HomeMy WebLinkAbout20201576 Ver 1_Meeting Request Review Doc Attachment_20201027
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
0
0
0
PROFILE (HORIZONTAL)
PROJECT LENGTH
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
1
DESIGN DATAGRAPHIC SCALES PLANS
PROFILE (VERTICAL)
LOCATION:
TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
0
00
7/2/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\Proj\550079_Rdy_tsh.dgnUser:smelvinCONTRACT:TIP PROJECT:ARTMEN
N ASO
H
DEPT
O
F TRA S PORTTIONTATEOFNRTCAR
O
LI
NASee Sheet 1A For Index of Sheets
17BP.14.R.21117BP.14.R.211
17BP.14.R.211
17BP.14.R.211
17BP.14.R.211
N/A
N/A
N/A CONST.
R/W & UTIL.
PE
GRADING, DRAINAGE, PAVING, AND STRUCTURE
OF TRANSPORATION
DEPARTMENTNORTH CAROLINA
Bryson City, NC 28713
345 Toot Hollow Rd
DIVISION 14
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
RIGHT OF WAY DATE:
LETTING DATE:
---
JIMMY L. TERRY, PE
AUSTIN R. TURNER, PE
=0.091
=0.011
=0.080
TOTAL LENGTH PROJECT 17BP.14.R.211 #550079
LENGTH STRUCTURE PROJECT 17BP.14.R.211 #550079
LENGTH ROADWAY PROJECT 17BP.14.R.211 #550079
50 25 50 100
10 10 20
50 25 50 100
ENGINEER
ROADWAY DESIGN
SIGNATURE:
P.E.
P.E.
SIGNATURE:
ENGINEER
HYDRAULICS
T
V
=
=
=
ADT
% *
25
2016
6
* TTST =3%
MPH
FUNC CLASS =
LOCAL - RURAL
SUB REGIONAL TIER
DUAL =3%
VICINITY MAP
-L- STA. 15+84.99
BEGIN BRIDGE
-L- STA. 16+41.01
END BRIDGE
17BP.14.R.211
BEGIN PROJECT
-L- STA. 14+50.00
-L-
SR 1369
4
20+00MACON COUNTY
BRIDGE #550079 OVER TELLICO CREEK
ON SR 1369 (TELLICO RD)
5
90
TELLICO CREEKTELLICO CREEK
TELLICO RD
15+00
CREEK RD
TO RINEHART
MOUNTAIN RDTO BOWERS
M ACON COUNTY
SW AIN COUNTY
Tellico
Creek
Tellico1369
1369
1366
1113 1114
1114Creek
Rattlesnake
1364
1363
1473
1369
Tennessee
Little
28 1133
1131 1132
1133
28
1455
1362
13701364
1369
1372 1370 Ri
ver
1372
14451459
1371
1372
1474
1368
1369
Rinehart
CreekCreek
CoveSugar1369
1367LOCATION
PROJECT
-DR-
-DR- STA. 10+30.00
17BP.14.R.211
END CONSTRUCTION
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 19+30.00
-L- STA. 18+80.00
BEGIN RESURFACING
MARCH 8, 2019RIGHT OF WAY PLANSFINAL PLAN SUBMITTALPROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJPROFESSIONALENGINEERNORTHCAROLINA
SEAL
044158
RAGENEH .J NIMAJN
EBADAM DOCKERY
(
.
1
0
.77
.8
3
Bush
Rd.HickoryCoveMarr
1.7(
River
Need
more
Rd.Licklog
Rd.
Breedlove
Dr.Bull
Hollow
R
d.
Big
Dog Rd.Grady
Estep
Rd.
1.21 .55.62.65.36
1
.67
.801.62
3.01
NCDOT CONTACT:
PLANS PREPARED FOR:PLANS PREPARED BY:
PROJECT ENGINEER
2018 STANDARD SPECIFICATIONS
PROJECT DESIGN ENGINEER NAD 83/ 2011
ENGINEER
SHEET NO.PROJECT REFERENCE NO.
1A 8/22/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\Proj\550079_Rdy_tsh.dgnUser:smelvin8/17/99ROADWAY DESIGN
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
S-1 THRU S- STRUCTURE PLANS
X-1 THRU X- CROSS-SECTIONS
X-1A THRU X-1 CROSS-SECTION SUMMARY SHEET
UO-1 THRU UO- UTILITIES BY OTHERS PLANS
UC-1 THRU UC- UTILITIES CONSTRUCTION PLANS
ITS-1 THRU ITS- ITS PLANS
SIG-1 THRU SIG- SIGNAL PLANS
SIGN-1 THRU SIGN- SIGNING PLANS
RF-1 THRU RF- REFORESTATION PLANS
EC-1 THRU EC- EROSION CONTROL PLANS
E-1 THRU E- ELECTRICAL PLANS
PMP-1 THRU PMP- PAVEMENT MARKING PLANS
TMP-1 THRU TMP- TRAFFIC MANAGEMENT PLANS
4 THRU PLAN AND PROFILE SHEET
3P-1 PARCEL INDEX SHEET
3G-1 THRU 3G- GEOTECHNICAL SUMMARIES
3D-1 THRU 3D- DRAINAGE SUMMARIES
3B-1 THRU 3B- ROADWAY SUMMARIES
2N-1 THRU 2N- NOISE WALL ENVELOPE DETAILS
2H-1 THRU 2H- GEOENVIRONMENTAL DETAILS
2G-1 THRU 2G- GEOTECHNICAL DETAILS
2D-1 THRU 2D- DRAINAGE DETAILS
2C-1 THRU 2C- SPECIAL DETAILS
2B-1 THRU 2B- ROADWAY DETAILS
2A-1 THRU 2A- PAVEMENT SCHEDULE AND TYPICAL SECTIONS
1C-1 THRU 1C- SURVEY CONTROL SHEETS
1B CONVENTIONAL SYMBOLS
1A INDEX OF SHEETS, GENERAL NOTES, AND STANDARD DRAWINGS
1 TITLE SHEET
SHEET NUMBER SHEET
INDEX OF SHEETS
INDEX OF SHEETS GENERAL NOTES STANDARD DRAWINGS
17BP.14.R.211
PROFESSIONAL
E
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT.
RIGHT-OF-WAY MARKERS:
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS.
UTILITY OWNERS ON THIS PROJECT ARE FRONTIER COMMUNICATIONS
UTILITIES:
APPROACHING A BRIDGE.
SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION
THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, AND CROSS-
END BENTS:
WILL BE PAID FOR AT THE CONTRACT PRICE FOR "TEMPORARY SHORING".
SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC NOT SHOWN ON THE PLANS
TEMPORARY SHORING:
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
GUARDRAIL:
LOCATIONS DIRECTED BY THE ENGINEER.
SUBSURFACE DRAINS SHALL BE CONSTRUCTED IN ACCORDANCE WITH STD. NO. 815.02 AT
SUBSURFACE DRAINS:
INVOLVED.
THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS
SUITABLE CONNECTIONS WITH ALL ROADS, STREETS, AND DRIVES ENTERING THIS PROJECT.
THE CONTRACTOR WILL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE
SIDE ROADS:
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01
ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SHOULDER CONSTRUCTION:
SECTIONS.
SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL
STD. NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS.
ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH
SUPERELEVATION:
METHOD II.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
CLEARING:
ENGINEER IN ORDER TO SECURE A PROPER TIE-IN.
ADJUSTED AT THEIR BEGINNING AND ENDING AND AT STRUCTURES AS DIRECTED BY THE
SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. GRADE LINES MAY BE
THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
GRADING AND SURFACING:
GRADE LINE:
REVISED:
EFFECTIVE: 01-16-2018
GENERAL NOTES: 2018 SPECIFICATIONS
S-1 THRU S-42 STRUCTURE PLANS
X-1 THRU X-8 CROSS-SECTIONS
X-1B CROSS-SECTION SUMMARY SHEET
X-1A CROSS-SECTION INDEX SHEET
UO-1 THRU UO-2 UTILITIES BY OTHERS PLANS
RF-1 REFORESTATION DETAIL SHEET
EC-1 THRU EC-5 EROSION CONTROL PLANS
PMP-1 THRU PMP-2 PAVEMENT MARKING PLANS
TMP-1 THRU TMP-5 TRANSPORTATION MANAGEMENT PLANS
4 PLAN AND PROFILE SHEET
OF AGGREGATE SUBGRADE/STABILIZATION
3G-1 SUMMARY OF SUBSURFACE DRAINAGE, AND SUMMARY
LIST OF PIPES, ENDWALLS, ETC(FOR PIPES 48IN & UNDER)
3B-1 EARTHWORK, PAVEMENT REMOVAL, AND GUARDRAIL SUMMARIES &
2G-1 STANDARD TEMPORARY SHORING DETAIL
2C-6 SPECIAL DETAIL - TYPE B-83 SHOP CURVED ANCHOR UNIT
2C-5 SPECIAL DETAIL - TYPE III SHOP CURVED STRUCTURE ANCHOR UNIT
2C-4 SPECIAL DETAIL - A.T.-1 END UNIT ASSEMBLY
2C-3 SPECIAL DETAIL - TYPE III STRUCTURE ANCHOR UNITS
2C-2 SPECIAL DETAIL - GUARDRAIL INSTALLATION - W BEAM RAIL SECTION
2C-1 SPECIAL DETAIL - MODIFIED CONCRETE FLUME
2A-1 PAVEMENT SCHEDULE AND TYPICAL SECTIONS
CONTROL AND PROPERTY TIES
RW-01 THRU RW-__ SURVEY CONTROL, ALIGNMENT CONTROL, RIGHT OF WAY
1B CONVENTIONAL SYMBOLS
1A INDEX OF SHEETS, GENERAL NOTES, AND STANDARD DRAWINGS
1 TITLE SHEET
SHEET NUMBER SHEET
876.02 Guide for Rip Rap at Pipe Outlets
876.01 Rip Rap in Channels
862.04 Anchoring End of Guardrail - B-77 and B-83 Anchor Units
(Special Detail for Type III Anchor Units Sheets 1 of 7 and 2 of 7)
862.03 Structure Anchor Units
862.02 Guardrail Installation (Special Detail for Sheet 6 of 8)
862.01 Guardrail Placement
850.01 Concrete Paved Ditches
846.01 Concrete Curb, Gutter and Curb & Gutter
840.66 Drainage Structure Steps
840.45 Precast Drainage Structure
840.28 Brick Grated Drop Inlet Type 'D' - 12" thru 36" Pipe
840.27 Brick Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
840.25 Anchorage for Frames - Brick or Concrete or Precast
840.22 Frames and Wide Slot Sag Grates
840.19 Concrete Grated Drop Inlet Type 'D' - 12" thru 36" Pipe
840.18 Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
840.00 Concrete Base Pad for Drainage Structures
815.02 Subsurface Drain
DIVISION 8 - INCIDENTALS
654.01 Pavement Repairs
DIVISION 6 - INCIDENTALS
560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method I
DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
422.02 Bridge Approach Fills - Type II Modified Approach Fill
DIVISION 4 - MAJOR STRUCTURES
310.10 Driveway Pipe Construction
300.01 Method of Pipe Installation
DIVISION 3 - PIPE CULVERTS
225.04 Method of Obtaining Superelevation - Two Lane Pavement
225.02 Guide for Grading Subgrade - Secondary and Local
200.02 Method of Clearing - Method II
DIVISION 2 - EARTHWORK
STD.NO. TITLE
applicable to this project and by reference hereby are considered a part of these plans:
Branch - N. C. Department of Transportation - Raleigh, N. C., Dated January, 2018 are
The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design
2018 ROADWAY ENGLISH STANDARD DRAWINGS
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
C
F
Existing Easement Line
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;zvW
K
Proposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}Tp
Q
l
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
WATER:
Water Manhole
Water Meter
Water Valve
Water Hydrant
4
I
H
a
TV:
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
|
I
]
GAS:
Gas Valve
Gas Meter n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
d
o
A/G Water
Above Ground Gas Line
A/G Gas
Above Ground Water Line
Above Ground Sanitary Sewer A/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
?
CONC
CONC WW
vvDrainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Monument
Existing Fence Line
Proposed Woven Wire Fence
Proposed Chain Link Fence
Proposed Barbed Wire Fence
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
W
W
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
*S.U.E. = Subsurface Utility Engineering
WLB
EIP BECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
SHEET NO.PROJECT REFERENCE NO.
