Loading...
HomeMy WebLinkAbout20171548 Ver 1_Compliance Response_20201026Strickland, Bev From: Lauren Norris -Heflin <Lauren.Norris-Heflin@timmons.com> Sent: Monday, October 26, 2020 9:42 AM To: David.E.Bailey2@usace.army.mil; Homewood, Sue Cc: Becky Ward; Sydni Law Subject: [External] Huffman Point - Culvert Plans for Approval, SAW-2017-02386, DWR # 20171548 Attachments: 1-Repair Plan and Profile.pdf, 2-Details.pdf Follow Up Flag: Follow up Flag Status: Completed External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Good morning Dave and Sue, Please find attached the proposed culvert plans to resolve the NOV at the Huffman Point site. These repairs can be completed within 30-days of your approval. It is estimated that the repairs will take approximately 1-week to complete from commencement of the work on -site. Can you confirm your approval of these plans for resolution of the NOV? Thanks, Lauren Norris -Heflin Environmental Project Manager TIMMONS GROUP I www.timmons.com 5410 Trinity Rd, Suite 102 1 Raleigh, NC 27607 Office: 919.866.4943 1 Cell: 919.607.1723 1 Fax: 919.859.5663 Lauren.Norris-Heflin@timmons.com Your Vision Achieved Through Ours 1 PLANTING NOTES: 1. WOODY SPECIES TO BE PLANTED WITH A COMBINATION OF THE FOLLOWING SHRUBS:ROOTED PLANT PLUGS OR LIVE STAKES IN ZONE A. PLANTS TO BE PLANTED TON CENTER. SUBMIT PLANT QUANTITIES FOR APPROVAL PRIOR TO PLANTING. SUBSTITUTIONS REQUIRE APPROVAL. TOTAL PLANTS=100 (COUNT BASED ON APPROXIMATE DISTURBED AREA SHOWN. ADJUST PLANT QUANTITIES IF DISTURBED AREA SHOWN IS EXCEEDED.) AMELANCHIER ARBOREA - SERVICE BERRY LINDERA BENZOIN - SPICEBUSH ILEX VERTICILLATA - WINTERBERRY CEPHALANTHUS OCCIDENTALIS - BUTTONBUSH CALYCANTHUS FLORIDUS - SWEET -SHRUB SAMBUCUS-ELDERBERRY XANTHORHIZA SIMPLICISSIMA - YELLOW ROOT 2. STREAM BANKS TO BE MATTED WITH FIBERWONDERS COIR MAT C-700 OR APPROVED EQUAL. PLACE RIPARIAN SEED, EROSION CONTROL SEED AND THIN LAYER OF STRAW PRIOR TO MATTING INSTALLATION IN ZONE A. 3. PLANTING STOCK TO BE GROWN BY NURSERIES WITHIN THE SAME PHYSIOGRAPHIC REGION (PIEDMONT) AND WITHIN 200 MILES OF THE PROJECT SITE. 4. ZONE B - RIGHT OF WAY/EASEMENT TO BE PLANTED WITH SITE TURF GRASS AND TEMPORARY SEED AND MULCHED. 5. FERTILIZER RECOMMENDATIONS CONTRACTOR TO FIELD VERIFY WITH ON SITE SOIL CONDITIONS: LIME'/2 TON/AC PHOSPHATE 20-40 LBS/AC POTASH 50-70 LBS/AC WATERING REQUIREMENTS ONCE/WEEK IF NO RAIN 6. RIPARIAN SEED MIX ERNST CONSERVATION SEEDS PIEDMONT RIPARIAN SEED MIX OR APPROVED EQUAL BY DESIGNER. APPLICATION RATE 25 LBS/AC. 7. TEMPORARY SEED TO BE PLACED WITH PERMANENT SEED. 8. STABILIZATION MEASURES TO BE PLACED WITHIN THE LIMITS OF ALL DISTURBED AREAS. PLANTING AREAS SHOWN APPROXIMATE LIMITS OF DISTURBANCE. PLANTING AND STABILIZATION PLAN 1 "=5' SCALE 1 "=5' 0 5' 10' .11 595 590 585 580 575 570 0+60 0 EXISTING G) \ \ \ \ \ \ SIDEWALK \� \\ \\ \ \ \ \ \ \ \ 1pO \ EXISTING WEIR 584.59 FT. (TO BE