HomeMy WebLinkAbout20010902 Ver 1_More Info Received_20040830? .t
MEETING MINUTES
DIVISION OF WATER QUALITY MEETING
RUNWAY 5R-23L SAFETY AREA EXTENSIONS
RALEIGH-DURHAM INTERNATIONAL AIRPORT
WAKE COUNTY, NORTH CAROLINA
RDU PROJECT NO. 080409
DELTA PROJECT NO. NC 04080
Date: August 23, 2004
Time: 3:00 PM
ATTENDEES:
Ron Jewett
Mike Fischer
Bob Zarzecki
Ken Moody
Jim Nixon
Doug Sander
RDU Airport Authority
RDU Airport Authority
NC Division of Water Quality
Delta Airport Consultants
Delta Airport Consultants
Delta Airport Consultants
WErLANUS1401(3R0Up
AUG 3 0 2004
Mike Fischer provided a brief introduction to the project and the purpose of the meeting. The
primary purpose of the meeting was to review the current status of the project and to review the
Division of Water Quality's (DWQ) stormwater conditions of Certification No. 3386 dated
August 9, 2002. Ron Jewett added that another reason for the meeting was to get Delta oriented
to the project and with DWQ in order for the design to be completed as efficiently and
expeditiously as possible
Ken Moody gave an overview of the Certification conditions and the conflict with a DWQ letter
dated June 14, 2001. Bob Zaraecki stated that the Certification dated August 9, 2002 supercedes
DWQ letter dated June 14, 2001. Bob Zarzecki did indicate that he recalled working on the June
14, 2001 letter and the installation of a "bypass" system for the existing stormwater as the June
14 letter indicates. He indicated that based on the certification that all stormwater could
discharge into the wetlands if downstream erosion of the wetlands is controlled. He also
indicated that all runoff, including the service road, could be collected in the 72" system if it is
treated and meets the BMP requirements, and that only the runoff from the new impervious must
be treated and not the grassed safety areas. Bob Zarzecki also said that detention would not be
required due to the minimal increased impervious surface.
NC 04080 COOL .MM
Delta Airport Consultants, Inc., P. 0. Box 80036, Raleigh, North Carolina 27623
(919) 840-7604
,)k
Bob Zarzecki indicated that certain conditions of the Certification may be incomplete and the
discrepancy with the June 14, 2001 letter may require a new or updated certification or that it
may only require an administrative revision.
Bob Zarzecki said he would have to meet with John Dorney his supervisor and discuss the issue.
He said he would have a response to the Airport Authority by the end of the week. Since Mike
Fischer was going to be out of town, Ron Jewett asked that any correspondence by sent to him
and that Mike Fischer be copied.
E.
DES:drs
2
NC 04080 COO LMM
Delta Airport Consultants, Inc., P. O. Box 80036, Raleigh, North Carolina 27623
(919) 840-7604