1-B17BP.14.R.211
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
E
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
TUE
DUE
AUE
CRProposed Curb Ramp
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
C
A
HPBExisting Historic Property Boundary
U/G Power Line LOS B (S.U.E.*)
U/G Power Line LOS C (S.U.E.*)
U/G Power Line LOS D (S.U.E.*)
P
U/G Telephone Cable LOS B (S.U.E.*)
U/G Telephone Cable LOS C (S.U.E.*)
U/G Telephone Cable LOS D (S.U.E.*)
T
U/G Telephone Conduit LOS B (S.U.E.*)
U/G Telephone Conduit LOS C (S.U.E.*)
U/G Telephone Conduit LOS D (S.U.E.*)
TC
U/G Fiber Optics Cable LOS B (S.U.E.*)
U/G Fiber Optics Cable LOS C (S.U.E.*)
U/G Fiber Optics Cable LOS D (S.U.E.*)
T FO
U/G Water Line LOS B (S.U.E*)
U/G Water Line LOS C (S.U.E*)
U/G Water Line LOS D (S.U.E*)
W
U/G TV Cable LOS B (S.U.E.*)
U/G TV Cable LOS C (S.U.E.*)
U/G TV Cable LOS D (S.U.E.*)
TV
U/G Fiber Optic Cable LOS B (S.U.E.*)
U/G Fiber Optic Cable LOS C (S.U.E.*)
U/G Fiber Optic Cable LOS D (S.U.E.*)
TV FO
U/G Gas Line LOS B (S.U.E.*)
U/G Gas Line LOS C (S.U.E.*)
U/G Gas Line LOS D (S.U.E.*)
G
SS Forced Main Line LOS B (S.U.E.*)
SS Forced Main Line LOS C (S.U.E.*)
SS Forced Main Line LOS D (S.U.E.*)
FSS
Utility Unknown U/G Line LOS B (S.U.E.*)
U/G Test Hole LOS A (S.U.E.*)
STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS
Note: Not to Scale
UST
Contaminated Site: Known or Potential
Known Contamination Area: Soil
Potential Contamination Area: Soil
Known Contamination Area: Water
Potential Contamination Area: Water
Primary Horiz Control Point
Primary Horiz and Vert Control Point
Secondary Horiz and Vert Control Point
Exist Permanent Easment Pin and Cap
New Permanent Easement Pin and Cap
Vertical Benchmark
New Right of Way Line
Concrete or Granite R/W Marker
New Right of Way Line with
Concrete C/A Marker
New Control of Access Line with
New Control of Access
New Temporary Construction Easement
New Temporary Drainage Easement
New Permanent Drainage Easement
New Permanent Drainage / Utility Easement
New Permanent Utility Easement
New Temporary Utility Easement
New Aerial Utility Easement12/2/2016Computed Property Corner
RIGHT OF WAY & PROJECT CONTROL:
New Right of Way Line with Pin and Cap
SHEET NO.PROJECT REFERENCE NO.
ROADWAY DESIGN
ENGINEER ENGINEER
2A-117BP.14.R.211
PAVEMENT DESIGN6/2/998/7/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\Proj\550079_Rdy_typ.dgnUser:smelvinDOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
MIN.
C SURVEY L
C1
E3
C3
MIN.
3"3"
E3
Detail Showing Method of Wedging
PROP. APPROX. 3" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN EACH OF TWO
LAYERS.
C1
P A V E M E N T S C H E D U L E
PROP. APPROX. 4" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT
E1 AN AVERAGE RATE OF 456 LBS. PER SQ. YD.
R1 SHOULDER BERM GUTTER
T EARTH MATERIAL
U
4:1
2:1 MAX
4'-0"
GROUND
EXIST.
GROUND
EXIST.
TYPICAL SECTION NO. 1
USE TYPICAL SECTION NO. 1
TYPICAL SECTION NO. 3
USE TYPICAL SECTION NO. 3
-L- STA. 15+84.99 TO -L- STA. 16+41.01
USE INSET A
C1
T
FT/FT
0.08
1:14'-0"VARIES*
4
:1
2:1 MAXFT/FT
0.02
Exist. Ground
Exist. Ground
**
THIS LINE
GRADE TO
INSET A
7"
ADD 3' FOR GUARDRAIL LOCATIONS
LIMITS FOR ALL OTHER LOCATIONS
ADD MINIMUM 2' PAST PAVED SHOULDER *
INSET B
USE INSET B
E1
SHOWN OTHERWISE ON PLANS.
TO FACE OF GUARDRAIL UNLESS
AT GUARDRAIL LOCATIONS PAVE
NOTE:
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
-L- (SR 1369 - TELLICO RD)
CL
16'-0"
FT/FT0.08
FT
/FT
0
.08
1:
1 1:1GRADE TO THIS LINE
J
C2 C2
8'-0"
GRADE
POINT
TYPICAL SECTION NO. 4
USE TYPICAL SECTION NO. 4
8'-0"
J
-L- STA. 16+37.40 (END APPROACH SLAB) TO -L- STA. 16+57.10 RT
*STA. TO STA.FDPS WIDTH
-L- STA. 14+50.00 TO -L- STA. 15+55.40 (BEGIN APPROACH SLAB) RT
-L- STA. 16+65.79 (END APPROACH SLAB) TO -L- STA. 17+36.52 LT
*
FT/FT
0.02
FT/FT
0.02
4
:1
GROUND
EXIST.
2:1 MAX
2:1 MAXGROUND
EXIST.
2'-0"4'-0"2:1 MAX2:1 MAX
GROUND
EXIST.
GROUND
EXIST.
4:1
2'-0"4'-0"
NOTE: TRANSITION BETWEEN EXISTING AND TYP. SECT. NO.1 AS FOLLOWS:
-L- STA. 18+30.00 TO -L- STA. 18+80.00
-L- STA. 14+50.00 TO -L- STA. 15+00.00
BRIDGE #550079
MACON COUNTY
CL
FT/FT
0.04
FT/FT
0.04
GRADE
POINT
10'-0"
30'-0" OUT TO OUT
10'-0"2:1 MAXExist. Ground
Exist. Ground
4
:1
4'-0"
-DR-
-L- STA. 16+57.10 (END SBG) TO -L- STA. 17+15.35 RT
1.5:1 MAX
0'-0" TO 3'-6"
0'-0" TO 3'-5"
0'-0" TO 3'-3"
0'-0" TO 7'-2"
CL
10'-0"
20'-0"
4:1
2:1 MAX
FT/FT
0.02
3'-0"4'-0"*
GROUND
EXIST.
FT/FT0.08
FT/FT
0.02
FT
/FT
0
.08
GROUND
EXIST.
1:1 1:1GRADE TO THIS LINE
3'-0"*
7"
TYPICAL SECTION NO. 2
USE TYPICAL SECTION NO. 2
-L- STA. 16+41.01 (END BRIDGE) TO 16+80.00
-L- STA. 15+45.00 TO -L- STA. 15+84.99 (BEGIN BRIDGE)
E1
C1
E1
C1
*ADD 3' BEHIND FACE OF GUARDRAIL
10'-0"
GRADE
POINT
-L- (SR 1369 - TELLICO RD) 2:1 MAXExist. Ground
Exist. Ground
4:14'-0"
INSET B
INSET A OR
MATCHLINE
INSET A
MATCHLINE
1.5:1 MAX1.5:1 MAX
U EXISTING PAVEMENT
W VARIABLE DEPTH ASPHALT PAVEMENT (SEE WEDGING DETAILS THIS SHEET)
PAVEMENT EDGE SLOPES ARE 1:1 UNLESS OTHERWISE SHOWN.
CL
GRADE
POINT
10'-0"
20'-0"
FT/FT
0.02
3'-0"
*
*
FT/FT0.08
10'-0"
FT/FT
0.02
FT
/FT
0
.08
1:
1 1:1SEE X-SECTIONS
W
U
GRADE TO THIS LINE GRADE TO THIS LINE
7"
3'-0"*
7"
C1
E1
C1
E1
INSET A
MATCHLINE
ADD 3' BEHIND FACE OF GUARDRAIL
-L- STA. 16+80.00 TO -L- STA. 18+30.00
-L- STA. 15+00.00 TO -L- STA. 15+45.00
-L- (SR 1369 - TELLICO RD)
VARIES 8.7' TO 17.8'
WING WALLS.
IN FRONT OF PROPOSED
GUARDRAIL LOCATIONS
USE 8' POSTS FOR ALL
NOTE:
1:1 MAX2:1 MAXINSET A
MATCHLINE
NO. 1 & 2TYP. SECT.MATCHLINE-DR- STA. 10+55.44 LT TO -L- STA. 15+90.66 LT (BEGIN APPROACH SLAB)
GRADE TO THIS LINE
Exist. Ground
6" AGGREGATE BASE COURSE.J
THAN 5•" IN DEPTH.
BE PLACED IN LAYERS NOT LESS THAN 3" IN DEPTH OR GREATER
AT AN AVERAGE RATE OF 114 LBS. PER SQ. YD. PER 1" DEPTH. TO
PROP. VAR. DEPTH ASPHALT CONCRETE BASE COURSE, TYPE B25.0C,
E3
"2
17
-DR- STA. 10+42.02 TO -DR- STA. 10+81.86
SEE STRUCTURE PLANS FOR GIRDER SIZE AND SPACING
TO 3'-6"
VAR. 3'-0"
PROP. APPROX. 1•" ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 165 LBS. PER SQ. YD. IN ONE LAYER.C2
-DR- STA. 10+30.00 TO -DR- STA. 10+42.02
NOTE: TRANSITION EXISTING TO TYP. SECT. NO.4 AS FOLLOWS:
1'-7" 1'-7"
RAIL
ALASKA
32"
RAIL
ALASKA
32"
TO 3'-10"
VAR. 3'-4"
TYPICAL SECTION NO. 5
USE TYPICAL SECTION NO. 5
-L- STA. 18+80.00 TO -L- STA. 19+30.00
CL -L- (SR 1369 - TELLICO RD)
COURSE, TYPE S9.5B
1.5" CONC. SURFACE
NOTE: NO PROPOSED GRADE
VARIES - SEE PLANS VARIES - SEE PLANS
EXIST
MATCH
EXIST
MATCH RECONSTRUCTION
SHOULDER
RECONSTRUCTION
SHOULDER C2 C2
E2
R1C1
6"
1.5:1 MAX
"2
13'-
11"
ON INSET B
MATCHING THE STATIONS
TYPICAL SECTION NO.2
SHALL BE PLACED UNDER
AN ADDITIONAL LAYER OF 4" B25.0C
NOTE: NO. 2TYP. SECT.MATCHLINEPROP. APPROX. 8" ASPHALT CONCRETE BASE COURSE, TYPE B25.0C, AT
E2 AN AVERAGE RATE OF 456 LBS. PER SQ. YD. IN EACH OF TWO LAYERS.
PROP. VAR. DEPTH ASPHALT CONCRETE SURFACE COURSE, TYPE S9.5B,
AT AN AVERAGE RATE OF 110 LBS. PER SQ. YD. PER 1" DEPTH. TO
BE PLACED IN LAYERS NOT TO EXCEED 1 •" IN DEPTH.
C3 PROFESSIONAL
E
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
E1
APPROACH SLAB
BRIDGE
WATER
FLOW
WATER
FLOW
WATER
FLOW
WATER
FLOW
SAG
FLOW DIVERSION EXAMPLES
DOWN GRADE
CL
DOWEL BARS
(4) 12" #6 DIRECTED BY THE ENGINEER
TRANSITION CURB DOWN ASRALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OFSHEET OF SHEET OFENGLISH DETAIL DRAWING FORENGLISH DETAIL DRAWING FORPLAN VIEW
SEE ROADWAY PLANS
CONCRETE OR RIP-RAP DITCH
RIP-RAP LINED DITCH
SECTION B-B
PAY LIMITS - PER EACH
MODIFIED CONCRETE FLUME
DOWNGRADE OR SAG
WATER
FLOW
SECTION C-C
OR BEGINNING
SEE PLANS FOR PLACEMENT MIN.2’-4"PAVED DITCH
4" CONC.
SECTION A-A
- MODIFICATIONS SHALL BE AS DICTATED BY SITE CONDITIONS AND DIRECTED BY THE ENGINEER.
BY STD. DWG. 876.02 FOR AN 18" PIPE. TRANSITIONS FROM THE DITCH TO TERMINATION SHALL BE AS DIRECTED BY THE ENGINEER.
TERMINATE AS SHOWN ON THE PLANS. IF NO TERMINATION IS INDICATED PLACE RIP-RAP AT THE END OF THE DITCH AS INDICATED
- CONCRETE OR RIP RAP LINED DITCH SHALL BE THE TYPE AND LENGTH SPECIFIED BY THE ROADWAY PLANS. THE DITCH SHALL
- CONSTRUCT RIP RAP LINED DITCH IN ACCORDANCE WITH THIS DETAIL, IF CALLED FOR IN PLANS.
- CONSTRUCT CONCRETE DITCH IN ACCORDANCE WITH STD. DWG. NO. 850.01.
- CONSTRUCT MODIFIED CONCRETE FLUME AND SHOULDER BERM GUTTER IN ACCORDANCE WITH THIS DETAIL.
NOTES:
CONCRETE FLUME
BEGIN MODIFIED
CONCRETE FLUME
END MODIFIED
OPTIONAL SEE RDY. PLANS
SHOULDER BERM GUTTER
OPTIONAL SEE RDY. PLANS
SHOULDER BERM GUTTER
DEPRESSION
PAVED SHOULDER
STRUCTURE1’-0" R.
