HomeMy WebLinkAbout20201610 Ver 1_Meeting Request Review_20201026ID#* 20201610
Version* 1
Regional Office* Central Office - (919) 707-9000
Reviewer List* Rick Trone
Pre -Filing Meeting Request submitted 10/26/2020
Contact Name *
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
Christopher J Burkhardt PWS
cburkhardt@falconengineers.com
Githens Shool Pump Station and Force MAin
City of Durham
Durham
Street Address
1210 Trinity Road
Address Line 2
Suite 110
aty
Cary
Postal / Zip Code
27513
Is this a transportation project? * r Yes r No
State / Province / Region
NC
Country
United States
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit F- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Please list all existing project ID's associated with this projects.*
NBRRO # 20- 151
Do you know the name of the staff member you would like to request a meeting with?
no
Please give a brief project description below.*
The City of Durham is proposing a new sanitary sewer pump station and
approximately 2,600 linear feet of new sewer force main along Old Chapel
Hill Road in Durham North Carolina. The new pump station will be installed
northeast of the Old Chapel Hill Road and Buchanan Drive intersection
near the existing pump station. The force main will continue east within the
North Carolina Department of Transportation right-of-way (ROW) of Old
Chapel Hill Road. The force main will tie into the existing manhole
immediately east of the transmission power line easement. Horizontal
direction drilling is proposed to avoid stream and wetland impacts. No
construction impacts are proposed along Buchanan Drive or north of the
existing pump station.
Please give a couple of dates you are available for a meeting.
10/30/2020
11 /6/2020
11 /13/2020
Please attach the documentation you would like to have the meeting about.
Preliminary Jurisdictional
Determination Githens School Lift 886.76KB
Station_SAW-2020-01749_Revised 1. pdf
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 10/26/2020
Reviewer Meeting Request Decision
Has a meeting been scheduled?* r Yes r No
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW-2020-01749 County: Durham County U.S.G.S. Quad: Southwest Durham
NOTIFICATION OF JURISDICTIONAL DETERNIINATION
Applicant: Christopher Burkhardt
Address: 1210 Trinity Road, Suite 110
Cary, North Carolina 27513
Size (acres) —8.0
Nearest Waterway New Hope Creek
USGS HUC 03030002
Nearest Town Durham
River Basin Cape Fear
Coordinates Latitude: 35.943444
Longitude:-78.981667
Location description: The project area is located at 4000-4600 Old Chapel Hill Road in
Durham, Durham County, North Carolina. The project area is shown as the blue -outlined
"Study Area" on the attached sketch entitled "Wetland Delineation."
Indicate Which of the Following Apply:
A. Preliminary Determination
X There are waters, including wetlands, on the above described project area, that may be subject to Section 404 of the
Clean Water Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The
waters, including wetlands, have been delineated, and the delineation has been verified by the Corps to be sufficiently
accurate and reliable. Therefore, this preliminary jurisdiction determination may be used in the permit evaluation process,
including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation
requirements, and other resource protection measures, a permit decision made on the basis of a preliminary JD will treat all
waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional
waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program
Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an
appealable action, by contacting the Corps district for further instruction.
_ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act
(CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the
waters, including wetlands, have not been properly delineated, this preliminary jurisdiction determination may not be
used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an
effective presumption of CWA/RHA jurisdiction overall of the waters, including wetlands, at the project area, which is
not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the
waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a
timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps.
B. Approved Determination
_ There are Navigable Waters of the United States within the above described property subject to the permit requirements of
Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA)(33 USC
§ 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for a period
not to exceed five years from the date of this notification.
_ There are waters of the U.S., including wetlands, on the above described project area subject to the permit requirements
of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
Page 1 of 2
SAW-2020-01749
_ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to
accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that
can be verified by the Corps.
_ The waters of the U.S., including wetlands, on your project area have been delineated and the delineation has been
verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be
relied upon for a period not to exceed five years.
_ The waters of the U.S., including wetlands, have been delineated and surveyed and are accurately depicted on the plat
signed by the Corps Regulatory Official identified below on . Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
_ There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our
published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification.
_ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to
determine their requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit
may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material,
construction or placement of structures, or work within navigable waters of the United States without a Department of the
Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If
you have any questions regarding this determination and/or the Corps regulatory program, please contact April Norton at
(919) 554-4884 or April.R.Norton(&usace.armv.mil.
C. Basis for Determination: N/A. An Approved JD has not been completed. See the Preliminary Jurisdictional
Determination form dated 10/6/2020.
