Loading...
HomeMy WebLinkAbout20060138 Ver 2_Inspection_20100401ff r NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Governor Director Dee Freeman Secretary April 1, 2010 City of Greensboro Attn: Thomas L. Cordell Engineering Design & Inspection 300 W. Washington St. Greensboro, NC 27401-2624 Darrell Ferguson NCDOT, Division PO Box 14996 7-Resident Engineer 1584 Yanceyville Street Greensboro, NC 27415 Subject: Hornaday Road DWQ permit no. 20060138 Guilford County Dear Sirs: In response to your requests, Amy Euliss and Sue Homewood, NC Division of Water Quality (DWQ) meet with Mr. Cordell and other City of Greensboro staff, a NCDOT Division 7 Inspector, and Adam Holcomb of Dane Construction regarding the placement of bent 43 on March 31, 2010. As a follow up to our meeting, Dane Construction sent us a letter dated March 31, 2010 detailing the construction activities that will occur adjacent to and inside DOT's Long Branch Mitigation Site and the Randleman Lake Buffer. Through issuance of this letter, we approve the commencement of construction activities and placement of sediment and erosion control activities in the Randleman Lake Buffer as detailed in the March 31, 2010 letter from Dane Construction, as long as the following conditions are met: 1. DWQ permit no. 20060138 shall be modified to account for permanent and temporary impacts to Randleman buffer associated with bent placement and sediment and erosion control measures. An modification application shall be received within 30 days of your receipt of this letter. 2. Any disturbed vegetation shall be replanted with like vegetation. 3. If the Long Branch mitigation site is inadvertently harmed, this site shall be repaired. This could result in increased monitoring time of the mitigation site. If any repairs to the mitigation site are necessary, these shall be coordinated with and approved by NCDOT and DWQ. 4. Please reassess the location of the preformed scour hole. Diffuse flow must be achieved at the outlet of the preformed scour hole. If necessary, the placement of the scour hole might need to be shifted away from the bridge bent. Winston Salem Regional Office 585 Waughtown Street, Winston Salem, North Carolina 27107-2241 Phone: 336-771-5000 \ FAX: 336-71 -4631 Internet: httpJ/portal,ncdenr.org/web/wgihome/ro/wsro NorthCarolina Nahirally An Equal Opportunity t Affirmative Action Employer 5. Erosion control measures must installed in a manner that is in compliance with Division of Land Resources requirements. Please contact Amy Euliss at 336-771-4959 or myself at 336-771-4964 if you have any questions. Sue Homewood Winston Salem Regional Office cc: Adam Holcomb, Dane Construction, e-copy Andy Williams, USACE Raleigh Field Office, e-copy Chuck Kirchner, Land Quality, e-copy Jamie Lancaster, NCDOT PDEA- NEU, e-copy Jerry Parker, NCDOT Division 7 DWQ Wetlands/401 Unit File Copy 2