1 1 1 1
2’-8"
3"2’-0"FLOW DIVERSION
OUTLET
FLOW DIVERSION
OUTLET
FLOW DIVERSION
OUTLET
A
B
C
SEE PLATE FOR TITLE
4’-0"
2’-0"6"4"–WITH CONCRETE OR RIP-RAP DITCHWITH CONCRETE OR RIP-RAP DITCHMODIFIED CONCRETE FLUMEMODIFIED CONCRETE FLUMEOUTLET
B B
A
A
VARIABLE LENGTH
SEE PLANS
C
C
4’-0"
2’-0"6"4"–5"
" RADIUS
4"
2’-4" MIN.8"8"4"
8"8"8"2’-8"
w:details\stand\modifiedflume.dgn
E.E. Ward July 2004
MODFLMDTCH MODFLMDTCH
15’-0"EDGE OF LANE
8" X 4" LIP CURB
E.E. Ward Apr. 2002
SHEET NO .PRO JECT REFERENCE N O .
CHECKED BY:
FILE SPEC.:
DATE:
DATE:
FAX 919-250-4119Office 919-707-6950
DATE:ORIGINAL BY:
MODIFIED BY:
CONTRACT STANDARDS
AND DEVELOPMENT UNIT
$$$$$$SYSTIME$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$USERNAME$$$$17BP.14.R.211 2C-1
AAWOOD OFFSET BLOCKSYSTEM PARTS(FOR WOOD POSTS)STEEL TUBE6"8"7"6'-0"6"8"7"
1'-2"
7"TS 6"x8"x0.1875"LINE POSTSTANDARDBREAKAWAY POSTSHORT WOOD6 86 83'-8ƒ"
1'-8"DIA.ƒ"SLOT2•"xƒ"DIA.2…" ±„"7•"±„"5•"PANEL SPLICEW-BEAM MIDSPAN3'-1•"3'-1•"4‚"4‚"2"12‚"SPLICE BOLT SLOTS" X 1„" (TYP.)3229POST BOLT SLOTSƒ" X 2•" (TYP.)3'-1•"3'-1•"3'-1•"4‚"4‚"2"25'-0"862D02862D02J.HOWERTON 3-7-2018PRO
F
ESSIONALENGINEER NO
R
T
H CAROLINASEAL 022966 NOTREWOH .S LEOJSEE TITLE BLOCKCLCLCLCLCLGUARDRAIL INSTALLATIONGUARDRAIL INSTALLATION3"3"CL5'-0"1"CFRONTSIDEPLANCLCL"W6" STEEL POSTƒ" DIA.1'-3ƒ"8"1'-5"4"6"1„"1„"7"
W6x8.5x6'-0"CLCLCLSIDEPLANƒ"O‚"+ ˆ"FRONTCL1‰"+ ˆ"‡" DIA.OFFSET BLOCKROUTED - 0"2ƒ"+ ‰"
7ˆ"+ ‰" - 0"2‰"+ „"SOIL PLATE2'-0" X 1'-6" ON 6" SIDECENTERED‡" DIA HOLESL Ž" DIA. HOLESŽ" DIA. - ˆ"
7•"+ ‰"STANDARD W-BEAM GUARDRAILSHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:AND DEVELOPMENT UNITCONTRACTS STANDARDSRALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.
DIVISION OF HIGHWAYS
DEPT. OF TRANSPORTATION
NORTH CAROLINA
STATE OFSHEET OFSHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED17BP.14.R.2112C-2
SEE TITLE BLOCKJ HOWERTON 06-22-121 7 1 7
862D03862D03
862D03 862D03
2 7 2 7
SHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:CONTRACT STANDARDSAND DEVELOPMENT UNIT14-DEC-2017 10:36S:\Contracts\Contracts\Special Details\jhowerton\Standard Drawings\2018 Standard Drawings\Details in Lieu of Standards\Division 8\0862d0301.dgnjhowerton AT CSD-292595
PRO
F
ESSIONALENGINEER
NO
R
T
HCAROLINASEALnotrewoH .S leoJ022966DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED1'-10"FINISH GRADECONCRETE BACKWALL FILL FACE
PLAN VIEW
SHOULDER BREAK POINT1'-10"GUARDRAIL POST3 SPACES @ 3'-1•"ELEVATION
`W' BEAM GUARDRAIL
WTR SECTIONSTRUCTURE ANCHOR UNITSSTRUCTURE ANCHOR UNITSOFFSET BLOCKSTD. 6'-3" SPACINGVAR.**STD. 6'-3" SPACING*1" 1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
PAY LIMITS WTR SECTIONAPPROACH SLAB
APPROACH SLAB
CONSTRUCTION JOINT
CONCRETE BACKWALL
AEXP. JOINT
ABRIDGE DECK A
BRIDGE END POST
BRIDGE RAIL SKEWFOR ATTACHMENT TO RAIL ON BRIDGEGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGEGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGE
GUARDRAIL ANCHOR UNIT, TYPE III
MIDSPAN SPLICE3'-1•"3'-1•" -SEE SHEET 3 FOR POST SECTIONS 1 THRU 9. -LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER). -SHOULDER BERM GUTTER MUST BE INSTALLED TO THE LIMITS 8" x 4" LIP CURB IS SHOWN IF ANCHOR UNIT IS NOT ADJACENT TO AN APPROACH SLAB. *THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL IS NOT PRESENT. **POST NOT REQUIRED FOR SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.NOTE:RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OFSHEET OF SHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR1'-10"
FINISH GRADE
CONCRETE BACKWALL
FILL FACE
PLAN VIEW
SHOULDER BREAK POINT
@ 1'-6ƒ"
4 SPACES
1'-10"
GUARDRAIL POST
3 SPACES @ 3'-1•"
ELEVATION
`W' BEAM GUARDRAIL
WTR SECTIONSTRUCTURE ANCHOR UNITSSTRUCTURE ANCHOR UNITSGUARDRAIL
THRIE BEAM
OFFSET BLOCK
STD. 6'-3" SPACING
END SHOE
10 GA
VAR.
1'-6ƒ")
VAR. (MAX.
**
STD. 6'-3" SPACING
GRADE
FINISH
*
1"
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
PAY LIMITS
(ONE RAIL INSIDE ANOTHER)
THRIE BEAM GUARDRAIL 'NESTED'WTR SECTION
APPROACH SLAB
APPROACH SLAB
CONSTRUCTION JOINT
CONCRETE BACKWALL
AEXP. JOINT
ABRIDGE DECK A
BRIDGE END POST
SEE STRUCTURE PLANS
POINT FOR END SHOE ANCHORAGE,
VERTICAL PLANE AT THE ATTACHMENT
BRIDGE RAIL
SEE STRUCTURE PLANS
8" x 4" LIP CURB
SEE STRUCTURE PLANS
8" x 4" LIP CURB
SKEWRAIL ON BRIDGE - SUB REGIONAL TIERGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TORAIL ON BRIDGE - SUB REGIONAL TIER
GUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO RAIL ON BRIDGE - SUB REGIONAL TIERGUARDRAIL ANCHOR UNIT, TYPE III FOR ATTACHMENT TO3'-1•"3'-1•"
3'-1•"
MIDSPAN SPLICE
-SEE SHEET 3 FOR POST SECTIONS 1 THRU 9.
-LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW.
-MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER).
-SHOULDER BERM GUTTER MUST BE INSTALLED TO THE LIMITS 8" x 4" LIP CURB IS SHOWN IF ANCHOR UNIT IS NOT ADJACENT TO AN APPROACH SLAB.
*THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL IS NOT PRESENT.
**POST NOT REQUIRED FOR SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
NOTE:RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OFSHEET OF SHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FOR@ 1'-6ƒ"4 SPACES
GUARDRAIL
THRIE BEAMEND SHOE
10 GA
1'-6ƒ")VAR. (MAX.GRADEFINISH(ONE RAIL INSIDE ANOTHER)THRIE BEAM GUARDRAIL 'NESTED'SEE STRUCTURE PLANSPOINT FOR END SHOE ANCHORAGE,VERTICAL PLANE AT THE ATTACHMENT SEE STRUCTURE PLANS8" x 4" LIP CURBSEE STRUCTURE PLANS8" x 4" LIP CURB1'-9"2'-1"2'-1"
2'-1"2'-1"1'-9"17BP.14.R.2112C-3
BUFFERED END SECTIONRAIL"W" BEAMQTY. 2WITH 2 WASHERSƒ"x7•" BOLTSPAY LIMITS6'-3"STEEL TUBESTD. LINE POSTAND STD. WASHERPOST WITH NUTTHRU RAIL ANDBOLT (10" LONG)BUTTON HEADSTD. WASHERPOST WITH NUT ANDLONG) THRU RAIL ANDBUTTON HEAD BOLT (10"6'-0" POST LENGTH
6'-3"3'-1•"3'-1•"PANEL SPLICEW-BEAM MIDSPAN2'-1"(SEE SHEET 6 OF 8)SHORT WOOD BREAKAWAY POSTTRAILING END UNIT ASSEMBLYELEVATIONPLANPOSTSSTEEL LINEPOSTSSTEEL LINE2'-7"3'-5"A.T.-1 SYSTEMRALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.
DIVISION OF HIGHWAYS
DEPT. OF TRANSPORTATION
NORTH CAROLINA
STATE OFSHEET OFSHEET OFROADWAY DETAIL DRAWING FORROADWAY DETAIL DRAWING FORA.T.-1 SYSTEM3'-4ƒ"
GUARDRAIL INSTALLATIONGUARDRAIL INSTALLATIONLEVELGROUNDSHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:AND DEVELOPMENT UNITCONTRACTS STANDARDSPRO
F
ESSIONALENGINEER NO
R
T
H CAROLINASEAL 022966 NOTREWOH .S LEOJDOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED17BP.14.R.2112C-4
STRUCTURE ANCHOR UNITTYPE III - SHOP CURVEDDIRECTED BY ENGINEERSEE ROADWAY PLANS OR ASSHOP CURVED GUARDRAILSTRUCTURE ANCHOR UNIT
TYPE III - SHOP CURVEDPLAN VIEWEND SHOE10 GAELEVATION(ONE RAIL INSIDE ANOTHER)THRIE BEAM GUARDRAIL 'NESTED'SEE STRUCTURE PLANSPOINT FOR END SHOE ANCHORAGE,VERTICAL PLANE AT THE ATTACHMENT -SEE STANDARD 862.03 SHEET 4 FOR POST SECTIONS 1 THRU 9. -LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW. -USE NO STEEL POSTS WITHIN THE GUARDRAIL ANCHOR UNIT LIMITS. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER). TO AN APPROACH SLAB. -SHOULDER BERM GUTTER MUST BE INSTALLED TO THE LIMITS 8" x 4" LIP CURB IS SHOWN IF ANCHOR UNIT IS NOT ADJACENT IS NOT PRESENT. *THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL **POST NOT REQUIRED FOR SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.NOTE:FOR ATTACHMENT TO RAIL ON BRIDGEGUARDRAIL ANCHOR UNIT, TYPE III - SHOP CURVEDRALEIGH, N.C.DIVISION OF HIGHWAYSDEPT. OF TRANSPORTATIONNORTH CAROLINASTATE OF RALEIGH, N.C.