REMOVED) x / / EXISTING JB / NN \RIM=595.43 FT./ EXISTING WEIR 583.52 FT. / (TO BE REMOVED), 1 BOULDER SILL _ 2 BACKFILLED WITH CLASS \\ \ �`� \ \ \ \ EXISTING - - _ B #57 STONE AND SOIL \ \ \ / "XI/ \ \ SILT FENCE \ \ \ / / / \ \ \ a RIPRAP \\ \\ \ `\ \\ \\ \ I \\ \\ \ Qg SS TRANSITION \ \\ ` \ \\ \ \ \ I TOP OF HW \ 0°G --------------584-_--_-- \\ \ \\\ \ \ 589.81 FT. \% / BOULDER --- \ \ I / //��/\\\ EXIS CROSS VANE CUR �\ /\ ` a S INV. I x INV. \ / / // \ PROPOSED 60" RCP �TL� cS' \ 3-INCHES H INV. OUT=582.47 FT. \ 'A�'Li� \ TYP.- 9 LOC TOP OF WI,IR EXISTING RIPRAP ,--583 - ' r\ -�583.16 IF �F \ ,(TO BE REMOVED) TOP OF WW \ \ 586.86 FT. \ \ EXISTING STREAM i 83 cbti RIPRAP 0\ \ \ V A\ CENTERLINE - -'i i cpcp TRANSITIONEXIS \ \ I I `� i i r o I RE RAPNG D --EXISTING TOE - --- ti ICI CID (O BEOV ) - I-700 MATTING 3 I I (SEED AND PLANT WITH 2 WOODY VEGETATIONca ;IzLOW S I I I I II X I EXISTING I a II SILT FENCE -EXISTING LOG SILL S II 11 I I I I I I I - OPENING ELEV.=581.63 CONSTRUCTED I I I I I I (TO BE REMOVED) ' RIFFLE a PLAN VIEW SCALE 1"=10' OEM 0 10' 20' IX xp0 INV. IN 585.49 FT �\ // \ \ u EXISTING \ \ �\ CURB INLET \ 'ING ` INLET \ J=583.66 ►UT=583.64 31LL LOCATION ];H ITIONS �\ LEGEND s �F �9 2� 40 SITE GRAND OAKS BLVD 94 0�1�� C'o�P� PNjNON� RO VICINITY MAP NOT TO SCALE -592 --- EXISTING CONTOURS (APPROXIMATE LOCATIONS) STREAM CENTERLINE - - - - RIGHT OF WAY CLASS II RIPRAP PLANTING ZONE A PLANTING ZONE B ® SILL LOG SF SF SILT FENCE SS EXISTING SANITARY SEWER BOULDER CROSS VANE -583 PROPOSED CONTOURS ® PROPOSED SILL LOCATION NOTES: 1. CONTRACTOR TO MAINTAIN AND IMPLEMENT EROSION CONTROL MEASURES AS NEEDED TO PREVENT SEDIMENT DEPOSITION DOWNSTREAM. PLACE SILT FENCE AS NEEDED. 2. TOTAL SITE BOULDERS: ROCK CROSS VANE = 22 ROCK SILL AT 60" PIPE = 2 HEAD OF RIFFLE = 2 TOTAL = 26 w u- F_: �! 00 LLo I I > J J w U) 00 N In > W J Z Z °O O Y CD 4_ 00 �O I�j v^ jam? Q W t-Z CO4_� a-T O co O EXISTIN6 STREET O It+ O+ oQw ZF- u- QQW 2 O m U' ZJ X CURB INLETS N Q X X c j II II II II II II 11 II II II II II � I .9' 8.3' 25.8' 8.2' II II 1. 11 I - - ------- -- --- -BOULDER �I nxtr-m___ -_ I II --- --- -- ------- ---- II I I EXISTING (TO LOG D BE REMOVKED 1 I -- ---_-_-_-- ___ _ - --_--- - _____ II II I I I EXISTING 60" RCP CROSS VANE TOP ELEV=582.66 FT. I I I II I I EXIS I II I ------ ---- 3' -----__ ---- --- -- XISTIN (TO BE SILL ' SLOPE g•9% O --- ---------- ------ OOL EMOVED) L _PROPOSED SILL LOCATION 3-INCH HIGH P(9) LOCATIONS 2 2 CONSTRUCTED RIFFLE � BOULDER SILL /BACKFILLED WITH CLASS B, #57 STONE AND SOIL 2 BOULDERS (1-1.5')Hx1.5Wx3'L a') EXISTING GROUND w w w w w ♦- J J J Lo Lo SURV YED 9-/3/2020 ; z_Lo W u- ti N II o � o w°° O� d II �Q -f- a cn LL a > W _j w U) o- W O� d II OQ a cn � O a > W J w o LLI� O+ II OQ f- a U) LL O co o W N O� d II 0Q a cn co F5 o-ry ���C a ON > d II W 0Q J -f- w a P. N F o- L°n°� ,6 a ON > d II W oQ J -f- w a cn O o- L°n°��� a ON II �Q