Loading...
HomeMy WebLinkAboutNCS000434_Archdale Self Audit_Wells_20201026J DR, A T PHP''\SE II S�Ji 54 AU01 T T EIRA FLAT FOR PERT-VU ITS ISSUED PRIOR TO 2019 Edit yellow Mg-' hH0b3dft'EM5 Ito ICE MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) PROGRAM AUDIT REPORT NPDES PERMIT NO. NCSOOOXXX CITY, NORTH CAROLINA Address Audit Date: DATE Report Date: DATE North Carolina Department of Environmental Quality Division of Energy, Mineral & Land Resources Stormwater Program 512 N. Salisbury Street, 9th floor 1612 Mail Service Center Raleigh, NC 27699-1612 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX I\) 0-�, -,�s r J S r 19 r i�C�✓C'�r`ii'r. (Tl 7r1 (This page intentionally left blank) Audit Date: XXX MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX TABLE OF CONTENTS 1 Audit Details .......................................................................................................... PermitteeInformation..................................................................................................................................2 SupportingDocuments..................................................................................................................................3 Program Implementation, Documentation & Assessment...........................................................................4 Public Education and Outreach.....................................................................................................................8 Public Involvement and Participation.........................................................................................................11 Illicit Discharge Detection and Elimination (IDDE)......................................................................................13 Construction Site Runoff Controls.......................................:.......................................................................16 Post -Construction Site Runoff Controls............................................................................................... Pollution Prevention and Good Housekeeping for Municipal Operations.................................................25 Total Maximum Daily Loads(TMDLs)..........................................................................................................28 Site Visit Evaluation: Municipal Facility No. 1 ........................................................................ .............**.••.••30 Site Visit Evaluation: Municipal Facility No. 2.............................................................................................32 Site Visit Evaluation: MS4 Outfall No. 1 ............................................................................................... ......34 Site Visit Evaluation: MS4 Outfall No. 2......................................................................................................36 Site Visit Evaluation: Construction Site No. 1............................................................................................ ..38 Site Visit Evaluation: Construction Site No. 2................................................................................ ..............40 Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1............................................42 Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2............................................44 Appendix A: Supporting Documents Appendix B: Photograph Log DISCLAIMER This audit consists of an evaluation of program compliance with the issued permit and implementation of the approved Stormwater Management Plan. This audit report does not include a review of all program components, and program deficiencies in addition to those noted may be present. The permittee is required to assess program progress and permit compliance, and to implement the approved Stormwater Management Plan in accordance with the issued permit. Audit Date: XXX ii MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX This page intentionally left blank Audit Date: XXX MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Audit Details Audit ID Number: Audit Date(s): i ��1 NCS000XXX_City MS4 Audit_2019MODAY t1 Minimum Control Measures Evaluated: ❑ Program Implementation, Documentation & Assessment ❑ Public Education & Outreach ❑ Public Involvement & Participation ❑ Illicit Discharge Detection & Elimination ❑ Construction Site Runoff Controls — No delegated Sediment and Erosion Control Program ❑ Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program ❑ Post -Construction Site Runoff Controls ❑ Pollution Prevention and Good Housekeeping for Municipal Operations ❑ Total Maximum Daily Loads (TMDLs) Field Site Visits: ❑ Municipal Facilities. Number visited: C coy : ii;'�rr:• ❑ MS4 OutfaIIs. Number visited: `:'':o0s_` F1.• i i:erri. ❑ Construction Sites. Number visited: ._tn i.'r`r,• ❑ Post -Construction Stormwater Runoff Controls. Number visited: _­I!ijose ail i s.• ❑ Other: Numbervisited: Choose an ',eF".. ❑ Other: Number visited: i:hoose an ltenl. Name, Title Audit Report Author: Inspector(s) Conducting Audit Signature �tGt f f �/I Ax:: , OAS" Audit Report Author: Date: Date Organization t W' 4 t"I Audit Date(s): DATE Page 1 of 47 M54 Permit Audit Report City, NO NPDES Permit No. NCSOOOXXX Permittee Information MS4 Permittee Name: Permit Effective Date: Permit Expiration Date: City, State, ZIP: GPI I\L 7 7-� L Date of Last MS4 Inspection/Audit: Co-permittee(s), if applicable: Permit Owner of Record: S-�&r-�-- VJc� (� (0 ,rcu?I�71.� Primary MS4 Representatives Participating in Audit Name, Title Organization ' MS4 Receiving Waters Waterbody Classification Impairments j )Lr t ii,, Audit Date(s): DATE Page 2 of 47 MS4 Permit Audit Report .-:,... nir, mmnrc n-,-.,-,;+ ni nircnnnvvv Audit Date(s): DATE rage 3 ul 4/ MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Program Implementation, Documentation & Assessment Staff Interviewed: (Name, Title, Role) Permit Citation Program Requirement Status Supporting Doc No. The permittee maintained adequate funding and staffing to implement and manage,% Staffing and the provisions of the Stormwater Plan and meet all requirements of the permit. Funding The Stormwater Plan identifies a specific position(s) responsible for the overall :-loose C�"', coordination, implementation, and revision to the Plan. Responsibilities for all components of the Stormwater Plan are documented and o :sew position(s) assignments provided.y,, The permittee is current on payment of invoiced administering and compliance S? monitoring fees (see stormwater e-payments on DEMLR MS4 web page). 