this time, NCDWQ has approved no sediment and erosion
control devices in Zone 1, outside of the approved project impacts, anywhere on this project. Moreover, sediment and
erosion control devices shall be allowed in Zone 2 of the buffers provided that Zone 1 is not compromised and that
discharge is released as diffuse flow.
3. For all streams being impacted due to site dewatering activities, the site shall be graded to its preconstruction
contours.and revegetated with appropriate native species.
4. Channel relocations shall be completed and stabilized prior to diverting water into the new channel. Stream banks
shall be matted with coir-fiber matting. Vegetation used for bank stabilization shall be limited to native riparian
vegetation, and should include establishment of a vegetated buffer on both sides of the relocated channel to the
maximum extent practical. Also, rip-rap is allowed to maintain the physical integrity of the stream, limited to the
amount approved in this certification. Once the stream has been turned into the new channel, it may be necessary to
ielocate stranded fish to the new channel to prevent.fish kills, if applicable. - - -
5. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or
protected riparian buffers.
6. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not
impede aquatic life passage..
7. The Pemiittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval.
8. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from
the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms,
cofferdams and other diversion structures shall be used to prevent excavation in flowing water.
9. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream.
10. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited.
12. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition,
the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division
Engineer and the on-site project manager.
13. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with ยง303(d) of the Clean Water Act) and any other
appropriate requirements of State and Federal law. If NCDWQ determines that such standards or laws are not being
met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that
further conditions are necessary to assure compliance, NCDWQ may reevaluate and modify this certification.
14. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas
within the fencing are prohibited unless otherwise authorized by this certification.
15. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules,
regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having
jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and
sedimentation control requirements, etc.
16. The Permittee shall report any violations of this certification to the Division of Water Quality within 24 hours of
discovery.
17. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division
Engineer shall complete and return the enclosed "Certification of Completion Form" to notify NCDWQ when all work
included in the 401 Certification has been completed.
18. Native riparian vegetation (i.e., trees and shrubs native to your geographic region) must be reestablished within
the construction limits of the project by the end of the growing season following completion of construction.
19. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be
located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road
construction activities.
20. Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning and Design'Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased"
borrow pits associated with the project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
21. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by
this Certification.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, N.C. 27699. This certification and its conditions are final and binding unless you ask for a hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you
have any questions, please contact Rob Ridings at 919-733-9817.
Sincerely,
9?-/
Coleen H. Sullins
Director
Cc: Chris Murray, Division 5 Environmental Officer
Eric Alsmeyer, US Army Corps of Engineers, Raleigh Field Office
Travis Wilson, NC Wildlife Resources Commission
File Copy