L-f- a cn LL O o- N a ON >_ II W OQ J�-f- a cn co N L°n° a > W J w co o W ~ O+ d II OQ w a cn co L°n° a > W J w Lo 00 a > W_ Jw-f- w Z _ > z_ W 0+80 1+00 1+10 1+20 1+30 1+40 1+50 1+60 1+70 1+80 1+90 2+00 2+10 2+20 EXISTING STREAM AND PIPE INTERNAL PROFILE WITH PROPOSED IMPROVEMENTS SCALE 1 "=10' HORIZONTAL 1 "=5' VERTICAL 2+30 2+40 2+50 2+60 600 595 590 585 580 r � 575 570 2+70 HORIZONTAL SCALE 1 "=10' 0 10, 20' ?94 w J Q U) In J Q U w ti;tititrirrrrr,,tr. SEAL /f16?W.:Qo 13344 on. "GINS U r� ui O c: o E N E LuLn z + N Q Lu u of of1.4 d LL N co UQ" Lu Lu 0 M N a2�o0 c� C)� _:j --I ru z Lu M Q a Q o of�oLLU otf ­i �L L _ o � z �� 0 Ln rn J W H- Ln 0 0 0 w w U a z 0 0 z 0 a U w z O w w H- Q 0 DATE 10-15-2020 DRAWN BY S. VANDERGRIFT DESIGNED BY B. WARD P.E. CHECKED BY B. WARD P.E. SCALE AS -NOTED O ., ^ w ■ > 1--III . _ _0 Q z L.L O J V l U �z Q cl� Q � z 00 < J Z Jru � I� Q m JOB NO. 45762 SHEET NO. 1 1 4-5' TOP ROCK ELEVATION=582.66 FT. O J OJ PLACE FOOTER w w ROCKS 1/2 OF a OVERALL DIST. (TYP. BOTH SIDES) z o J N O C0 LL r- TOP ROCK ELEV.=583.0 FT. 7.5' WIDTH X. 7.5' WIDTH INSTALL C-700 COCONUT FIBER BLANKETS 1 ON BANKS - SEE SECTION VIEW "B-B" SEED WITH RIPARIAN MIX AND REPLANT WITH WOODY VEGETATION BOULDER CROSS VANE DETAIL SEEDLING / LINER BAREROOT PLANTING DETAIL HEALING IN 1. Locate a healing -in site in a shady, well protected area. 2. Excavate a flat bottom trench 12" deep and provide drainage. 3. Backfill the trench with 2" well rotted sawdust. Place a 2" layer of 2/7 well rotted sawdust at a sloping angle at one end of the trench. 4. Place a single layer of plants against the sloping end so that the root collar is at ground level. 5. Place a 2" layer of well rotted sawdust over the roots maintaining a sloping angle. 6. Repeat layers of plants and sawdust as necessary and water thoroughly. 1. Insert planting bar as shown and pull handle toward planter. NOTES: 1. BOULDER SIZE, MINIMUM 2' x 3' x 1.5'. 2. ESTIMATE BOULDERS = 22 FT. FOR CROSS VANE CONSTRUCTION. INSTALL C-700 COCONUT FIBER BLANKETS BEYOND FURTHEST DOWN STREAM ROCK ON DISTURBED BANKS SEED WITH RIPARIAN MIX AND REPLANT, WITH WOODY VEGETATION TOP ROCK ELEV 583.0 FT. DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR 4. Pull handle of bar toward planter, firming soil at bottom. PLANTING NOTES: PLANTING BAG Duringg planting, seedlings shall be kept in a moist canvas bag or similar container to prevent the root systems from drying. 2. Remove planting bar and place seedling at correct depth. 3. Insert planting bar 2" toward planter from seedling. 