1 r Comments (Briefly describe funding mechanism, number of staff, etc.) II.A.2 Stormwater The permittee evaluated the performance and effectiveness of the program noose Plan Implementation components at least annually. R'6 and Evaluation If yes, the permittee used the results of the evaluation to modify the program choo� components as necessary to accomplish the intent of the Stormwater Program. anl' m. ` Did the permitted MS4 discharges cause or contribute to non -attainment of an 01pose applicable water quality standard? If yes, did the permittee expand or better tailor its BMPs accordingly to address Choose the non -attainment? an it ern. Comments I Audit Date(s): DATE Page 4 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Program Implementation, Documentation & Assessment II.A.3z Keeping the The permittee kept the Stormwater Plan up to date. Stormwater Plan Up to Date C,ous� `Z/ The permittee notified DEMLR of any updates to the Stormwater Plan. „ Comments (Indicate the date of latest Stormw ter Plan and describe the natyre_of any u dates, if applicable). ° Cur, e r Jej II.A.4 AvailabilityC'il+;o The permittee kept an up-to-date version of its Stormwater Plan available to the c'—L,7� of the Stormwater Division and the public online. "y'�i Jam' _ VI Plan The online materials included ordinances, or other regulatory mechanisms, or a list identifying the ordinances, or other regulatory mechanisms, providing the legal authority necessary to implement and enforce the requirements of the permit. Comments (Note what materials are available on line) II.A.3 & II.A.5 Stormwater Plan Did DEMLR require a modification to the Stormwater Plan? 1i+ors Modifications If yes, did the permittee complete the modifications in accordance with the -` moose established deadline? ar: i': _Mi. Comments (Note date of DEMLR notification, modifications required, and date modifications were completed, as applicable) ILA.6Sharing Responsibility itt Are any control measures implemented by an entity other than the permittee? Dose Cjc?c_,.2_ If yes, is there a written agreement in place? Comments (List the specific control measures implemented by others that do not have adequate written agreements, if applicable) II.A.7 The permittee maintained written procedures for implementing the six minimum =h ose Sq t; Written control measures. an Procedures Written procedures identified specific action steps, schedules, resources and ,� � aose "{?fin• responsibilities for implementing the six minimum measures. a ...I.. W nnnlirnhip) Comments (List the specific minimum measures tnar oo nor nave uaryuu« VVIN&&­ 1 Audit Date(s): DATE Page 5 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Program Implementation, Documentation & Assessment III. A The permittee maintained documentation of all program components including, but Program g not limited to, inspections, maintenance activities, educational programs, 6• c'= Documentation implementation of BMPs, enforcement actions etc., on file for a period of five years. Comments (List the specific program components that do not have adequate documentation on file and why, if applicable) III_B The permittee submitted annual reports to the Department within twelve months Annual Report from the effective date of the permit (See Section 111.B. for the annual reporting / Submittal period specific to this MS4).' " The permittee submitted subsequent annual reports every twelve months from the scheduled date of the first annual report submittal. The Annual Reports included appropriate information to accurately describe the progress, status, and results of the permittee's Stormwater Plan, including, but not limited the following: 1. A detailed description of the status of implementation of the Stormwater Plan as a whole. This will include information on development and implementation of each major component of the Stormwater Plan for the past year and , schedules and plans for the year following each report. 2. An adequate description and justification of any proposed changes to the Stormwater Plan. This will include descriptions and supporting information for Chow^ the proposed changes and how these changes will impact the Stormwater , '' H.e; n. Plan (results, effectiveness, implementation schedule, etc.). 4 3. Documentation of any necessary changes to programs or practices for �. assessment of management measures implemented through the Stormwater y( Plan. 4. A summary of data accumulated as part of the Stormwater Plan throughout Chaose the year along with an assessment of what the data indicates in light of the Stormwater Plan. 5. An assessment of compliance with the permit, information on the 'i"1,05' establishment of appropriate legal authorities, inspections, and enforcement actions. ' —`> Comments (Note dates that annual reports cover under current permit and generally describe report deficiencies, if any) IV.B Annual Reporting The Annual Reports document the following: 1. A summary of past year activities, including where applicable, specific 100sc quantities achieved and summaries of enforcement actions. C !L, ate, C 2. A description of the effectiveness of each program component. ,Choose 3. Planned activities and changes for the next reporting period, for each Choose program component or activity. a i ba'N. Audit Date(s): DATE Page 6 of 47 MS4 Permit Audit Report City, NO NPDES Permit No. NCSOOOXXX Program Implementation, Documentation & Assessment r�1C J.S 4. Fiscal analysis. r�;4 Comments (Note dates that annual reports cover under current permit and generally describe report deficiencies, if any) Audit Date(s): DATE Page 7 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Public Education and Outreach Staff Interviewed: (Name, Title, Role) Permit Citation Program Requirement Status Supporting Doc No. II.B.2.a Goals and The permittee defined goals and objectives of the Local Public Education and Objectives Outreach Program based on community wide issues. ; Comments (Generally describe process for establishing goals/objectives) �rwl� L II.B.2.b The permittee maintained a description of the target pollutants and/or stressors and .r:o::s Target Pollutants likely sources. ?