HomeMy WebLinkAbout20201570 Ver 1_Meeting Request Review_20201027 tie R•.'.
DWR Pre-Filing Meeting Request Form
NORTH CAROLINA
EnWmnnacnrrtl Qua fay
ID#* 20201570 Version* 1
Regional Office* Asheville Regional Office-(828)296-4500
Reviewer List* Kevin Mitchell
Pre-Filing Meeting Request submitted 10/27/2020
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Contact Name* Patrick J. Breedlove
Contact Email Address* pjbreedlove@ncdot.gov
Project Name* Macon County-Bridge 343
Project Owner* NCDOT Division 14
Project County* Macon
Owner Address: Street Address
253 Webster Road
Address Line 2
City State/Rovince/Region
Sylva North Carolina
Fbstal/Zip Code Country
28779 United States
Is this a transportation project?* r Yes r No
Type(s)of approval sought from the DWR:
rJ 401 Water Quality Certification- I— 401 Water Quality Certification-
Regular Express
I— Individual Permit I— Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
(' Yes r No
Please list all existing project ID's associated with this projects.*
14SP.20561.1
Do you know the name of the staff member you would like to request a meeting with?
Kevin Mitchell
Please give a brief project description below.*
Concrete bridge replacement with a cored slab bridge on West Old Murphy
Highway over Allison Creek(WS Ill;Tr.). Minor roadway width
improvements.There is a unnamed tributary that will be slightly impacted
but culvert installation.
Please give a couple of dates you are available for a meeting.
11/30/2020
Please attach the documentation you would like to have the meeting about.
Macon County-B343-Plans.pdf 9.28MB
pdf only
By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
. I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an
application.
Signature
` rzttc (-30
Submittal Date 10/27/2020
Reviewer Meeting Request Decision
.........................................................................................................................................................................................................................................................................................................................................................................................................................................................
Has a meeting been scheduled?* 0 Yes U No