DIVISION OF HIGHWAYS
DEPT. OF TRANSPORTATION
NORTH CAROLINA
STATE OFSHEET OFSHEET OFENGLISH DETAIL DRAWING FORENGLISH DETAIL DRAWING FORT.S.SpellE.E.Ward2-01-18EOPPAVED SHOULDERADDITIONAL4" x 8" APPROACH SLAB LIP CURBCHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950AND DEVELOPMENT UNITCONTRACT STANDARDSDATE:ORIGINAL BY:MODIFIED BY:5/14/99
SHEET NO.PROJECT REFERENCE NO.01-FEB-2018 09:19S:\Contracts\Contracts\Special Details\jhowerton\Guardrail\31 inch Guardrail\type_iii_sc.dgnjhowerton AT CSD-292595
SKEW1 11 1SEE PLATE FOR TITLE4 SPACES VAR. (MAX. 1'-6ƒ")
S
H
O
UL
DER BREAK PO@ 1'
-6ƒ"TYPE III SCTYPE III SC1'-10"APPROACH SLAB11•"
3
S
P
A
C
ES@
3'-
1•"PAY LIMITS FOR GUARDRAI
L ANCHOR UNI
T,TYPE III
-
SHOP CURVE
D 1'-10"FINISH GRADECONCRETE BACKWALLFILL FACE1'-9"1234567PAY LIMITSWTR SECTIONAPPROACH SLABCONCRETE BACKWALL1" BRIDGE RAIL4-4-02SEE ROADWAY PLANS FOR END TREATMENTSEE PLANSINT
PRO
F
ESSIONALENGINEER
NO
R
T
HCAROLINASEALnotrewoH .S leoJ022966DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETEDSTD. 6'-3" SPACINGGRADEFINISH892'-1"
2'-1"3'-1•"3'-1•"MIDSPAN SPLICE\jhowerton\guardrail\31inguardrail\typeiiisc.dgn17BP.14.R.2112C-5
SECTION A-AENDSHOE10 GA(ONE RAIL INSIDE ANOTHER)12'-6'' 'NESTED' GUARDRAILGUARDRAIL"W" BEAMFROM BRIDGEFIRST SPLICE POINTBRIDGE RAILCONCRETEPLAN VIEW GUARDRAIL"W" BEAMELEVATION VIEWFRONTSIDEPLAN HOLESL Ž" DIA. HOLESŽ" DIA. 7"WOOD OFFSET BLOCK8"X 8"X 14" ROUTEDSIDEFRONTPLANSTEEL POST"W8 X 21 X 8'-0" -LAP JOINTS IN THE DIRECTION OF TRAFFIC FLOW. -USE NO WOOD POSTS WITHIN THE GUARDRAIL ANCHOR UNIT LIMITS. -MEASURE GUARDRAIL HEIGHT FROM THE TOP OF ADJACENT SURFACE (SHOULDER, BERM, OR GUTTER). *THE DISTANCE FROM END OF BRIDGE RAIL TO CENTER LINE OF THE FIRST POST SHOULD BE 11•" IF CONCRETE BACKWALL IS NOT PRESENT. **ELIMINATE POST 3 AND SHIFT POSTS 1 & 2 ON SKEW ANGLES GREATER THAN 150° OR LESS THAN 30° UNLESS OTHERWISE DIRECTED BY THE ENGINEER.NOTE:FOR END TREATMENTSEE ROADWAY PLANSTYPE B-83 SHOP CURVEDGUARDRAIL ANCHOR UNIT19-NOV-2018 08:26S:\Contracts\Contracts\Special Details\ericward\M isc. guardrail\NCHRP350 Approved\b-83 m inndot.dgnjhowerton AT CSD-292595
SHEET NO.PROJECT REFERENCE NO.CHECKED BY:FILE SPEC.:DATE:DATE:FAX 919-250-4119Office 919-707-6950DATE:ORIGINAL BY:MODIFIED BY:AND DEVELOPMENT UNITCONTRACT STANDARDS1'-4ƒ"AA12BRIDGE DECK12'-6'' STANDARD GUARDRAILFILL FACECONCRETE BACKWALLBRIDGE DECKAPPROACH SLABPAY LIMITS*1" A
BRIDGE DECKAAPPROACH SLAB-POSTS 1 AND 2 TO BE W8 x 21 X 8'-0" LONG STEEL POST AND 8" X 8" X 14" WOOD ROUTED OFFSET BLOCK. E.E. WARD7-14-04CCLCL1…"1…"7"CLCLCLƒ"OCLW8 x 21 x 8'-0"‚"7ƒ"1…"2‡"8"8"5‚"8‚"7‚"3**POSTS1 23**5 SPACES@ 1'-6ƒ"3
S
P
AC
E
S @ 3'-1•"
6'-
3"E.E. WARD6-10-022'-1''PRO
F
ESSIONALENGINEER
NO
R
T
HCAROLINASEALnotrewoH .S leoJ022966DOCUMENT NOT CONSIDERED FINALUNLESS ALL SIGNATURES COMPLETED17BP.14.R.2112C-6
--
--
--
--
--
--
--
--
--
--
--
--
--
SHEET PILES H-PILES WITH TIMBER LAGGING
SLOPE OR SURCHARGE CASE WITH NO TRAFFIC IMPACT
----
------
SURCHARGE CASE WITH TRAFFIC IMPACT
< 6
7
8
9
10
11
12
< 6
7
8
9
10
11
12
7.5
8.5
10.0
11.0
12.5
13.5
15.0
11.5
13.0
15.0
17.0
18.5
20.5
22.5
3.0
4.5
6.5
9.5
13.0
17.0
21.5
4.5
7.0
10.0
14.0
19.5
26.0
33.0
HP 10x42
8.0
9.5
10.5
11.5
13.0
HP 12x53
8.0
9.5
10.5
12.0
11.5
13.0
15.0
17.0
HP 14x73
8.0
9.5
10.5
12.0
13.5
14.5
16.0
11.5
13.0
15.0
17.0
18.5
11.0
12.0
12.5
13.5
14.0
15.0
16.0
16.0
17.0
18.0
19.0
20.0
21.0
22.0
10.0
12.0
14.0
16.5
19.5
22.5
25.5
12.0
14.5
17.0
20.0
23.5
28.0
33.0
9.5
10.5
11.5
13.0
14.5
9.5
10.5
11.5
12.5
13.5
13.0
14.5
15.5
17.0
9.5
10.5
11.5
12.5
13.5
14.5
15.5
13.0
14.5
15.5
17.0
18.5
20.0
21.5
HP 10x42 HP 12x53 HP 14x73
SHEET PILES
--
--
--
--
--
--
--
--
--
--
--
--
--
STANDARD TEMPORARY SHORING
NOTES:
TEMPORARY GUARDRAIL
STANDARD TEMPORARY SHORING
BOTTOM OF SHORING
TOP OF SHORING
2:1 (H:V) OR FLATTER
6:1 (H:V) OR FLATTER
OR EXISTING GRADE
BOTTOM OF EXCAVATION
BOTTOM OF SHORING
6:1 (H:V) OR FLATTER
OR EXISTING GRADE
BOTTOM OF EXCAVATION
(SEE NOTE 9)
EXTENSION
MINIMUM REQUIRED
EDGE OF NEAREST TRAFFIC LANE
PILE TIPAND PILE TIPBOTTOM OF SHORINGELEVATION BEWTEENGROUNDWATERPILE TIPELEVATION BELOWGROUNDWATERPILE TIP
CLASS IV SELECT MATERIAL (ABC)
(SEE NOTE 6)
CONDITION
GROUNDWATER
TOP OF SHORING
TRAFFIC SIDE OF SHORING
EMBEDMENTMINIMUM REQUIREDBOTTOM OF SHORING
6:1 (H:V) OR FLATTER
OR EXISTING GRADE
BOTTOM OF EXCAVATION
(SEE NOTE 9)
EXTENSION
MINIMUM REQUIRED
PILE TIP
MIN
24"
AND TRAFFIC CONTROL PLANS)
CLEAR DISTANCE (SEE NOTE 7
TRAFFIC SIDE OF SHORING
PAVEMENT SECTION
EDGE OF PAVEMENT
**TOP OF SHORING =
EDGE OF PAVEMENT
**GUARDRAIL FACE =
6" MIN
EXTENSION
TRAFFIC LANE
EDGE OF NEAREST
H-PILES WITH TIMBER LAGGING
**
TOP OF SHORING**
FACE
GUARDRAIL
(SEE NOTE 8)
CLEAR DISTANCE
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
3
WITH TIMBER LAGGING
SHEET PILES OR H-PILES
*SEE TABLE ABOVE.
(SURCHARGE CASE)VARIES - 12' MAXH - SHORING HEIGHTVARIES - 12' MAXH - SHORING HEIGHTVARIES - 12' MAXH - SHORING HEIGHT*SEE TABLE ABOVE.
(SLOPE CASE)
MINIMUM REQUIRED EMBEDMENT AND SECTION MODULUS
(FT)
HEIGHT
SHORING
H
(FT)
EMBEDMENT
REQUIRED
MINIMUM
(IN /FT)
SECTION MODULUS
MINIMUM REQUIRED
(FT)
EMBEDMENT
REQUIRED
MINIMUM
*WITH TIMBER LAGGING
SHEET PILES OR H-PILES
*
WITH TIMBER LAGGING
SHEET PILES OR H-PILES
**EMBEDMENTMINIMUM REQUIRED*EMBEDMENTMINIMUM REQUIRED***
(SEE NOTE 10)
(FT)
MINIMUM REQUIRED EMBEDMENT
(SEE NOTE 10)
(FT)
MINIMUM REQUIRED EMBEDMENT
3(IN /FT)
SECTION MODULUS
MINIMUM REQUIRED
STANDARD SHORING PROVISION)
(SEE PLANS AND
TEMPORARY GUARDRAIL
MIN
24"
PAVEMENT SECTION
STANDARD SHORING PROVISION)
(SEE PLANS AND
CONCRETE BARRIER
CONCRETE BARRIER
". --SIZE SHOWN IF MINIMUM REQUIRED EMBEDMENT IS "
GROUNDWATER CONDITION, SHORING HEIGHT AND H-PILE
*DO NOT USE H-PILES WITH TIMBER LAGGING FOR
DEPART
ME
NT
OF TRANSPORTATIONSTATE OF NORT
H CAR
O
L
I
NATEMPORARY SHORING
STANDARD
DIVISION OF HIGHWAYS
DEPARTMENT OF TRANSPORTATION
NORTH CAROLINA
ENGINEERING UNIT
GEOTECHNICAL
STANDARD DETAIL NO. 1801.01
DATE: 11-19-13
PROJECT REFERENCE NO.
17BP.14.R.211 2G-1
ENGINEER
SIGNATURE DATE
SHEET NO.
ENGINEER
GEOTECHNICAL
SIGNATURE DATE
29869PROFESSIONALE
NG INEERNORTHCAROLINA
SEAL
KRALC C ENAHS
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
f
g
CONTACT THE ENGINEER IF PILES DO NOT ATTAIN THE MINIMUM REQUIRED EMBEDMENT.
connect.ncdot.gov/resources/Geological/Pages/Geotech_Forms_Details.aspx
STANDARD SHORING SELECTION FORMS ARE AVAILABLE FROM:
TEMPORARY SHORING CONSTRUCTION. UP TO 3 SHORING LOCATIONS MAY BE INCLUDED ON EACH FORM.
SUBMIT A "STANDARD TEMPORARY SHORING SELECTION FORM" AT LEAST 7 DAYS BEFORE STARTING
DRILLED-IN H-PILES.
MAXIMUM 6' SPACING. AT THE CONTRACTOR'S OPTION, EMBEDMENT DEPTHS MAY BE REDUCED BY 25% FOR
MINIMUM REQUIRED EMBEDMENT FOR H-PILES WITH TIMBER LAGGING IS BASED ON DRIVEN H-PILES AT
FOR "SURCHARGE CASE WITH TRAFFIC IMPACT".
MINIMUM REQUIRED EXTENSION IS 6" FOR "SLOPE OR SURCHARGE CASE WITH NO TRAFFIC IMPACT" AND 32"
CASE WITH TRAFFIC IMPACT".
GUARDRAIL, ATTACH GUARDRAIL TO TRAFFIC SIDE OF PILES AS SHOWN IN THE PLANS AND USE "SURCHARGE
AT THE CONTRACTOR'S OPTION OR IF AVAILABLE CLEAR DISTANCE IS LESS THAN 4' FOR TEMPORARY
"SURCHARGE CASE WITH TRAFFIC IMPACT".
FOR CONCRETE BARRIER, SET BARRIER NEXT TO AND UP AGAINST TRAFFIC SIDE OF PILES AND USE
AT THE CONTRACTOR'S OPTION OR IF AVAILABLE CLEAR DISTANCE IS LESS THAN THE MINIMUM REQUIRED
CONDITION. DO NOT USE STANDARD TEMPORARY SHORING IF GROUNDWATER IS ABOVE BOTTOM OF SHORING.
PLANS, USE "GROUNDWATER ELEVATION BETWEEN BOTTOM OF SHORING AND PILE TIP" FOR GROUNDWATER
USE GROUNDWATER ELEVATION NOTED IN THE PLANS. IF NO GROUNDWATER ELEVATION IS SHOWN IN THE
OR SOFT SOIL OR MUCK IS WITHIN THE EMBEDMENT DEPTH.
DO NOT USE STANDARD TEMPORARY SHORING WHEN VERY LOOSE
PARAMETERS ARE NOT APPLICABLE.
DO NOT USE STANDARD TEMPORARY SHORING IF ASSUMED SOIL
COHESION, c = 0 PSF
= 30 DEGREESFRICTION ANGLE,
= 120 PCFUNIT WEIGHT,
IN-SITU ASSUMED SOIL PARAMETERS:
STANDARD TEMPORARY SHORING IS BASED ON THE FOLLOWING
PROVISION.
FOR STANDARD TEMPORARY SHORING, SEE STANDARD SHORING
SHORING AS NOTED IN THE PLANS.