�i rr Do / Comments (List target pollutants, note any that are missing or not appropriate) II.B.2.c The permittee identified, assessed annually and updated the description of the target C : CS-2 Target Audiences audiences likely to have significant storm water impacts and why they were selected. Comments (Describe any changes made, if applicable) Audit Date(s): DATE Page 8 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Public Education and Outreach II.B.2.d Residential The permittee described issues, such as pollutants, the likely sources of those pollutants, potential impacts, and the physical attributes of stormwater runoff in and Industrial/ p ltt p Commercial Issues their education/outreach program. Comments (Generally describe the residential/industrlial/commerciaal issues addressed) l�5 l'�.1' ✓C�L"L�v IN'� t� �� � I J'' � ilCr� t�'`�17�/�'' 1 IJ J II.B.2.e The permittee promoted and maintained an internet web site designed to convey the oo Informational Web Site ,. program's message. Comments (list web page address and general contents, or attach screen shot of landing page) '�(."" v JI D J I1.B.2.f The permittee distributed stormwater educational material to appropriate target Public Education ,( I. groups. Materials Comments (List distributed materials and quantity, message, distribution mechanism, target audience for each if not included in program documentation/annual reporting) n I`2 Y,n_1111 i �C:' r� .jL y >�C � � v II•B•2�., The permittee promoted and maintained a stormwater hotline/helpline for the OC oose r� Hotline/Help Line purpose of public education and outreach. Comments (Note hotline contact information and methods) for advertising its C-j\ p k©c'e— Car, �c�5 ,�425 iu v:, r��� r� I•B•2•h The permittee's outreach program, including those elements implemented locally or Choose through a cooperative agreement, included a combination of approaches designed to reach the target audiences. Audit Date(s): DATE Page 9 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Public Education and Outreach Public Education and Outreach For each media, event or activity, including those elements implemented locally or c Program through a cooperative agreement the permittee estimated and recorded the extent �r;se of exposure. Comments (Generally describe approaches, extent of exposure. Note any cooperating entities, agreements and scope of services, or reference comments in Section II.A.6. above.) Additional Comments: y1�s"—v.`It� ef`vC��"tit�T1 r4�! —iiy t�"�wrz��t CW�LhCf��" Audit Date(s): DATE Page 10 of 47 IVIS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX + Public Involvement and Participation Staff Interviewed: (Name, Title, Role) Permit Citation Program Requirement Status Supporting Doc No. II.C.2.a Volunteer Community The permittee included and promoted volunteer opportunities designed to promote �> Involvement ongoing citizen participation. Program Comments (Note opportunities promoted and date(s) of volunteer events) {— p �� � C� �'7' C-'�m.�JI l,,�ai� ���,. L� =�:�� rJ t/� ��", Cd J„^'l c- ti/ T�t��,� A✓�C�i (�= �r,r•.` !-�� {'n C J-� (`. � � `.arc% �\`T � �✓'r C.�� 5CA, 0 ILC.2.b Mechanism for The permittee provided and promoted a mechanism for public involvement that _, - goose ✓�� Public provides for input on stormwater issues and the stormwater program.i��nr^ • Involvement Comments (Note mechanism(s) for input and how promoted) ��c—t'bJe. f �'.t*tc'%Z+�`� �t7 V�, ��:a✓�"� C'i Je''�j�J II.C.2.c The permittee promoted and maintained a hotline/helpline for the purpose of public Cizc se Hotline/Help Line involvement and participation. a Comments (Note hotline contact information and how it is promoted) I� n r C711, %V)O Audit Date(s): DATE Page 11 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Public Involvement and Participation Additional Comments: Audit Date(s): DATE Page 12 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Illicit Discharge Detection and Elimination (IDDE) Staff Interviewed: (Name, Title, Role) Status Supporting Permit Citation Program Requirement Doc No. 071 IDDE Program The permittee maintained a written IDDE Program. ,.. -n If yes, the written program includes provisions for program assessment and 4 oG5e evaluation and integrating program.'' Comments (Note any deficiencies) II.D.2.b Legal Authorities Comments The permittee maintained an IDDE ordinance or other regulatory mechanism(s) that provides the legal authority to prohibit illicit connections and discharges to the MS4.;rirr. If yes, the ordinance applies throughout the corporate limits of the permittee. [Permit Part I.D] II.D.2.c The permittee maintained a current map showing major outfalls and receiving C' oose Storm Sewer streams. System Map �..>>ni•('CL ,��, c-r\ Comments CO %-` 1 i�r' „ r�ii; ri: ": rX_ 'tr;r4_,. II.D.2.d • Choose The permittee maintained a program for conducting dry weather flow field C1 Dry Weather Flow observations in accordance with written procedures. Program Comments (Generally summarize program, including frequency of observations and # or % of outfalls screened) Audit Date(s): DATE Page 13 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Fllicit Discharge Detection and Elimination (IDDE) II.D.2.e Investigation The permittee maintained written procedures for conducting investigations of he^ce Procedures identified illicit discharges. Comments (Generally describeprocedures are documented) `what c-� II.D.2.f For each case of an illicit discharge or potential illicit discharge, the permittee documented and tracked the Track and following: Document Investigations 1. The date(s) the illicit discharge was observed 2. The results of the investigation se :Z'nn'. 3. Any follow-up of the investigation i� j;n o Sn 4. The date the investigation was closed Comments (Note whether a standard inspection form is utilized to capture consistent information and a tracking mechanism is used) T 1 , i_41v�.ic II.D.2.s Employee Training The permittee implemented and documented a training program for appropriate municipal staff who, as part of their normal job responsibilities, may come into �J0 r contact with or otherwise observe an illicit discharge or illicit connection. Comments (Generally describe the staff training program, including frequency and which staff are trained) �V� (°E?l,J jn,.�:'"'L• c�.S LJCLi� C��Ci jj ,V'% j V IJ ` ► -V%+ M Public Public Education The permittee informed public employees of hazards associated with illegal ii 3ose dischar es and im ro er dis osal of waste. g p p p The permittee informed businesses of hazards associated with illegal discharges and ('hoase improper disposal of waste. ^�,j�� The permittee informed the general public of hazards associated with illegal 1-I Dose discharges and improper disposal of waste. aiti�. Comments (Note how each sector was informed, if applicable) ��C�:i�s I_?r, ,�,/��✓\ dt%Z�CS C� f1;�;,t-t-a'1. 