5. Push handle forward 6. Leave compaction firming soil at top. hole open. Water thoroughly. KBC PLANTING BAR Planting bar shall have a blade with a triangular cross section and shall be 12" long, 4" wide and 1" thick at center. ROOT PRUNING All seedlings shall be root pruned, if necessary, so that J w J w w w O 0 z w 5' TAIL LENGTH (TYP. ) w J LL w ry w O 0 z w TAPER ROCK FROM BOTTOM OF TRENCH SLOPE 3HAV RIFFLE END OF RIFFLE CLASS II TO DEPTH "B" AT 2 =TFFL T T----� I. I I) I I I \\�� L STREAM FLOW PROPOSED CHANNEL A� CENTERLINE RIFFLE VARIES 4-5 FEET TAIL LENGTH_ (TYP. ) EXISTING CHANNEL PLACE BOULDER AT HEAD OF RIFFLE (ESTIMATED 2 - SEE MINIMUM SIZE DETAIL 1) ITS ,I i BANKFULL _ C-700 FABRIC LINE BL TRENCH SIDES PRIOR TO STONE PLACEMENT - t IN AREAS OUTSIDE OF ROCK TOE STONE MIX SECTION VIEW "A -A" NTS TABLE 1.0 - CONSTRUCTED RIFFLE DIMENSIONS Length "L" Width "A" Depth "B" Class (ft) (ft) (in) 11 13.5 4 to 5 24 TABLE 2.0 - CONSTRUCTED RIFFLE MIX Riffle Mix Chart Percent of Mix NCDOT NCDOT NCDOT NCDOT NCDOT Riffle Class Boulder Class II Class I Class B Class A 457 Riprap Riprap Riprap Riprap Stone II 1% 65% 0% 30% 0% 5% PROPOSED CONSTRUCTED RIFFLE APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGE ONTO STABLE RIPRAP PAD TO PREVENT--$COUR H FLOW SEDIMENT DIKE DISCHARGE HOS� �- DEWATERING PUMP P INTAKE HOSE CLEAN �- WATER DIKE WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY STREAM DIVERSION PUMP INTAKE HOSE STREAMBANK CSUMP-HOLE FOR POOL (12" TO 18" DEEP, 2-FT DIA.) TEMPORARY PUMP AROUND SEQUENCE 1. SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2. INSTALL UP -STREAM SANDBAG DAM. 3. INSTALL DOWN -STREAM SANDBAG DAM. 4. THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM. 5. STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. NOTES: 1. SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA. THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2. WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE. THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAM BANK. 3 LONGITUDINAL ANCHOR TRENCH STAKE AT T-5" \ INTERVALS Jel TERMINAL SLOPE AND CHANNEL ANCHOR TRENCH CHECK SLOT AT 25' INTERVALS (MIN) ISOMETRIC VIEW �G 4 FWOODEN STAKES INITIAL CHANNEL ANCHOR TRENCH INTERMITTENT CHECK SLOT NOTES: 1. CHECK SLOTS TO BE CONSTRUCTED AT 25' INTERVALS. 2. ALL MATTING TO BE SECURED WITH WOODEN STAKES ACCORDING TO THE SPECIFICATIONS AT 5' INTERVALS. 3. FABRIC OVERLAP WHEN 2 ROWS OF MATERIAL ARE USED SHALL BE PLACED WITH THE UPPER ROW OF MATERIAL PLACED OVER THE LOWER ROW OF MATERIAL. 4. TRENCH MATTING AT TOP AND BOTTOM OF MAT AS SHOWN IN DETAIL 5. OVERLAP FABRIC IN DIRECTION OF FLOW WITH MATTING UPSTREAM ON TOP OF DOWNSTREAM MAT. 6. MATTING WILL BE INSTALLED ACCORDING TO THE SPECIFICATIONS. TYPICAL MATTING INSTALLATION IItItdIII, to, {� y� CA RO" +rir SEAL 13344 ..tip +4%. E O U 6 o � o E N = z ,cr Q U 0 W ro O wUOfN Of a U. °' °� z O LU0oM �cx� � a 0U � z _jcn U X .E Q w W-a Q o U 0 cn Ln Z M L O H h- o Lu Inrn J w H- Ln O O O 0 w > w w = Q U 0 Q z O cn DATE 10-15-2020 O } DRAWN BY VANDERGRIFT DESIGNED BY B. WARD P.E. CHECKED BY B. WARD P.E. IL 0 SCALE AS -NOTED z J O U rr^^ Vl 0 J Boa w O O z J 4 REFORESTATION DETAIL SCALE: NOT TO SCALE 01 TEMPORARY PUMP AROUND JOB NO. 45762 SHEET NO. 2