AT THE CONTRACTOR'S OPTION, USE STANDARD TEMPORARY
250 PSF MAX
TRAFFIC SURCHARGE
250 PSF MAX
TRAFFIC SURCHARGE
COMPUTED BY: SGM DATE:6/28/2019SHEET NO. CHECKED BY: JLT DATE:8/6/20193B-1LOCATIONStation Station Uncl. Embank. Borrow WasteStation Station LT/RT/CL REMOVAL REMOVALExcav. +%‐L‐ 14+50.00‐L‐ 15+84.9956257‐DR‐ 10+30.00‐DR‐10+81.861 138 137BRIDGE‐L‐ 16+41.01‐L‐ 19+30.00495 60 56 491501 260 250 491501 260 250 491SAY:520 260EST. SHALLOW UNDERCUT = 100 CYSELECT GRANULAR MATERIAL = 400 CYGEOTEXTILE FOR SOIL STABILIZATION = 700 SYCLASS IV SUBGRADE STABILIZATION = 200 TONNG = NON-GATING IMPACT ATTENUATOR TYPE 350"N" DIST.TOTALFLAIR LENGTHLINEFROM SHLDR APPR.TRAIL.APPR. TRAIL.E.O.L.WIDTHENDENDENDENDEAGNG‐L‐‐L‐‐L‐‐L‐ADDITIONAL GUARDRAIL POSTS = 5 EA‐L‐Note: Invert Elevations indicated are for Bid Purposes only and shall not be used for project construction stakeout. COMPUTED BY: BJH DATE: 10/31/2018 See "Standard Specifications For Roads and Structures, Section 300-5". CHECKED BY: BJH DATE: 8/7/2019SIZETHICKNESSOR GAUGEEFG‐DR‐ 10+48 LT 04010401 0402 2015.0 2009.240‐L‐ 15+58 LT 0402 2011.41110402 0403 2009.5 2008.596‐L‐ 14+66 LT 0403 2011.21110403 0404 2008.2 2008.0 0.54022‐L‐ 16+52 RT 04051‐L‐ 19+14 CL 0406280406 0407 2001.7 1999.728TOTALS409640 28 2 112122 28 FILL EXIST. 18" CSP REMOVE EXIST. 18" CSP2 FLOWABLE FILL, C.Y.WASTE IN LIEU OF BORROWSAY62.502SUB‐TOTALSGRAND‐TOTALS (TEMP) 62.50112.50TEMP. GREU TL‐2 2@25.00 ft 50.00TEMPORARY GUARDRAILLESS ANCHOR DEDUCTIONS Temporary Guardrail and Anchors215+65+/‐16+77+/‐LT112.502 Temporary Guardrail and Anchors112.5050.00123111ANCHOR TOTALS75.00GREU TL‐2 3@25.00 ft18.75SAY56.2543.75GRAND‐TOTALS 23111VariesR=10'6'25' 0.5'116' 1 116+55.07 17+11.32 LT 56.25 16+55.07 3'25' 0.5GRAND TOTALS:STATE OF NORTH CAROLINAEND STA.15+70.14LOC.17BP.14.R.211TOTALS:50.00 37.50‐DR‐ 10+92.001BEG. STA.TRAIL. ENDDOUBLE FACEDWARRANT POINTAPPR. ENDLENGTHSTRAIGHT16+27.37LESS ANCHOR DEDUCTIONSLT 37.502@18.75 ft15+70.14 6.00'TYPE III15+98.1715+98.1716+27.37 16+83.62 RT 56.25TYPE III SC 1@18.75 ftAT‐1 1@6.25 ft 6.25B‐83 SC 1@25.00 ft 25.00R.C.P.C.S.P.5.0' THRU 10.0'***" RC PIPE CULVERTS, CONTRACTOR DESIGNSTD. 838.01838.11 ORSTD. 838.80(UNLESS NOTEDOTHERWISE) G.D.I. TYPE "D" STD. 840.19 OR STD. 840.28 ** " R.C. PIPE (CLASS V)***" RC PIPE CULVERTS, CONTRACTOR DESIGNCONCRETE TRANSITIONALSECTION10.0' AND ABOVETYPE OF GRATE G.D.I. TYPE "B" STD. 840.18 OR STD. 840.27 G.D.I. (W.S. SAG) FRAME W/ 2 GRATES STD. 840.22C.B.N.D.I.D.I.G.D.I.G.D.I.(N.S.)J.B.M.H.T.B.D.I.T.B.J.B.18" SIDE DRAIN PIPEENDWALLS48''PROJECT NO.REMARKSWIIIGREUTL-2AT‐1ANCHORSREMOVE & RESET EXISTING GUARDRAILREMARKSABBREVIATIONS R.C. PIPE CLASS IVR=87', Extra Depth Guardrail Posts in Front of Wingwalls (15 EA)42''15''LOCATION (LT, RT, OR CL)'30'' 36''.064.064.06424'' 48''42''.064.07948'' 12'' 15'' 18''.10912'' 15'' 18'' 24'' 30''FROMTOTOP ELEVATIONINVERT ELEVATIONINVERT ELEVATIONSLOPE CRITICAL C.S. PIPE 36'' 42''DRAINAGE PIPE(RCP, CSP, CAAP, HDPE, or PVC)DO NOT USE RCPDO NOT USE CSPDO NOT USE CAAPDO NOT USE HDPE.079.10912'' 15''31142'' 48'' 12''18'' 24'' 30'' 18'' 24'' 30'' 36''LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48 INCHES & UNDER)STATIONSTRUCTURE NO.CATCH BASINNARROW DROP INLETDROP INLETGRATED DROP INLET(NARROW SLOT)JUNCTION BOXMANHOLETRAFFIC BEARING DROP INLETTRAFFIC BEARING JUNCTION BOXPER EACH (0' THRU 5.0')LIN.FT.DROP INLETCATCH BASIN R.C. PIPE CLASS III MODIFIED CONC. FLUME, SEE DETAIL SHEET 2C-136''15" SIDE DRAIN PIPEQUANTITIESFOR DRAINAGESTRUCTURES*TOTAL L.F. FOR PAYQUANTITY SHALL BE COL.'A' + (1.3 X COL.'B')C.B. STD. 840.01 OR STD. 840.02FRAME, GRATES,AND HOODSTANDARD 840.03PIPE REMOVAL LIN. FT.CU. YARDSABSUMMARY OF EARTHWORK50.0037.50"N" = DISTANCE FROM EDGE OF LANE TO FACE OF GUARDRAILTOTAL SHOULDER WIDTH = DISTANCE FROM EDGE OF TRAVEL LANE TO SHOULDER BREAK POINT. FLARE LENGTH = DISTANCE FROM LAST SECTION OF PARALLEL GUARDRAIL TO END OF GUARDRAIL.W = TOTAL WIDTH OF FLARE FROM BEGINNING OF TAPER TO END OF GUARDRAIL.G = GATING IMPACT ATTENUATOR TYPE 350IN CUBIC YARDSSHOP CURVEDSUB‐TOTALSNote: Approximate quantities only. Unclassified Excavation, Borrow Excavation, Fine Grading, Clearing and Grubbing, and Removal of Existing Pavement will be paid for at the contract lump sum price for grading.87.53.00'50.0014+70.14 RT162.50GUARDRAIL SUMMARYIN FEETPER GEOTECH RECOMMENDATION, ESTIMATED 450 CUBIC YARDS OF UNDERCUT TO BE USED IN THE DISCRETION OF THE RESIDENT ENGINEER.B-83REMOVE EXISTING GUARDRAIL25'3'20.5'IIISC111IMP. ATTEN. TYPE 350SCLT 82.94LT 112.5615+3816+80 18+36Note: Earthwork quantities are calculated by the Roadway Design Unit. These earthwork quantities are based in part on subsurface data provided by the Geotechnical Engineering Unit.SAY:260TOTAL:253.35CONCRETEPAVEMENT REMOVAL SUMMARYIN SQUARE YARDS‐L‐16+38 16+80LT 57.85‐L‐SURVEY ASPHALT ASPHALT CONCRETELINEBREAKUP BREAKUP‐L‐16+11
COMPUTED BY: DMM__________ DATE: 1/24/2019___ CHECKED BY: JCK___________ DATE: 1/24/2019_SD 200100 200 400TOTAL LF:200TOTAL CY/TONS/SY:100 200** 400** 0 0*UD = Underdrain*BD = Blind Drain*ASU(1/2) = Aggregate Subgrade (Type 1 or 2)*SD = Subsurface Drain*AST = Aggregate Stabilization(5-15-18)STATE OF NORTH CAROLINADIVISION OF HIGHWAYSLINE3G-1SHEET NO.PROJECT NO.17BP.14.R.211Stabilizer Aggregate TONSClass IV Aggregate Stabilization TONSClass IV Subgrade Stabilization TONSSUMMARY OF SUBSURFACE DRAINAGECONTINGENCYSUMMARY OF AGGREGATE SUBGRADE/STABILIZATIONCONTINGENCYStationLINE Station StationLocation LT/RT/CLDrain Type* UD/BD/SDLFGeotextile for Soil Stabilization SYAggregate Type* ASU(1/2)/ASTStation**Total tons of "Class IV Subgrade Stabilization" and total square yards of "Geotextile for Soil Stabilization" are only the estimated quantities for ASU(1/2)/AST and may only represent a portion of the subgrade stabilization and geotextile quantities shown in the Item Sheets of the Proposal.Aggregate Thickness INCHES[8" for ASU(2)]Shallow Undercut CY
14 15 16 17 18 19 20
2,010
2,020
2,030
2,040
2,050REVISIONS
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
4
R/W SHEET NO.8/17/998/22/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\Proj\550079_Rdy_psh.dgnUser:smelvinCORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
BRIDGE/ROADWAY RELATIONSHIP SKETCH
-L- STA 15+74.40
BEGIN APPROACH SLAB
-L- STA 16+51.60
END APPROACH SLAB
04OUTOUT TO 30'-0"10'10'VAR. 3'-4"
TO 3'-6"
SBG
PROP.
BRIDGE #550079
MACON COUNTY 17BP.14.R.211
2,050
2,040
2,030
2,020
2,010
2,000
1,990
1,980
1,970
TYPE-III
TYPE-III
FDPS
PROP.
FDPS
PROP.
FDPS
PROP.
-DR-2,000
2,020
2,030
10 11
2,010
PAVEMENT REMOVAL
VAR. 3'-0"
NOTE: ALL DRIVE RADII ARE 10', UNLESS OTHERWISE NOTED.
1'-7"
1'-7"
TO 3'-10"ROADWAYCLEAR26'-10"BRIDGE HYDRAULIC DATA
DESIGN DISCHARGE
DESIGN FREQUENCY
DESIGN HW ELEVATION
BASE DISCHARGE
BASE FREQUENCY
BASE HW ELEVATION
OVERTOPPING DISCHARGE
OVERTOPPING FREQUENCY
OVERTOPPING ELEVATION
APPROX. W.S. ELEVATION
=
=
=
=
=
=
=
=
=
=
1200 CFS
5 YR*
2009.2 FT
3100 CFS
100 YR
2014.4 FT
1600 CFS
10 YR +/-
2010.1 FT
DATE OF SITE VISIT
ON DATE OF SITE VISIT
LEVEL OF SERVICE
*PROP. BRIDGE IMPROVES
= 03/07/18
2003.5 FT
NAD 83/ 2011
R=87'
SC
TYPE-III
TYPE-B83 SC R=10'
FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-42 PROFESSION
A
LE
NG INE ER
N ORTH CARO
LINA
SEAL
35018 YRRET .L YMMIJPROFESSIONALENGINEER
N ORTH CARO
LINA
SEAL
044158
RAGENEH .J NIMAJN
EB
9.0'
8.8'
0102
10'10'
-L- STA 14+50.00
17BP.14.R.211
BEGIN PROJECT
9.0'8.8'00044027006
0102
0001
02 04010302020410+0015+00
0
3 02030401000102-L- PC 15+14.78
-L- PRC 15+84.41
-L- PRC 17+83.74
-L- PT 18+68.72
-L- PT 13+52.31
-L- PC 12+38.68
-L- PC 10+00.00
-L- PT 12+29.58
-L- PCC 10+86.17
-L- POC 20+62.87
-L- PC 19+72.77
-L- STA 15+84.99
BEGIN BRIDGE
-L- STA 16+41.01
END BRIDGE +30REPAT '05 .TSIXE OT10'10'
TYP.
15'+50.4515'
TYP.+85+00REPAT '05 .TSIXE OT
-L- STA. 17+36.52
END FDPS
8:1
8:1
-L- STA. 17+15.35
END FDPS
8:1
-L- STA. 14+50.00
BEGIN FDPS0201
00
GRAVEL DRIVE
PROP.
1
2
-DR- POT 10+00.00
B23
B1
PROP. ASPHALT DRIVE
-DR-16'15'TYP.+65
10'TYP.+56.86OF PROPOSED WING WALL
FOR ALL AREAS IN FRONT
USE 8' GUARDRAIL POSTS
REMOVE EXIST. BRIDGE
-DR- STA 10+30.00
17BP.14.R.211
END CONSTRUCTION
-L- STA. 16+37.40
BEGIN SBG
-L- STA. 18+80.00
BEGIN RESURFACING
-L- STA 19+30.00
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 16+57.10
END SBG
PI Sta 10+71.83
D
L = 50.55'
T = 39.90'
R = 25.00'
-DR- CURVE DATA
1 -DR- PC 10+31.93
2 -DR- PT 10+82.49
= -L- POC 15+72.49
3 -DR- POT 10+91.88
PI Sta 10+43.55
D
L = 86.17'
T = 43.55'
R = 241.00'
PI Sta 11+61.69
D
L = 143.41'
T = 75.53'
R = 185.00'
PI Sta 12+95.54
D
L = 113.64'
T = 56.86'
R = 1,200.00'
PI Sta 15+51.08
D
L = 69.63'
T = 36.29'
R = 100.00'
PI Sta 16+84.53
D
L = 199.32'
T = 100.12'
R = 850.00'
PI Sta 18+26.27
D
L = 84.98'
T = 42.53'
R = 800.00'
PI Sta 20+17.84
D
L = 90.10'
T = 45.07'
R = 1,125.00'
-L- CURVE DATA
SE = 0.04
DS = 20 MPH
DS = 15 MPH DS = 15 MPH
SE = NCSE = NC
GREU TL-2
GREU TL-2
GREU TL-2
GREU TL-2
T WL
12" C
MP 18" CMP8
" CMP
12" CMPWALL STN WALL
STN WALL
EXI
STI
NG R/WEXI
STI
NG R/W60.00'
EXISTING R/W
SR 1369 (TELLI
CO RD)18' PAVED ROADWAY50.00'DECKWALL
EXISTING R/W
GR
TELLICO CREEK
BM#2
SEP PUMP
STEPS
1STFD
DECK
CONC
BL-2
DB N-35 PG 872
SHEILA ANN POSEY
DB Q-11 PG 196
BETTY JANE BREEDLOVE
FRANKLIN MARSHALL BRADEY
DB Y-37 PG 2330
JOSEPH R MARSH JR
DB Q-22 PG 287
TT
BST
18' PAVED ROADWAYSR 1369 (TELLICO RD)
BRK WALK
BRK WALK
COLUMN
BST
TELLICO CREEK
BL-1
TERRY E HALL
DB C-21 PG 1455
BM#1 18" CMPGR
GR
PI = 15+00.00
EL = 2,012.57'
(-)0.6600%(-)0.4360%
VC = 100'PI = 17+50.00
EL = 2,011.48'
(-)0.4360%(-)4
.