1--�Z. ��S:..tl�,��S Audit Date(s): DATE Page 14 of 47 MS4 Permit Audit Report City, NO NPDES Permit No. NCSOOOXXX Illicit Discharge Detection and Elimination (IDDE) II•D•2•i The permittee promoted, publicized, and facilitated a reporting mechanism for the 'r Public Reporting public to report illicit discharges. Mechanism The permittee promoted, publicized, and facilitated a reporting mechanism for staff > > to report illicit discharges. The permittee established and implemented response procedures for citizen ro requests/reports. Comments (Generally describe reporting mechanisms and how promoted/publicized/facilitated/established) i �220 'T�� r��r�+r %\ t�•on� ILD.2.1 The permittee implemented a mechanism to track the issuance of notices of violation _^�' -s= Enforcement and enforcement actions administered by the permittee. If yes, the mechanism includes the ability to identify chronic violators for initiation of actions to reduce noncompliance. y Comments (Generally describe the established tracking mechanism, if applicable) Audit Date(s): DATE rdge 13 ui �►i MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Construction Site Runoff Controls Staff Interviewed: (Name, Title, Role) Program Delegation Status: M The permittee has a delegated Sediment and Erosion Control Program and implements the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 components of this minimum measure (complete the permit citation and SPCA citation sections). ❑ The permittee does not have a delegated Sediment and Erosion Control Program and relies on DEMLR to comply with the North Carolina Sedimentation Pollution Control Act (SPCA) of 1973 components of this minimum measure (complete only the permit citation section). Permit Citation Program Requirement Status supporting Doc No. II.E.3 Construction Site Runoff Controls The permittee provides and promotes a means for the public to notify the Bose (NPDES Permit No. appropriate authorities of observed erosion and sedimentation problems (e.g., NCS000435] promoting the existence of the DEQ DEMLR "Stop Mud" hotline). Comments (Describe how provided and promoted) SPCA Citation Delegated Program Requirement Status Supporting Doc No. 113A-60 Local erosion and The permittee has adopted an ordinance or other regulatory mechanism to enforce ��'ioose sedimentation the erosion and sedimentation control program. ar, control programs (a) If yes, the ordinance meets or exceeds the minimum requirements of the aose SPCA. If yes, the ordinance applies throughout the corporate limits of the permittee. t I'ioose [Permit Part I.D] ai1. G Comments (Provide regulatory mechanism reference or Supporting Documentation number) § 113A-60 Local erosion and The permittee collects a fee paid by each person who submits an erosion and ��i�aoSe sedimentation sedimentation control plan. al° control programs (d) Audit Date(s): DATE Page 16 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Construction Site Runoff Controls Comments (indicate th 1A-60 Local erosion and sedimentation control programs (e) e Has the permittee determined that a person engaged in a land -disturbing activity has failed to comply with an approved erosion and sedimentation control plan? If yes, has the permittee referred any such matters to the North Carolina Ch Sedimentation Control Commission for inspection and enforcement? Comments �.[j:1—. 1 ����L'T'c h ;{ ��r�m� ✓ ��.�:�t?- V.-7 5—L Y9C7'� ,� �Cvth�' '1 SzLe.. �— -�t,Z l r�i✓� c�.�rp �-�v� � ��.- a 5 y The permittee reviews each erosion and sedimentation control plan submitted to 113A-61 Local approval of erosion them and notifies the person submitting the plan that it has been approved, and sedimentation approved with modification, or disapproved within 30 days of receipt. control plans The permittee only approves an erosion and sedimentation control plan upon determining that it complies with all applicable State and local regulations. The permittee has disapproved of an erosion and sedimentation control plan in -h; o.-;m order to protect riparian buffers along surface waters.- If yes, the permittee notified the Director of the Division of Energy, I��(1 JCy Mineral, and Land Resources within 10 days of the disapproval. Comments . L �� I e\ L-l� c� e L XC.Ji'_F tt ) . � O e."/j{ § 113A-61.1 Inspection of land - disturbing activity; notice of violation (a) Comments The certificate of approval of each erosion and sedimentation control plan oS2 approved by the permittee includes a notice of the right to inspect.,r . The permittee provides for inspection of land -disturbing activities to ensure C,i 10cse compliance with the SPCA and to determine whether the measures required in an AU n. erosion and sedimentation control plan are effective. l nE_'J Audit Date(s): DATE Page 17 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Construction Site Runoff Controls § 113A-61.1 When the permittee determines that a person engaged in land -disturbing activity Inspection of land- has failed to comply with the SPCA, the Permittee immediately issues a notice of disturbing activity, violation upon that person. notice of violation �c) Each notice of violation issued by the permittee specifies the date by which the person must comply. Irp Each notice of violation issued by the permittee informs the person of the actions S;' that need to be taken to comply. �We-_ Comments 113A-64 Penalties Does the permittee issue civil penalties as part of the erosion and sedimentation program? Comments (indicate when/why a civil penalty is issued, and the amount, if applicable). V + �) Audit Date(s): DATE Page 18 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls Staff Interviewed: (Name, Title, Role) Audit Date(s): DATE Page 19 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls Implementation (check all that apply): ❑ The permittee implements the components of this minimum measure. ❑ The permittee relies upon another entity to implement the components of this minimum measure: name of entity AT The permittee implements the following deemed -compliant program(s), which meet NPDES MS4 post -construction requirements for the areas where implemented and in compliance with the specific program requirements as provided in 15A NCAC and noted below (Complete Session Law 2006-246 section below): ❑ Water Supply Watershed I (WS-1) —15A NCAC 213.0212 ❑ Water Supply Watershed II (WS-II) —15A NCAC 2B .0214 ❑ Water Supply Watershed III (WS-III) —15A NCAC 213.0215 ❑ Water Supply Watershed IV (WS-IV) —15A NCAC 213.0216 ❑ Freshwater High Quality Waters (HQW) —15A NCAC 2H .1006 ❑ Freshwater Outstanding Resource Waters (ORW) —15A NCAC 2H .1007 ❑ Neuse River Basin Nutrient Sensitive (NSW) Management Strategy —15A NCAC 26 .0235 ❑ Tar -Pamlico River Basin Nutrient Sensitive (NSW) Management Strategy —15A NCAC 2B .0258 ❑ Randleman Lake Water Supply Watershed Nutrient Management Strategy-15A NCAC 213.0251 ❑ Universal Stormwater Management Program —15A NCAC 2H .1020 Ordinance(s) (check all that apply): The permittee utilizes the following ordinances and/or regulatory authority to fulfill post construction minimum measure program requirements throughout the MS4 permitted area (check all that apply): ❑ DEQ model ordinance .