Loading...
HomeMy WebLinkAboutNCC190573_NOT Closeout Documents_20201029SEDIMENTATION INSPECTION REPORT New Hanover County Engineering Department 230 Government Center Drive • Suite 160 Wilmington, North Carolina 28403 TELEPHONE (910)-798-7139 Beth E. Wetherill, C.P.E.S.C. Soil Erosion Specialist Email: bwetherill@nhcaov.com Project Name & Location: Sleepy's Parking Lot Expansion. Grading Permit #: 43-01 R3 Financially Responsible Party & Address: Porters Neck Center, Inc. —1430 Commonwealth Drive, Suite 102 Wilmington NC 28403 Pictures: ❑ Yes N No Weather & Soil Conditions: Sunny Dry 73F Inspection Type: ❑ Initial ❑ Periodic N Final ❑ Complaint Date Report Sent: 10/25/2019 Contact Made With: N/A Inspection report to be sent/given, including financially responsible party: Dean Scarafoni — deanscarafoni@comcast.net Has this project been issued and NOV? ❑ Yes N No Potential NPDES violation? ❑ Yes N No Degree: Choose an item. NPDES Type: Choose an item. Is there offsite sediment? ❑ Yes N No Degree: Choose an item. Location: Click or tap here to enter text. Part1: Please take immediate corrective action for the following items within 7-10 days of this inspection for the site to remain in compliance with the Erosion and Sedimentation Control Ordinance: ® N/A Part2: Please take corrective action for the following items prior to next periodic inspection for the site to remain in compliance with the Erosion and Sedimentation Control Ordinance: N N/A Part 3: Additional Comments: Parking lot expansion is complete. Site is stable and will be finaled out. All fees are paid. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Projects is released. Termination of coverage under the NPDES General Stormwater Permit for Construction activities should be requested by the permittee via a Notice of Termination, if applicable Report by: Melissa Lyles JDate of Inspection: 10/24/2019 Others Present: N/A Mlvles@nhceov.com Pictures: Contact this office with any questions and/or comments about this report and/or project.