8
0
0
0%
VC = 170'
DS = 80 MPH
-L- STA. 15+84.99
BEGIN BRIDGE -L- STA. 16+41.01
END BRIDGE
DS = 35 MPH
K = 39
ELEV. 2012.90
-L- STA. 14+50.00
BEGIN GRADE
K = 446
SITE VISIT (03/07/18)= 2003.5'
APPROX. W.S. ELEV. ON DATE OF
ELEV. 2005.24
-L- STA. 18+80.00
BEGIN RESURFACING
END GRADE
-L- STA. 19+30.00
END RESURFACING
50'-0"
TO BE ROMOVED
EXIST. BRIDGE
PROP. GRADE
EX. GRADE
SHEET-PILES (TYP.)
H-PILES (TYP.)
TO ELEV. 2003.6'+/-
PROP. EXCAVATION
TO ELEV. 2003.9'+/-
PROP. EXCAVATION
LOW CHORD
LOW SIDE
GREU TL-2
ELEV. 2020.46
-DR- STA. 10+30.00
BEGIN GRADE
K = 1
VC = 10'
PI = 10+75.00
EL = 2,013.23'
(-)16.0694
%(-
)8.0000%ELEV. 2012.63
= -L- STA. 15+78.08 (10'LT)
-DR- STA. 10+81.86
END GRADE
EX R/W
+50.00
01
02
03
58.00'
+53.00
EX R/W
+68.72
65.00'
+55.00
77.00'
+93.00
EX R/W
+13.00
30.00'
+14.78
55.00'
+40.00
30.00'
+40.00
30.00'
+83.74
EX R/W
+04.03
30.00'
+50.00
30.00'
+84.41
30.00'
+16.00
30.00'
+14.78
EX R/W
+88.80EX R/W
+61.68
30.00'
EX R/W
69.00'
+05.00
EX R/W
+50.00
30.00'
+50.00
40.00'
+50.00
30.00'
+80.00
40.00'
+80.00
SEE DETAIL SHEET 2C-1
MODIFIED CONC. FLUME
0406
0407
0403
0404
0402
0401
2GI
2GI-D
12" CSP
18" RCP-III
FILL
FLOWABLE REMOVE0405
( Not to Scale)
RIP RAP AT EMBANKMENT
-L- STA. 14+66 RT
DETAIL 1
1.5'PIPE
PROP.
Type of Liner= CLASS 'I' RIP-RAP
BED
STREAM
18" RCP-IV
DETAIL 2
( Not to Scale)
4"
12"
E
XIST.
4:1GROUNDNATURAL
PROP. ROADWAY
CONCRETE DITCH
FROM -L- 14+50 STA. TO STA. 15+60 RT
DITCH
CONC.
STAKE
SLOPE
PROP.
SEE DETAIL 2
CONC. DITCH
15" RCP-III
EST. 4 TONS
CLASS 'I' RIP-RAP
SEE DETAIL 1
RIP-RAP AT EMBANKMENT
EST. 10 SY
GEOTEXTILE
EST. 3 TONS
CLASS 'B' RIP-RAP
EST. 10 SY
GEOTEXTILE
EST. 4 TONS
CLASS 'I' RIP-RAP
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS TMP-1
SHEET NO.User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_01(TSH).dgn7/1/2019INDEX OF SHEETS
SHEET NO.TITLE
TRANSPORTATION MANAGEMENT PLAN
WORK ZONE SAFETY & M OBILITY
ONFOETATS
DEPARTMENT
OF TRANSPORTATIONANIL
ORACHTR
NFO
ETATSDEP
ART
ME
N
TOFRATNSPOR TATIONANILORA
C
HTRO
"from the M OUNTAINS to the COAST"
DEPARTE
N
OF ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
PLAN PREPARED FOR N.C.D.O.T. BY:
PROJECT ENGINEER
DESIGN ENGINEER PROJECT:LOCATION
PROJECT
VICINITY MAP
APPROVED:
DATE:
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS 17BP.14.R.211%19
74
1369
1310
1409
SWAIN COUNTY
MACON COUNTY
MACON COUNTY
JIMMY TERRY, PE
SANDRA MELVIN
28(
28(
%19
74
%19
74
%19
74
TMP-5 PHASE III
TMP-4 PHASE II
TMP-3 PHASE I
TMP-2 PHASING
STRATEGIES, GENERAL NOTES, AND LOCAL NOTES)
TMP-1B TRANSPORTATION OPERATIONS PLAN: (MANAGEMENT
AND LEGEND
TMP-1A LIST OF APPLICABLE ROADWAY STANDARD DRAWINGS,
TMP-1 TITLE SHEET, VICINITY MAP, AND INDEX OF SHEETS
PRO FESSIO
NA
L
E
NG INE ERNORTHCAROLI
NA
SEAL
35018
YRRET .L YMMIJ
Little
River Te
n
nessee
Cold
Beechertown
Fairview
Briertown
Stiles
Tellic
Nantahala
Wesser
Almonds
Needmore
Lauada
SOUTHERN
Southern
Railway
Sout
her
nDock
Alarky
R155
Elev 3,306
POTATO HILL
NCDOT CONTACT INFORMATION:
Phone: 828 488 0902 Fax: 828 488 3518
Division Bridge Program Manager
ADAM DOCKERY
SHEET NO.PROJ. REFERENCE NO.User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_01A(STA & Legend).dgn7/1/2019TMP-1A
LEGENDROADWAY STANDARD DRAWINGS
TITLESTD. NO.
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.,
FLAGGER
TRAFFIC CONTROL DEVICES
CONE
DRUM
STATIONARY SIGN
PORTABLE SIGN
CHANGEABLE MESSAGE SIGN
STATIONARY OR PORTABLE SIGN
SKINNY DRUM
BARRICADE (TYPE III)
TEMPORARY SIGNING
SIGNALS
PAVEMENT MARKERS
CRYSTAL/CRYSTAL
CRYSTAL/RED
YELLOW/YELLOW
PAVEMENT MARKINGS
E
M
P
T
LAW ENFORCEMENT
TEMPORARY CRASH CUSHION
PAVEMENT MARKING SYMBOLS
EXISTING LINES
TEMPORARY LINES
PAVEMENT MARKING SYMBOLS
EXISTING PROPOSED TEMPORARY
DIRECTION OF TRAFFIC FLOW
NORTH ARROW
GENERAL
EXIST. PVMT.
PROPOSED PVMT.
DIRECTION OF PEDESTRIAN TRAFFIC FLOW
TUBULAR MARKER
REMOVAL
WORK AREA
THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" -
ARE CONSIDERED A PART OF THESE PLANS:
DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY
FLASHING ARROW BOARD
TRUCK MOUNTED ATTENUATOR (TMA)
TEMP. SHORING (LOCATION PURPOSES ONLY)
E
M
P
T
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
DRAWINGS & LEGEND
ROADWAY STANDARD
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
17BP.14.R.211Bridge #550079
Macon County
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
1205.12 PAVEMENT MARKINGS - BRIDGES
1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
1262.01 GUARDRAIL END DELINEATION
1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI-LANE ROADWAYS
1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
1160.01 TEMPORARY CRASH CUSHION
1150.01 FLAGGING DEVICES
1145.01 BARRICADES
1135.01 CONES
1130.01 DRUM
1110.02 PORTABLE WORK ZONE SIGNS
1110.01 STATIONARY WORK ZONE SIGNS
1101.11 TRAFFIC CONTROL DESIGN TABLES
1101.04 TEMPORARY SHOULDER CLOSURES
1101.03 TEMPORARY ROAD CLOSURES
1101.02 TEMPORARY LANE CLOSURES
1101.01 WORK ZONE ADVANCE WARNING SIGNS
1170.01 POSITIVE PROTECTION
1180.01 SKINNY-DRUM
TMP-1B
PLAN
OPERATIONS
TRANSPORTATION
STRATEGIES
MANAGEMENT
GENERAL NOTES
LOCAL NOTES
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
17BP.14.R.211Bridge #550079
Macon County
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_01B(TOP).dgn7/1/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
SHEET NO.PROJ. REFERENCE NO.
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
MARKERS BY THE END OF EACH DAY'S OPERATION.
S) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND
LINES.
R) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING
Q) INSTALL PAVEMENT MARKINGS AND PAVEMENT MARKERS ON THE FINAL SURFACE.
PAVEMENT MARKINGS AND MARKERS
ATTACHED, OF SUFFICIENT LENGTH TO CLOSE ENTIRE ROADWAY.
P) PLACE TYPE III BARRICADES, WITH "ROAD CLOSED" SIGN R11-2
REQUIREMENTS.
1130 (DRUMS), 1135 (CONES) AND 1180 (SKINNY DRUMS) FOR ADDITIONAL
REFER TO STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES SECTIONS
10 FT ON-CENTER IN RADII, AND 3 FT OFF THE EDGE OF AN OPEN TRAVELWAY.
AREAS NO GREATER IN FEET THAN TWICE THE POSTED SPEED LIMIT (MPH) EXCEPT,
O) WHEN LANE CLOSURES ARE NOT IN EFFECT SPACE CHANNELIZING DEVICES IN WORK
TRAFFIC CONTROL DEVICES
60 MPH or HIGHER 30 FT
55 25 FT
45 - 50 20 FT
40 OR LESS 15 FT
POSTED SPEED LIMIT MINIMUM OFFSET
OR AS SHOWN IN THE PLANS: (SEE ALSO 1101.05)
CONCRETE BARRIER IS OFFSET FROM ONCOMING TRAFFIC AS FOLLOWS
CRASH CUSHION UNLESS THE APPROACH END OF MOVABLE/PORTABLE
BARRIER FROM ONCOMING TRAFFIC AT ALL TIMES BY A TEMPORARY
PROTECT THE APPROACH END OF MOVABLE/PORTABLE CONCRETE
TEMPORARY CRASH CUSHION.
EITHER A TRUCK MOUNTED ATTENUATOR (MAXIMUM 72 HOURS) OR A
ALL TIMES DURING THE INSTALLATION AND REMOVAL OF THE BARRIER BY
N) PROTECT THE APPROACH END OF MOVABLE/PORTABLE CONCRETE BARRIER AT
TEMPORARY BARRIER IS REMOVED.
UNTIL THE TEMPORARY BARRIER CAN BE PLACED OR AFTER THE
LIMIT (MPH) TO CLOSE OR KEEP THE SECTION OF THE ROADWAY CLOSED
INSTALL AND SPACE DRUMS NO GREATER THAN TWICE THE POSTED SPEED
THE TRAFFIC FLOW BEGINNING WITH THE DOWNSTREAM SIDE OF TRAFFIC.
THE UPSTREAM SIDE OF TRAFFIC. REMOVE TEMPORARY BARRIER AGAINST
INSTALL TEMPORARY BARRIER WITH THE TRAFFIC FLOW BEGINNING WITH
A HAZARD, OR AS DIRECTED BY THE ENGINEER.
TRANSPORTATION MANAGEMENT PLANS, TEMPORARY BARRIER IS PROTECTING
COST TO THE DEPARTMENT UNLESS OTHERWISE STATED IN THE
THAN TWO (2) MONTHS, REMOVE / RESET TEMPORARY BARRIER AT NO
IS PERFORMED BEHIND THE TEMPORARY BARRIER FOR A PERIOD LONGER
ONCE TEMPORARY BARRIER IS INSTALLED AT ANY LOCATION AND NO WORK
CONCRETE.
DO NOT PLACE BARRIER DIRECTLY ON ANY SURFACE OTHER THAN ASPHALT OR
MANAGEMENT PLANS OR AS DIRECTED BY THE ENGINEER.
IN THAT LOCATION UNLESS OTHERWISE STATED IN THE TRANSPORTATION
PROCEED IN A CONTINUOUS MANNER TO COMPLETE THE PROPOSED WORK
LOCATION. ONCE TEMPORARY BARRIER IS INSTALLED AT ANY LOCATION
PLANS A MAXIMUM OF TWO (2) WEEKS PRIOR TO BEGINNING WORK IN ANY
M) INSTALL TEMPORARY BARRIER ACCORDING TO THE TRANSPORTATION MANAGEMENT
TRAFFIC BARRIER
AT ALL TIMES WITHIN THE PROJECT LIMITS.
ACCESS TO ALL DRIVEWAYS ANS SIDE STREETS MUST BE PROVIDED
FLAGGERS AS NEEDED AND STAGED BRIDGE CONSTRUCTION.