® MS4 designed post -construction practices that meet or exceed 15A NCAC 02H .1000. N DEQ approved comprehensive watershed plan ❑ DEQ approved ordinance for a deemed -compliant Program (see list above) Instructions: For MS4s not implementing a S.L. 2006-246 deemed -compliant program, complete only the Permit Citation section below. For MS4s implementing a S.L. 2006-246 deemed -compliant program, complete the Session Law 2006-246 section below. If the MS4 does not implement a deemed -compliant program throughout the entire MS4 permitted area, then complete the Permit Citation section below for the permitted area(s) not covered under the S.L. 2006-246 deemed -compliant program. Session Law 2006- supporting 246 Program Requirement Status Doc No. Audit Date(s): DATE Page 20 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls Deemed -Compliant The permittee implements deemed -compliant Program requirements in Program(s) accordance with the applicable 15A NCAC rules., , Je�L_. l l The permittee implements deemed -compliant Program requirements throughout the entire MS4 area (if not, also complete the Permit Citation section below.) The permittee applies deemed -compliant Program requirements to all federal, state and local government projects within the permitted MS4 area who do not have their own NPDES stormwater permit. The permittee included deemed -compliant Program reporting in their MS4 Annual Reports. Pe The permittee included deemed -compliant Program implementation in their Stormwater Management Plan. g Comments Status Supporting Permit Citation Program Requirement Doc No. II.F.2.a The permittee maintained an ordinance or other regulatory mechanism designed .,.Choose Legal Authority to meet the objectives of the Post -Construction Site Runoff Controls Stormwater �.,tn Management Program. If yes, the ordinance applies throughout the corporate limits of the permittee \ U (Verify permit coverage area listed in Part I.D of permit and modifyv accordingly). The permittee has the authority to review designs and proposals for new � ; . 00S development and redevelopment to determine whether adequate Stormwater 4e control measures will be installed, implemented, and maintained. The permittee has the authority to request information such as stormwater plans, inspection reports, monitoring results, and other information deemed necessary to `: ,Oase evaluate compliance with the Post -Construction Stormwater Management e Program. The permittee has the authority to enter private property for the purpose of �:I_ aos� inspecting at reasonable times any facilities, equipment, practices, or operations Y related to Stormwater discharges. Comments (if the permittee relies upon another entity, specifically note the legal authority that allows that entity to implement the program within the M54 area) II.F.2.b Stormwater Control Chcosa The permittee utilizes strategies which include SCMs appropriate for the MS4. GI�r� Measures (SCMs) I]OQS` SCMs comply with 15A NCAC 02H .1000. Audit Date(s): DATE Page 21 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls Lummenrs L_ II.F.2.c The permittee conducted site plan reviews of all new development and Plan Reviews redeveloped sites that disturb greater than or equal to one acre (including sites that disturb less than one acre that are part of a larger common plan of, development or sale). If yes, the site plan reviews addressed how the project applicant meets the . 0 S 0 performance standards. a•.� If yes, the site plan reviews addressed how the project will ensure long-term te r' Sc maintenance. Comments -TK( 11 :toaJ""51'i� II.F.2.d The permittee maintained an inventory of projects with post -construction Inventory of Projects structural stormwater control measures installed and implemented at new �i10 C development and redeveloped sites. The inventory included both public and private sector sites located within the permittee's corporate limits that are covered by its post -construction ordinance YAD requirements. ` 1. Comments f, CADO �' Vic?,df`. iI'Yj Lj'2� II.F.2.e Deed Restrictions The permittee provided mechanisms such as recorded deed restrictions and �. and Protective protective covenants that ensure development activities will maintain the project 0052 „ Covenants consistent with approved plans. ar, is rn. Comments II.F.2.f The permittee implemented or required an operation and maintenance plan for -Choose Mechanism to the long-term operation of the SCMs required b the program. g p q y p g a`� J Require Long-term Operation and The operation and maintenance plan required the owner of each SCM to perform iaose Maintenance and maintain a record of annual inspections of each SCM. a ;(ft?n. Annual inspection of permitted structural SCMs are required to be performed by a '.Cboose qualified professional.�� Comments Audit Date(s): DATE Page 22 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls II.F.2.g The permittee conducted and documented inspections of each project site covered Inspections of under performance standards, at least one time during the permit term (Verify this modify Structural is a permit condition in Part II.F.2.g of permit and fY accordingly), Stormwater Control Before issuing a certificate of occupancy or temporary certificate of occupancy, the Measures permittee conducted a post -construction inspection to verify that the permittee's t ,, performance standards have been met or a bond is in place to guarantee condition in Part II.F.2.g of permit and modify completion(Verify this is a permit cond 9 accordingly. The permittee developed and implemented a written inspection program for SCMs ;•, J installed pursuant to the post -construction program(Verify this is a permit , condition in Part II.F.2.g of permit and modify accordingly. The permittee documented and maintained records of inspections.. The permittee documented and maintained records of enforcement actions. tt,,_ T'. Comments a II.F.2.h The permittee made available through paper or electronic means, ordinances, Educational post -construction requirements, design standards checklists, and other materials Materials and appropriate for developers. +� ; Training for Note: New materials may be developed by the permittee, or the permittee may use.r3 Developers materials adopted from other programs and adapted to the permittee's new development and redevelopment program. Comments (If the permittee has adopted materials from other programs, indicate here which materials they are using) �v� o. A Y%(21 II.F.2.i Enforcement Comments II.F.3.b New Development Comments The permittee tracked the issuance of notices of violation and enforcement actions. If yes, the tracking mechanism included the ability to identify chronic violators for initiation of actions to reduce noncompliance. The permittee fully complies with post construction program requirements on its own publicly funded construction projects. f o0Sr` "moose 0Osf Audit Date(s): DATE Page 23 of 47 MS4 Permit Audit Report City, NO NPDES Permit No. NCSOOOXXX Post -Construction Site Runoff Controls II.F.3.c Nutrient Sensitive Does the MS4 have areas drainingto Nutrient Sensitive Waters NSW (NSW) to 15A NCAC 02H .0150? 