D. Remarks: None.
E. Attention USDA Program Participants
The delineation included herein has been conducted to identify the location and extent of the aquatic resource boundaries
and/or the jurisdictional status of aquatic resources for purposes of the Clean Water Act for the particular site identified in this
request. This delineation and/or jurisdictional determination may not be valid for the Wetland Conservation Provisions of the
Food Security Act of 1985, as amended. If you or your tenant are USDA program participants, or anticipate participation in
USDA programs, you should discuss the applicability of a certified wetland determination with the local USDA service center,
prior to starting work.
F. Appeals Information for Approved Jurisdiction Determinations (as indicated in Section B. above)
If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331.
Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. If you request
to appeal this determination you must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Mr. Philip A. Shannin
Administrative Appeal Review Officer
60 Forsyth Street SW, Floor M9
Atlanta, Georgia 30303-8803
AND
PHILIP.A. SHANNINgUSACE.ARMY.MIL
SAW-2020-01749
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA form, it must be received at the above address by N/A.
It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence. Date: 2020.10.06
Corps Regulatory Official:
Date: 10/6/2020
wa "� 12:36:48-04'00'
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http:Hcolpsmapu.usace.anny.mil/cm_apex/f?p=136 * 0.
SAW-2020-01749
P'AFTOUTIFICATION OF ADNHNISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant: Don Greeley
File Number: SAW-2020-01749
Date: 10/6/2020
1600 Mist Lake Durham
Durham, North Carolina 27704
Don.Greelevndu rham nc. aov
919-560-4381
Attached
is:
See Section below
INITIAL PROFFERED PERMIT Standard Permit or Letter ofpermission)
A
PROFFERED PERMIT Standard Permit or Letter ofpermission)
B
PERMIT DENIAL
C
APPROVED JURISDICTIONAL DETERMINATION
D
PRELIMINARY JURISDICTIONAL DETERMINATION
E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPenuits.aspx or
Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the
permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your
objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal
the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the
permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit
having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer
will send you a proffered permit for your reconsideration, as indicated in Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
• ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature
on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the
permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit.
• APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you
may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form
and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of
this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or
provide new information.
• ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of
this notice means that you accept the approved JD in its entirety and waive all rights to appeal the approved JD.
• APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative
Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by
the division engineer within 60 days of the date of this notice.
SAW-2020-01749
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps
regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved
JD (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide new
information for further consideration by the Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your
objections to an initial proffered permit in clear concise statements. You may attach additional information to
this form to clarify where your reasons or objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps
memorandum for the record of the appeal conference or meeting, and any supplemental information that the
review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps
may add new information or analyses to the record. However, you may provide additional information to clarify
the location of information that is already in the administrative record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
al
If you have questions regarding this decision and/or the
If you only have questions regarding the appeal process you may
appeal process you may contact:
also contact:
District Engineer, Wilmington Regulatory Division,
US Army Corps of Engineers
Attn: April Norton
South Atlantic Division
3331 Heritage Trade Drive, Suite 105
Attn: Mr. Philip A. Shannin
Wake Forest, North Carolina 27587
Administrative Appeal Review Officer
60 Forsyth Street SW, Floor M9
Atlanta, Georgia 30303-8803
PHILIP.A.SHANNIN( )USACE.ARMY.MIL
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the appeal process. You will be provided a 15-day notice of any
site investi ation and will have the opportunity to participate in all site investi ations.
Date:
Telephone number:
Signature of appellant or agent.
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division, Attn: April Norton, 3331 Heritage Trade Drive, Wilmington,
North Carolina 27587
For Permit denials, Proffered Permits and approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin,
Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1OM15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137, PHILIP.A.SHANNIN(&USACE.APMW.MIL
�eleste Circle and Gilhens School LS
32061t
Welland B l Stream D
MaPPed Stream
_ J,`
';
On th� Survey}
--
Stream A
New Hope Creek/
Stream C
Stream B
'Ty\
Mapped Sire
(Not Present)
t
a
Ii Chh i
N
Appendix 2 - PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM
BACKGROUND INFORMATION
A. REPORT COMPLETION DATE FOR PJD: 10/6/2020
B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Don Greeley - 1600 Mist Lake Durham, Durham NC 27704
C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Githen School Lift Station, SAW-2020-01749
D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION:
(USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR
AQUATIC RESOURCES AT DIFFERENT SITES)
State: NC County/parish/borough: Durham City: Durham
Center coordinates of site (lat/long in degree decimal format):
Lat.:35.943444 Long.:-78.981667
Universal Transverse Mercator: NAD83
Name of nearest waterbody: New Hope Creek
E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY):
❑■ Office (Desk) Determination. Date: 10/6/2020
❑■ Field Determination. Date(s): 9/29/2020
TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY
JURISDICTION.