PORTABLE TRAFFIC SIGNAL SYSTEM, LANE CLOSURES UTILIZING
COMBINATION OF TEMPORARY LANE SHIFTS USING A TEMPORARY
PROPOSED SR 1369 (TELLICO RD)WILL BE CONSTRUCTED USING A
ENGINEER.
(W8-1) 100 FT IN ADVANCE OF THE UNEVEN AREA, OR AS DIRECTED BY THE
L) INSTALL BLACK ON ORANGE ''DIP'' SIGNS (W8-2) AND/OR "BUMP" SIGNS
TRAFFIC PATTERN.
K) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY
TO CLOSE THE ROAD WHEN ROAD CLOSURE IS NOT IN OPERATION.
J) COVER OR REMOVE ALL SIGNS AND DEVICES REQUIRED
TO THE ROADWAY STANDARD DRAWINGS AND TRAFFIC CONTROL PLANS.
I) PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE THE ROAD ACCORDING
(3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION.
40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE
H) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN
SIGNING
PATTERN ALTERATION.
G) NOTIFY THE ENGINEER THIRTY (30) CALENDAR DAYS PRIOR TO ANY TRAFFIC
TRAFFIC PATTERN ALTERATIONS
OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA.
"UNEVEN LANES" SIGNS (W8-11) 100 FT IN ADVANCE AND A MINIMUM
OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE WARNING
F) DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN LANES
ENGINEER, AT NO EXPENSE TO THE DEPARTMENT.
BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE
POSTED SPEED LIMITS LESS THAN 45 MPH.
BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH
POSTED SPEED LIMITS OF 45 MPH OR GREATER.
BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH
EDGE OF PAVEMENT DROP-OFF AS FOLLOWS:
PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN
E) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING
PAVEMENT EDGE DROP OFF REQUIREMENTS
EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE.
BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR
THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS, OR AS DIRECTED
OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO
D) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL
BARRIER OR GUARDRAIL.
STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY
ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN
C) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER
BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED.
STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED BY
OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY
B) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN
LONGER NEEDED OR AS DIRECTED BY THE ENGINEER.
PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO
A) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING
LANE AND SHOULDER CLOSURE REQUIREMENTS
OR DIRECTED BY THE ENGINEER.
THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
ENGINEER.
SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE
OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING,
TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED
DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE
CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL
PHASING
PHASING
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_02(PHASING).dgn7/1/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
17BP.14.R.211
SHEET NO.PROJ. REFERENCE NO.
TMP-2
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
Bridge #550079
Macon County
REMOVE THE TEMPORARY PORTABLE CONCRETE BARRIER. (SEE TMP-4 AND STRUCTURE PLANS)
(TMP-4)
CONSTRUCT THE GRAVEL DRIVEAWAY LT OF -DR- STA . 10+60+/-
-DR- STA. 10+30.00 TO 10+81.86
USING TEMPORARY LANE CLOSURES AND FLAGGERS, AS NEEDED, CONSTRUCT -DR- AS FOLLOWS:
(SEE TMP-4).
-L- STA. 16+41.01 (END BRIDGE) TO 18+80.00.
-L- STA. 14+50.00 TO 15+84.99 (BEGIN BRIDGE)
CONSTRUCT THE FOLLOWING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE:
TO 16+41.01.
CONSTRUCT THE SECOND SECTION OF THE PROPOSED STRUCTURE FROM -L- STA. 15+84.99
REMOVE THE REMAINING SECTION OF THE EXISTING BRIDGE. (SEE TMP-4 AND STRUCTURE PLANS).
SHIFT TRAFFIC IN A ONE-LANE TWO-WAY PATTERN ONTO THE NEW BRIDGE.
STEP 2:
(SEE TMP- 4 AND RDWY. STD. 1101.02, SHT 1 OF 14).
TO THE BRIDGE CONSTRUCTED IN PHASE 1.
REMOVE THE TEMPORARY GUARDRAIL , REVISE SIGNAGE AS NECESSARY TO SHIFT ALL TRAFFIC
STEP 1:
PHASE II:
SEE TMP-3 AND STRUCTURE PLANS).
ONTO THE PROPOSED BRIDGE.
INSTALL TEMPORARY PORTABLE CONCRETE BARRIER, INCLUDING TEMPORARY CRASH CUSHION,
-L- STA. 16+41.01 (END BRIDGE) TO 18+80.00. (SEE TMP-3)
-L- STA. 14+50.00 TO 15+84.99 (BEGIN BRIDGE)
CONSTRUCT THE FOLLOWING UP TO BUT NOT INCLUDING THE FINAL LAYER OF SURFACE COURSE:
TO 16+41.01. (SEE TMP-3)
CONSTRUCT THE FIRST SECTION OF THE PROPOSED STRUCTURE FROM -L- STA. 15+84.99
(SEE TMP-3 AND STRUCTURE PLANS).
PLACE TEMPORARY SHORING AS NEEDED AND REMOVE A SECTION OF THE EXISTING BRIDGE.
(SEE TMP-3 AND STRUCTURE PLANS).
PATTERN INSTALL TEMPORARY GUARDRAIL ONTO THE EXISTING BRIDGE.
AFTER ACTIVATING THE TEMPORARY TRAFFIC SIGNAL AND OPENING TRAFFIC IN A ONE-LANE TWO-WAY
STEP 3:
(SEE TMP- 3 AND RDWY. STD. 1101.02, SHT 1 OF 14).
SIGNALS, AND INSTALL THE APPROPRIATE SIGNAGE.
USING TEMPORARY LANE CLOSURES AND FLAGGERS, AS NEEDED, INSTALL TEMPORARY PORTABLE TRAFFIC
STEP 2:
PLACE ALL ADVANCED WORK WARNING SIGNS IN ACCORDANCE TO NCDOT RDWY. STD. 1101.01, SHT. 3 OF 3.
STEP 1:
PHASE I:
NOTE: UNLESS OTHERWISE STATED ACCESS TO LOCAL DRIVES MUST BE MAINTAINED AT ALL TIMES.
REMOVE ALL TRAFFIC CONTROL DEVICES.
(SEE PMP-2 AND NCDOT RDWY. STD. 1101.02, SHT 1 OF 14).
MARKINGS AS SHOWN ON THE PAVEMENT MARKING PLANS.
USING TEMPORARY LANE CLOSURES AND FLAGGERS AS NEEDED INSTALL THE FINAL PAVEMENT
STEP 2:
(SEE TMP-5)
-L- STA 14+50.00 TO 19+30.00
USING LANE CLOSURES AND FLAGGERS AS NEEDED PLACE THE FINAL LAYER OF SURFACE COURSE:
DEACTIVATE THE TEMPORARY TRAFFIC SIGNALS, REMOVE ALL SIGNAGE, AND PLACE THE TRAFFIC IN ITS ORIGINAL PATTERN.
STEP 1:
PHASE III
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_03(Phase 1).dgn8/7/2019
DEPARTE
N
O
F ANSPORTA TIONTAE
OF NORT
H
ROL
NA
WORK
Z
ONE TRAFFIC
CONTROLDIVISION OF
HI
GHW
A
YS
T
S CAI
M
TTR
SHEET NO.
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
200'200'200'
E
M
P
T
48'' X 48''
AHEAD
ROAD
W20-1
WORK
24'' X 36''
R10-6
STOP
RED
HERE ON
48'' X 48''
W3-3
48'' X 48''
AHEAD
ROAD
ONE LANE
W20-4
30'
SR 1369
INSET A
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
14'-9"
11' MIN.
CLEAR ROADWAY
(RSD 862.03 SHT. 7 OF 7)
TEMP. GUARDRAIL
TMP-3
E
MP
T
100'30'
E
M
P
T
PROJ. REFERENCE NO.
BUFFER50'
50'
TAPER
30
'
5
0'
5
0'
TA
PER
SEE INSET A
SEE INSET A
(10' SPACING)
CONES
(10' SPACING)CONES
X
X
P2
A1
A1
SECTION
REMOVE BRIDGE
TEMP. GUARDRAIL
TL-2(TEMP.)
TL-2(TEMP.)
THE ENGINEER
AS DIRECTED BY
TEMP. SHORING
PHASE 1, STEP 3
SR 1369
BARRIER (ANCHORED)
PORTABLE CONCRETE
CUSHION
TEMP. CRASH
CUSHION
TEMP. CRASH
DRUMS(10' SPACING)
DRUMS(10' SPACING)
SR 1369
TELL
ICO
RD
TELLICO CREEK
1
5
+0
0
20+00Bridge #550079
Macon County
17BP.14.R.211
-L- STA 14+50
-L- STA 15+84.99
-L- STA 16+41.01
BEGIN BRIDGE
END BRIDGE
-L- STA 18+80
-L--DR-
WITH R11-2
TYPE III BARRICADE
WITH R11-2
TYPE III BARRICADE
R11-2
48'' x 30''
ROAD
CLOSED
TYPE III BARRICADE DRUM CONE
SEE SHEET TMP-1A FOR PAVEMENT MARKING SCHEDULE
PHASE I
0.04
-L-CL
16'-7"
(PHASE 1 CONSTRUCTION)
CLEAR ROADWAY
11' MIN.
5'±
PHASE 1, STEP 3
STRUCTURE TO BE REMOVED
15'
2'
(RSD 1170.01)
BARRIER(ANCHORED)
PORTABLE CONCRETE
SECTION A1 - A1 -L- STA 16+13±
2'1'-7"
THE ENGINEER
AS DIRECTED BY
TEMPORARY SHORING
THE ENGINEER
AS DIRECTED BY
TEMPORARY SHORING
P2
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_04(Phase 2).dgn8/7/2019DEPARTE
N
O
F ANSPORTA TIONTAEOFNORT
H
ROL
NAWORKZ
ONETRAFFIC CONTROLDIVISIONOF
HI
GHW
A
YS
T
SCAI
M
TTR
APPROVED:
DATE:
SEAL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
200'200'200'
E
M
P
T
48'' X 48''
AHEAD
ROAD
W20-1
WORK
24'' X 36''
R10-6
STOP
RED
HERE ON
48'' X 48''
W3-3
48'' X 48''
AHEAD
ROAD
ONE LANE
W20-4
30'
SR 1369
INSET A
-L-CL
(RSD 1170.01)
BARRIER(ANCHORED)
PORTABLE CONCRETE
SECTION A2 - A2 -L- STA 16+13±
R11-2
48'' x 30''
ROAD
CLOSED
TYPE III BARRICADE DRUM CONE
SEE SHEET TMP-1A FOR PAVEMENT MARKING SCHEDULE
PHASE II
PAVEMENT REMOVAL
REMOVAL OF STRUCTURE
PHASE 2, STEP 2
TO BE REMOVED
STRUCTURE
(PHASE 2 CONSTRUCTION)
13'-5"
15'
CLEAR ROADWAY
11' MIN.
15'
CLOSURE POUR
INCLUDES
PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
SHEET NO.
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
TMP-4
E
MP
T
100'30'
PROJ. REFERENCE NO.
BUFFER50'
50'
TAPER
100
'
5
0'
5
0'
TA
PER
SEE INSET A
SEE INSET A
(10' SPACING)
CONES
(10' SPACING)CONES
BARRIER (ANCHORED)
PORTABLE CONCRETE
CUSHION
TEMP. CRASH
CUSHION
TEMP. CRASH
DRUMS(10' SPACING)
DRUMS(10' SPACING)
SR 1369
TELL
ICO
RD
TELLICO CREEK
1
5
+0
0
20+00Bridge #550079
Macon County
17BP.14.R.211
-L- STA 14+50
-L- STA 15+84.99
-L- STA 16+41.01
BEGIN BRIDGE
END BRIDGE
-L- STA 18+80
-L
--DR-
WITH R11-2
TYPE III BARRICADE
WITH R11-2
TYPE III BARRICADE
A2
A2
-DR- STA 10+30
STRUCTURE
REMOVE
IN TO FINAL PATTERN
PRIOR TO PLACING TRAFFIC
REMOVE STOPBAR MARKINGS
IN TO FINAL PATTERN
PRIOR TO PLACING TRAFFIC
REMOVE STOPBAR MARKINGS
30
'
E
M
P
T
TA
PER
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\TrafficControl\TCP\Macon_550079_TC_TMP_05(Phase 3).dgn7/1/2019DEPARTE
N
O
F ANSPORTA TIONTAEOFNORT
H
ROL
NAWORKZ
ONETRAFFIC CONTROLDIVISIONOF
HI
GHW
A
YS
T
SCAI
M
TTR
APPROVED:
DATE:
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
SHEET NO.
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
TMP-5
PROJ. REFERENCE NO.
Bridge #550079
Macon County
17BP.14.R.211
-L- STA 15+84.99
BEGIN BRIDGE
PHASE III
SCHEDULE AND LAYOUT.
SEE FINAL PAVEMENT MARKING PLANS FOR PAVEMENT MARKING
1
5
+0
0
SR 1369
TELL
ICO
RD
TELLICO CREEK 20+00-L- STA 14+50
-L- STA 16+41.01
END BRIDGE
-L- STA 19+30-L
--DR-PROFESSION
A
LE
NG INEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
INDEX
ROADWAY STANDARD DRAWING
THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" -
CONSIDERED A PART OF THESE PLANS:
PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C.,7/1/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\Pavement Markings\Macon 550079_Sgn_PMP_01.dgnUser:smelvinGENERAL NOTES
STD. NO.TITLE
SHEET NO.DESCRIPTION
SHEET NO.