71 Waters If yes, does the permittee use SCMs that reduce nutrient loading in order to meet local program requirements. If yes, does the permittee also still incorporate the stormwater controls l:it, li:;:: s required for the project's density level. If yes, does the permittee also require documentation where it is not feasible to use SCMs that reduce nutrient loading. Comments (Provide reference for local requirements) esigd D Design Volume The permittee ensured that the design volumes of SCMs take into account the C:�aoose runoff at build out from all surfaces draining to the system. �,; ,et , Where "streets" convey stormwater, the permittee designed SCMs to be sized to treat and control stormwater runoff from all surfaces draining to the SCM including - ` streets, driveways, and other impervious surfaces. Comments Audit Date(s): DATE Page 24 of 47 MS4 Permit Audit Report r^�r„ rur• r%IPnFC Permit Nn Nccnnmay n..11nnrl (znnri Nnimi-kpPning for Municipal Operations Staff Interviewed: (Name, Title, Role) Permit Citation Status Supporting Program Requirement Doc No. II.G.2.a The permittee maintained a current inventory of facilities and operations owned _ c Facility Inventory and operated by the permittee with the potential for generating polluted Jti� .._., ,. stormwater runoff. Comments (Note number of facilities, typical inventory data and any facilities that are not inventoried that should be) y � ���! � �� i L � i.n)% 4�C_'_ � 0 � ` � � L• �G�, C, �sr2 ,` ,�, �' rZ ! r? c:- ti_ `�,. II.G.2.b The permittee maintained and implemented an O&M program for municipally oo; _, Operation and owned and operated facilities with the potential for generating polluted �Cl - Maintenance (O&M) stormwater runoff. for Facilities ,Ci- If yes, the O&M program specifies the frequency of inspections. If yes, the O&M program specifies the frequency of routine maintenance requirements. If yes, the permittee evaluated the O&M program annually and updated it as Cho0S J necessary. Comments II.G.2.c Spill Response The permittee had written spill response procedures for municipal operations. Pr' inns` Procedures Comments II.G.2.d Streets, The permittee evaluated existing and new BMPs that reduce polluted stormwater ICI oos: Roads, and Public runoff from municipally -owned streets, roads, and public parking lots within its aa- 1� : are/ corporate limits annually. 4 rage c5 or 41 Audit Date(s): DATE MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Pollution Prevention and Good Housekeeping for Municipal Operations Parking Lots Maintenance If yes, the permittee evaluated the effectiveness of existing and new BMPs / o-),= based on cost and the estimated quantity of pollutants removed. ` Comments II.G.2.f O&M for Catch The permittee maintained and implemented an 0&M program for the stormwater Basins and sewer system including catch basins and conveyance systems that it owns and " Conveyance Systems maintains. Comments (Briefly describe O&M program) II•G•2.g The permittee maintained a current inventory of municipally -owned or operated Structural structural stormwater controls installed for compliance with the permittee's post- Stormwater Controls construction ordinance. Comments (Describe inventory information and number of controls in inventory) II.G.2.h The permittee maintained and implemented an O&M program for municipally - O&M for Structural owned or maintained structural stormwater controls installed for compliance with Stormwater Controls the permittee's post -construction ordinance. If yes, then: " The 0&M program specified the frequency of inspections and routine Se maintenance requirements. ayi-IS,, The permittee documented inspections of all municipally -owned or maintained Chaose structural stormwater controls. yml S_ � The permittee inspected all municipally -owned or maintained structural 1100se stormwater controls in accordance with the schedule developed by permittee. a M• The permittee maintained all municipally -owned or maintained structural -ih0ose stormwater controls in accordance with the schedule developed by permittee. a, The permittee documented maintenance of all municipally -owned or Choose maintained structural stormwater controls. a i 13 Comments II.G.2.i The permittee ensured municipal employees are properly trained in pesticide, 0osc ; herbicide and fertilizer application management. a --:ec?n. Je?i,' , Audit Date(s): DATE Page 26 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX . m&4 r_r%r%A uni makppning for Municipal Operations ruHULIU" L.v.. M..M ---- I- - Pesticide, Herbicide The permittee ensured contractors are properly trained in pesticide, herbicide and h and Fertilizer fertilizer application management." Application Management The permittee ensured all permits, certifications, and other measures for applicators are followed. Comments y c , �A i �l �: c.