HomeMy WebLinkAbout820160_SSE Letter to 2025_20201028ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Director
Anthony E. Darden
Darden Farms Nursery
306 Timberlake Drive
Clinton, NC 28328-9761
Dear Mr. Darden:
NORTH CAROLINA
Environmental Quality
October 28, 2020
Subject: Sludge Survey Testing Dates
Certificate of Coverage No. AWS820160
Darden Farms Nursery
Animal Waste Management System
Sampson County
The Division of Water Resources (Division) received your sludge survey information on
September 23, 2020. With the survey results, you requested an extension of the sludge survey
requirement for lagoon 1 at the Darden Farms Nursery facility. Due to the amount of treatment
volume available, and the rate of sludge accumulation for the lagoon, the Division agrees that a
sludge survey is not needed until December 31, 2025.
The next sludge survey for lagoon 1 at Darden Farms Nursery should be performed before
December 31, 2025. Please retain this letter and keep it with your farm records for reference.
Please call me at 919-707-3663 if you have any questions.
Sincerely,
3 a,�l A. 171,+, lap
Bill Dunlap
Animal Feeding Operations Program
cc: Fayetteville Regional Office, Water Quality Regional Operations Section
Permit File AWS820160
a-]
DNorth Carolina Department of Environmental Quality Division of Water Resources
E Q��
_ 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh, North Carolina 27699-1636
NORTH CARD OapartmeM ofEnviw
ronmenWl Uual� p ` 919.707.9000