Site
number
Latitude
(decimal
degrees)
Longitude
(decimal
degrees)
Estimated amount
of aquatic resource
in review area
(acreage and linear
feet, if applicable)
Type of aquatic
resource (i.e., wetland
vs. non -wetland
waters)
Geographic authority
to which the aquatic
resource "may be"
subject (i.e., Section
404 or Section 10/404)
WA
35.943006
-78.975963
.01 a c
Wetland
404
WB
35.944339
-78.982333
0.1 ac
Wetland
404
SA
35.942962
-78.975962
75 L F
Non -Wetland
404
S B
35.943022
-78.975847
65 L F
Non -Wetland
404
SC
35.943364
-78.981342
686 LF
Non -Wetland
404
1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in
the review area, and the requestor of this PJD is hereby advised of his or her option
to request and obtain an approved JD (AJD) for that review area based on an
informed decision after having discussed the various types of JDs and their
characteristics and circumstances when they may be appropriate.
2) In any circumstance where a permit applicant obtains an individual permit, or a
Nationwide General Permit (NWP) or other general permit verification requiring "pre -
construction notification" (PCN), or requests verification for a non -reporting NWP or
other general permit, and the permit applicant has not requested an AJD for the
activity, the permit applicant is hereby made aware that: (1) the permit applicant has
elected to seek a permit authorization based on a PJD, which does not make an
official determination of jurisdictional aquatic resources; (2) the applicant has the
option to request an AJD before accepting the terms and conditions of the permit
authorization, and that basing a permit authorization on an AJD could possibly result
in less compensatory mitigation being required or different special conditions; (3) the
applicant has the right to request an individual permit rather than accepting the terms
and conditions of the NWP or other general permit authorization; (4) the applicant can
accept a permit authorization and thereby agree to comply with all the terms and
conditions of that permit, including whatever mitigation requirements the Corps has
determined to be necessary; (5) undertaking any activity in reliance upon the subject
permit authorization without requesting an AJD constitutes the applicant's acceptance
of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered
individual permit) or undertaking any activity in reliance on any form of Corps permit
authorization based on a PJD constitutes agreement that all aquatic resources in the
review area affected in any way by that activity will be treated as jurisdictional, and
waives any challenge to such jurisdiction in any administrative or judicial compliance
or enforcement action, or in any administrative appeal or in any Federal court; and (7)
whether the applicant elects to use either an AJD or a PJD, the JD will be processed
as soon as practicable. Further, an AJD, a proffered individual permit (and all terms
and conditions contained therein), or individual permit denial can be administratively
appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it
becomes appropriate to make an official determination whether geographic
jurisdiction exists over aquatic resources in the review area, or to provide an official
delineation of jurisdictional aquatic resources in the review area, the Corps will
provide an AJD to accomplish that result, as soon as is practicable. This PJD finds
that there "may be" waters of the U.S. and/or that there "may be" navigable waters of
the U.S. on the subject review area, and identifies all aquatic features in the review
area that could be affected by the proposed activity, based on the following
information:
SUPPORTING DATA. Data reviewed for PJD (check all that apply)
Checked items should be included in subject file. Appropriately reference sources
below where indicated for all checked items:
■❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor:
Map: Delineation Maps, Google Earth
0 Data sheets prepared/submitted by or on behalf of the PJD requestor.
■❑ Office concurs with data sheets/delineation report.
❑ Office does not concur with data sheets/delineation report. Rationale:
❑ Data sheets prepared by the Corps:
❑ Corps navigable waters' study:
❑ U.S. Geological Survey Hydrologic Atlas:
■❑
❑ USGS NHD data.
❑ USGS 8 and 12 digit HUC maps.
U.S. Geological Survey map(s). Cite scale & quad name: 1-24,000 SW Durham
■❑ Natural Resources Conservation Service Soil Survey. Citation: Durham County Sheet 30
■❑ National wetlands inventory map(s). Cite name: Wetlands Mapper
❑ State/local wetland inventory map(s):
■❑ FEMA/FIRM maps: 3720070900K
❑ 100-year Floodplain Elevation is: .(National Geodetic Vertical Datum of 1929)
■❑ Photographs: ❑■ Aerial (Name & Date): Google Earth 2019
or ❑ Other (Name & Date):
❑ Previous determination(s). File no. and date of response letter:
■❑ Other information (please specify): DWR Buffer Determination Letter, 6/5/2020
IMPORTANT NOTE: The information recorded on this form has not necessarily
been verified by the Corps and should not be relied upon for later jurisdictional
determinations.
�j Date : 2 02 0.10.06 12 :37:12
17/!J-04'00'
Signature and date of
Regulatory staff member
completing PJD
Signature and date of
person requesting PJD
(REQUIRED, unless obtaining
the signature is impracticable)'
' Districts may establish timeframes for requestor to return signed PJD forms. If the requestor does not respond
within the established time frame, the district may presume concurrence and no additional follow up is
necessary prior to finalizing an action.