`. The permittee implemented an employee training program for employees involved j: i10:'D e II•G•2•i Staff Training in implementing pollution prevention and good housekeeping practices.. i Comments Cam, II.G.2.k The permittee described and implemented measures that prevent or minimize 0 Fe Vehicle and contamination of stormwater runoff from all areas used for vehicle and equipment Equipment Cleaning cleaning. Comments I Audit Date(s): DATE Page 27 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Total Maximum Daily Loads (TMDLs) -�:� �� )�. Staff Interviewed: (Name, Title, Role) Program Status: ❑ The permittee is not subject to an approved TMDL (skip the rest of this section). ❑ The permittee is subject to an approved TMDL for: name of parameter(s) and date(s) approved There ❑ is ❑ is not a Waste Load Allocation (WLA) in the approved TMDL (If there is a WLA, then complete items H.H.1-5 below. If there is not a WLA, skip to item H.H.6 below) Permit Citation Program Requirement Status supporting Doc No. II.H.3 TMDLs Within 12 months of final TMDL approval, the permittee's annual reports included a description of existing p g programs, controls, partnerships, projects and strategies to address impaired waters. "'' rn,. Within 12 months of final TMDL approval, the permittee's annual reports provided a brief explanation as to how the programs, controls, partnerships, projects and ^ i` `Se strategies address impaired waters. air i-eni. II.H.4 TMDLs Within 24 months of final TMDL approval, the permittee's annual reports included an assessment of whether additional structural and/or non-structural BMPs are no" necessary to address impaired waters. ani`�r"• Within 24 months of final TMDL approval, the permittee's annual reports included a brief explanation as to how the programs, controls, partnerships, projects and (.Ilvc)s^c strategies address impaired waters. a ' i`er"• Comments II.H.5 TMDLs Within 36 months of final TM DL approval, the permittee's annual reports included C`i I {' a description of activities expected to occur and when activities are expected to occur. an fi; OGIT Audit Date(s): DATE Page 28 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Total Maximum Daily Loads (TMDLs) KYA Comments H.H.6 TMDLs If there is no Waste Load Allocation in the approved TMDL, the permittee evaluated strategies and tailored and/or expanded BMPs within the scope of the six minimum measures to enhance water quality recovery strategies in the jar; ,err watershed(s) to which the TMDL applies. The permittee described strategies and tailored and/or expanded BMPs in their o =s Stormwater Management Plan and annual reports =' Comments Audit Date(s): DATE Page 29 of 47 MS4 Permit Audit Report City, NO NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Municipal Facility No. 1 Facility Name: Date and Time of Site Visit: Facility Address: Facility Type (Vehicle Maintenance, Landscaping, etc.): Name of MS4 inspector(s) evaluated: Most Recent MS4 Inspection (List date and name of inspector): Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit: Name Title Observations Facility Documentation/Training Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific? What type of stormwater training do facility employees receive? How often? t-0�r�v�—y c5'�t�'� '��vCC�iiC✓� `J Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping? Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping? Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? Does the MS4 inspector's process include taking photos? Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)? Audit Date(s): DATE Page 30 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Municipal Facility No. 1 Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? *�D Did the MS4 inspector miss any obvious areas of concern? If so, explain: �V 0 Does the MS4 inspector's process include presenting the inspection findings to the facility contact? IyQ� Inspection Results Did the facility inspection result in any corrective actions to be implemented? if so, for what issue(s)? If compliance corrective actions were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE Page 31 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Municipal Facility No. 2 Facility Name: Date and Time of Site Visit: Facility Address: Facility Type (Vehicle Maintenance, Landscaping, etc.): Name of MS4 inspector(s) evaluated: Most Recent MS4 Inspection (Date and Entity): Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit: Name Title Observations Facility Documentation/Training Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific? What type of stormwater training do facility employees receive? How often? Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping? Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping? Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? Does the MS4 inspector's process include taking photos? Does the M54 inspector's process include reviewing the facility's SWPPP (or similar document)? Audit Date(s): DATE Page 32 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Municipal Facility No. 2 Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge? Did the MS4 inspector miss any obvious areas of concern? If so, explain: Does the MS4 inspector's process include presenting the inspection findings to the facility contact? Inspection Results Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)? If compliance corrective actions were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE Page 33 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: MS4 Outfall No. 1 Outfall ID Number: Date and Time of Site Visit: ' Outfall Location: Outfall Description (Pipe Material/Diameter, Culvert, etc.): Receiving Water: Is Flow Present? If So, Describe (Color, Approximate Flow Rate, Sheen, Odor, Floatables/Debris, etc.): Most Recent Outfall Inspection/Screening (Date): Days Since Last Rainfall: Inches: Name of MS4 Inspector(s) evaluated: Observations Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about illicit discharge indicators and investigations? Inspection Procedures Does the inspector's process include the use of a checklist or other standardized form? Does the inspector's process include taking photos? Did the MS4 inspector miss any obvious potential illicit discharge indicators or maintenance issues? If so, what were they? Audit Date(s): DATE Page 34 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: MS4 Outfall No. 1 Inspection Results Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)? will a follow-up outfall inspection be conducted? If so, for what reason? Notes/Comments/Recommendations Audit Date(s): DATE Page 35 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: MS4 Outfall No. 2 Outfall ID Number: Date and Time of Site Visit: Outfall Location: Outfall Description (Pipe Material/Diameter, Culvert, etc.): Receiving Water: Is Flow Present? If So, Describe (Color, Approximate Flow Rate, Sheen, Odor, Floatables/Debris, etc.): Most Recent Outfall Inspection/Screening (Date): Days Since Last Rainfall: Inches: Name of MS4 Inspector(s): Observations Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about illicit discharge indicators and investigations? Inspection Procedures Does the inspector's process include the use of a checklist or other standardized form? Obtain copy. Does the inspector's process include taking photos? Did the MS4 inspector miss any obvious potential illicit discharge indicators or maintenance issues? If so, what were they? Audit Date(s): DATE Page 36 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: MS4 ®utfall No. 2 Inspection Results Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)? Will a follow-up outfall inspection be conducted? If so, for what reason? Notes/Comments/Recommendations Audit Date(s): DATE Page 37 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Construction Site No. 1 Site/Project Name: Date and Time of Site Visit: " Site/Project Address: Operator: Project Type (Commercial, Industrial, Residential, CIP, Roadway, etc.): NCG Permit ID Number: Disturbed Acreage: Recent Enforcement Actions (Include Date): Name of MS4 Inspector(s) evaluated: Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title Observations Site Documentation/Training Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific? l Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions? What type of stormwater training do site employees receive? How often? Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about MS4 and NCGO10000 requirements for construction sites? Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs? Audit Date(s): DATE Page 38 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Construction Site No. 1 Inspection Procedures Does the MS4 inspector's process include the use of a checklist? Does the MS4 inspector's process include taking photos? Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)? Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Did the MS4 inspector miss any obvious violations? If so, explain: Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact? Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? If compliance issues were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE Page 39 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Construction Site No. 2 Site/Project Name: Date and Time of Site Visit: Site/Project Address: Operator: Project Type (Commercial, Industrial, Residential, CIP, Roadway, etc.): NCG Permit ID Number: Disturbed Acreage: Recent Enforcement Actions (Include Date): Name of MS4 Inspector(s) evaluated: Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title Observations Site Documentation/Training Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific? Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions? What type of stormwater training do site employees receive? How often? Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about M54 and NCG010000 requirements for construction sites? Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs? Audit Date(s): DATE Page 40 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Construction Site No. 2 Inspection Procedures Does the MS4 inspector's process include the use of a checklist? Obtain copy. Does the MS4 inspector's process include taking photos? Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)? Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Did the MS4 inspector miss any obvious violations? If so, explain: Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Does the M54 inspector's process include providing construction stormwater educational materials to the site contact? Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result m? If compliance issues were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE Page 41 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1 Site Name: Date and Time of Site Visit: Site Address: SCM Type: Most Recent MS4 Inspection (Include Date and Entity): Name of MS4 Inspector(s) evaluated: Most Recent MS4 Enforcement Activity (Include Date): Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title Observations Site Documentation Does the site have an operation and maintenance plan? Does the site have records of annual inspections? Are they performed by a qualified individual? Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about MS4 requirements for post -construction site runoff controls? Did the MS4 inspector appear knowledgeable about post -construction BMPs (general purpose/function, components, O&M requirements, etc.)? Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? What format? Does the MS4 inspector's process include taking photos? Does the MS4 inspector's process include reviewing the site's operation and maintenance plan and records of annual inspections? r Audit Date(s): DATE Page 42 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1 Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain: Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? If compliance issues were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE rage 4s or 4i MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2 Site Name: Date and Time of Site Visit: Site Address: SCM Type: Most Recent MS4 Inspection (Include Date and Entity): Name of MS4 Inspector(s) evaluated: Most Recent MS4 Enforcement Activity (Include Date): Name(s) and Title(s) of Site Representative(s) Present During the Site Visit: Name Title Observations Site Documentation Does the site have an operation and maintenance plan? Does the site have records of annual inspections? Are they performed by a qualified individual? Inspector Training/Knowledge What type of stormwater training does the MS4 inspector receive? How often? Did the MS4 inspector appear knowledgeable about MS4 requirements for post -construction site runoff controls? Did the MS4 inspector appear knowledgeable about post -construction BMPs (general purpose/function, components, 0&M requirements, etc.)? Inspection Procedures Does the MS4 inspector's process include the use of a checklist or other standardized form? What format? Does the MS4 inspector's process include taking photos? Does the MS4 inspector's process include reviewing the site's operation and maintenance plan and records of annual inspections? Audit Date(s): DATE Page 44 of 47 MS4 Permit Audit Report City_ NC- NPDES Permit No. NCSOOOXXX Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2 Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge? Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain: Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing? Compliance/Enforcement What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in? If compliance issues were identified, what timeline for correction/follow-up was provided? Notes/Comments/Recommendations Audit Date(s): DATE Page 45 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX APPENDIX A: SUPPORTING DOCUMENTS Audit Date(s): DATE Page 46 of 47 MS4 Permit Audit Report City, NC: NPDES Permit No. NCSOOOXXX APPENDIX B: PHOTOGRAPH LOG Audit Date(s): DATE Page 47 of 47