SEAL
DATE:
APPROVED:
PMP-1
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
PAVEMENT MARKING PLAN
SCHEDULE SHEET
PMP-1 PAVEMENT MARKING PLAN TITLE AND
1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS
1262.01 GUARDRAIL END DELINEATION
1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTILANE ROADWAYS
1205.12 PAVEMENT MARKINGS - BRIDGES
1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING
1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING
DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE
PMP-2 PAVEMENT MARKING DETAIL
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETEDPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ17BP.14.R.211
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
PROJECT.: 17BP.14.R.211PROJECT NO.
FINAL PAVEMENT MARKING SCHEDULE
PI YELLOW DOUBLE CENTER
PA WHITE EDGELINE
PAINT (4")
PAVEMENT MARKINGS
SYMBOL DESCRIPTION
DEPARTMEN
T
O
F TRA N S PORTATIONSTATEOFNORT
H
CAR
O
LI
NAPLAN PREPARED FOR N.C.D.O.T. BY:
PROJECT ENGINEER
DESIGN TECHNICIAN
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS JIMMY TERRY, PE
SANDRA MELVIN
MACON COUNTY
D) REMOVE/REPLACE ANY CONFLICTING/DAMAGED PAVEMENT MARKINGS AND MARKERS.
C) TIE PROPOSED PAVEMENT MARKING LINES TO EXISTING PAVEMENT MARKING LINES.
TIME OF THE FIRST.
SURFACE. PLACE THE SECOND APPLICATION OF PAINT UPON SUFFICIENT DRYING
B) PLACE TWO APPLICATIONS OF PAINT PAVEMENT MARKINGS ON THE FINAL WEARING
SR 1369 TELLICO RD PAINT NONE
ROAD NAME MARKING MARKER
A) INSTALL PAVEMENT MARKINGS ON THE FINAL SURFACE AS FOLLOWS:
OR DIRECTED BY THE ENGINEER.
THE CONSTRUCTION PROJECT, EXCEPT WHEN OTHERWISE NOTED IN THE PLAN,
THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF
LOCATION: BRIDGE #550079 OVER TELLICO CREEK ON SR 1369 (TELLICO RD)
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
1
5
+0
0
-L- STA 15+84.99
BEGIN BRIDGE
SR 1369
TELL
ICO
RD
TELLICO CREEK 20+00-L- STA 14+50
-L- STA 16+41.01
END BRIDGE
-L- STA 19+30-L--DR-
-DR- STA 10+30
Bridge #550079
Macon County
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
TIP NO.SHEET NO.
APPROVED:
DATE:
SEAL
User:smelvinX:\NCDOT\Division 14 - 2017\Macon 550079\Traffic\Pavement Markings\Macon 550079_Sgn_PMP_02.dgn7/1/201917BP.14.R.211 PMP-2
-L- STA 12+50
MARKINGS
TIE TO EXIST. PAVEMENT
MARKINGS
TIE TO EXIST. PAVEMENT
THE ENGINEER
MARKINGS AS DIRECTED BY
REPLACE EXISTING PAVEMENT
150
'
10
'10
'+3010'
10'+0
0
THE ENGINEER
MARKINGS AS DIRECTED BY
REPLACE EXISTING PAVEMENT
PI
PI
PI
PI
PA
PA
SEE SHEET PMP-1 FOR PAVEMENT MARKING SCHEDULE
PAVEMENT MARKING DETAILPROFESSIONALENGINEERNORTHCAROLINA
SEAL
35018 YRRET .L YMMIJ
for Special Considerations.
Refer To E. C. Special Provisions
ON THIS PROJECT
SENSITIVE AREA(S) EXIST
ENVIRONMENTALLY
STANDARDS.
SENSITIVE WATERSHED
BEEN DESIGNED TO
THIS PROJECT HAS
GRAPHIC SCALE
PLANS
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
N.C.
SHEET
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
6/27/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Drainage\Erosion Control\Macon 550079_EC_dsn_TSH.dgnUser:acochrane0
PLAN FOR PROPOSED
HIGHWAY EROSION CONTROL
EROSION AND SEDIMENT CONTROL MEASURES
CONSTRUCTION.
GRUBBING PHASE OF
FOR CLEARING AND
EROSION CONTROL PLANS
THIS PROJECT CONTAINS
Temporary Silt Ditch
Temporary Silt Fence
Silt Basin Type B
Stilling Basin
TDTemporary Diversion
Temporary Rock Silt Check Type-B
Temporary Rock Silt Check Type-A
Temporary Rock Sediment Dam Type-A
Temporary Rock Sediment Dam Type-B
Type A
Type B
Type C
A
B
C
Temporary Silt Fence
TSD
Std. #Description Symbol
Temporary Berms and Slope Drains
Rock Inlet Sediment Trap:
1630.03
1630.05
1605.01
1622.01
1633.01
1634.01
1634.02
1635.01
1635.02
1630.04
1632.01
1632.02
1632.03
Rock Pipe Inlet Sediment Trap Type-A
Rock Pipe Inlet Sediment Trap Type-B
Temporary Rock Sediment Dam Type A
Temporary Rock Sediment Dam Type B
Temporary Silt Fence
Roadway Standard Drawings
The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design
revison thereto are applicable to this project and by reference hereby are considered a part of
these plans.
Rock Pipe Inlet Sediment Trap Type A
EC-1
1606.01 Special Sediment Control Fence
1634.01
1634.02
1635.01
1605.01
1630.01
Temporary Berms and Slope Drains
1606.01
1622.01
Special Sediment Control Fence
Riser Basin
1635.02 Rock Pipe Inlet Sediment Trap Type B
1604.01 Railroad Erosion Control Detail
1607.01 Gravel Construction Entrance
Skimmer Basin
Tiered Skimmer Basin
Infiltration Basin
Special Stilling Basin1630.06
Temporary Rock Silt Check Type-A with
Matting and Polyacrylamide (PAM)
Wattle/Coir Fiber Wattle
Wattle/Coir Fiber Wattle
with Polyacrylamide (PAM)
1630.02
1633.02
1630.05 Temporary Diversion
1630.04 Stilling Basin
1630.03 Temporary Silt Ditch
1630.02 Silt Basin Type B
1630.06 Special Stilling Basin
1631.01 Matting Installation
1632.02
1632.01
Rock Inlet Sediment Trap Type B
Rock Inlet Sediment Trap Type A
1632.03 Rock Inlet Sediment Trap Type C
1633.01
1633.02 Temporary Rock Silt Check Type B
Temporary Rock Silt Check Type A
1640.01
1645.01 Temporary Stream Crossing
EW
CFW
ROADSIDE ENVIRONMENTAL UNIT
Raleigh, NC 27611
1 South Wilmington St.
Prepared in the Office of:
NAME LEVEL III CERTIFICATION NO.
Reviewed by:
Reviewed in the Office of:
Designed by:
TGS ENGINEERS
VICINITY MAP
3015
CONTRACT:PROJECT:Andrew H. Cochrane, PE
SHELBY, NC 28150
804-C N. LAFAYETTE ST.
2018 STANDARD SPECIFICATIONS 2018 STANDARD SPECIFICATIONS
Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2018 and the latest
Coir Fiber Baffle
R/W & UTIL.
N/A
N/A
N/A CONST.
PE
Reid Whitehead, PE, CPESC 25 50
-L- STA. 15+84.99
BEGIN BRIDGE
-L- STA. 16+41.01
END BRIDGE
17BP.14.R.211
BEGIN PROJECT
-L- STA. 14+50.00
-L-TELLICO CREEK15+00
CREEK RD
TO RINEHART
-DR-
-DR- STA. 10+30.00
17BP.14.R.211
END CONSTRUCTION
-L- STA. 18+80.00
BEGIN RESURFACING
SR 1369
20+00TELLICO CREEK
TELLICO RD
MOUNTAIN RDTO BOWERS
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 19+30.00
17BP.14.R.211
17BP.14.R.211MACON COUNTY
TYPE OF WORK: GRADING, DRAINAGE, PAVING, AND STRUCTURE
ON SR 1369 (TELLICO ROAD)
LOCATION: BRIDGE NO. 550079 OVER TELLICO CREEK
17BP.14.R.211
17BP.14.R.211
17BP.14.R.211
DIVISION OF WATER RESOURCES.
OF ENVIRONMENTAL QUALITY
THE NORTH CAROLINA DEPARTMENT
APRIL 1, 2019 AND ISSUED BY
CONSTRUCTION PERMIT EFFECTIVE
BY THE NCG-010000 GENERAL
THE REGULATIONS SET FORTH
CONTROL PLANS COMPLY WITH
THESE EROSION AND SEDIMENTTIP PROJECT:See Sheet 1A For Index of Sheets
17BP.14.R.211VICINITY MAP
M ACON COUNTY
SW AIN COUNTY
Tellico
Creek
Tellico1369
1369
1366
1113 1114
1114Creek
Rattlesnake
1364
1363
1473
1369
Tennessee
Little
28 1133
1131 1132
1133
28
1455
1362
13701364
1369
1372 1370 Ri
ver
1372
14451459
1371
1372
1474
1368
1369
Rinehart
CreekCreek
CoveSugar1369
1367LOCATION
PROJECT
FINAL PLAN SUBMITTAL(
.
1
0
.77
.83
Bush
R d.HickoryCoveMarr
1.7(
River
Need
more
Rd.Licklog
Rd.
Breedlove
Dr.Bull
Hollow
R
d.
Big
Dog Rd.Grady
Estep
Rd.
1.21 .55.62.65.36
1.67
.801.62
3.01
NAD 83/ 2011
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
17BP.14.R.211 EC-2
NATURAL GROUND
NATURAL GROUND
FLOW
2'(MAX.)
CROSS SECTION
CROSS SECTION
TRAPEZOIDAL DITCH
VEE DITCH
EDGE OF PAVEMENT
ISOMETRIC VIEW
PAVEMENT
SHLD.
SLOPE
BACK
SLOPEDITCH
STAKE
2' UPSLOPE
MATTING
STAKE
2' DOWNSLOPE
STAKE
2' UPSLOPE
MATTING
STAKE
2' DOWNSLOPE
TOP VIEW
6'(MIN.)
12"(MIN.)
EXCELSIOR WATTLE
STAKE
UPSLOPE
STAKE
DOWNSLOPE
MATTING
MATTING
See Inset B
INSET B
STAPLES
VAR.
2'(MIN.)
2 IN.
See Inset A
INSET A
STAKES
WATTLE DETAIL
STANDARD SPECIFICATIONS.
INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE
BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL.
INSTALL STAPLES APPROXIMATELY EVERY 1 LINEAR FOOT ON
FORMED INTO A U SHAPE NOT LESS THAN 12" IN LENGTH.
PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE
STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH.
INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE
WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED.
ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH SO FLOW WILL NOT
CROSS SECTION.
USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL
USE MINIMUM 12 IN. DIAMETER EXCELSIOR WATTLE.
NOTES:
FLOW
A A
WIDTH
PLAN
SECTION A-A
SECTION B-B
B
B
2/3 CHANNEL
STRUCTURAL STONE
SEDIMENT CONTROL STONE
12"
MATTING
EXCELSIOR
MATTING
EXCELSIOR
CLASS B STONE
PAM
INSET A
See Inset A
USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR
MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE.
TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL
EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES.
MATTING
EXCELSIOR
CLASS B STONE
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
NOT TO SCALE
EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM)
TEMPORARY ROCK SILT CHECK TYPE 'A' WITH
TO BE APPLIED TO EACH ROCK SILT CHECK.
MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT
A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE
PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN
INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM)
(4 OZ.)
H = 2' MIN
1' MIN
1' MIN
ACCORDANCE WITH ROADWAY STANDARD DRAWING NO. 1633.01.
INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN
NOTES:
17BP.14.R.211 EC-2A
SHEET NO.PROJECT REFERENCE NO.
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
17BP.14.R.211
SITE DESCRIPTION
SOIL STABILIZATION TIMEFRAMES
STABILIZATION TIME
7 DAYS
TIMEFRAME EXCEPTIONS
PERIMETER DIKES, SWALES, DITCHES AND SLOPES
HIGH QUALITY WATER (HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
NONE
SLOPES 3:1 OR FLATTER 14 DAYS
14 DAYS
7 DAYS FOR SLOPES GREATER THAN 50' IN
LENGTH.
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
EC-3
9.0'
8.8'
0102
10'10'
-L- STA 14+50.00
17BP.14.R.211
BEGIN PROJECT
9.0'8.8'00044027006
0102
0001
02 04010302020410+0015+00
0
3 02030401000102-L- PC 15+14.78
-L- PRC 15+84.41
-L- PRC 17+83.74
-L- PT 18+68.72
-L- PT 13+52.31
-L- PC 12+38.68
-L- PC 10+00.00
-L- PT 12+29.58
-L- PCC 10+86.17
-L- POC 20+62.87
-L- PC 19+72.77
-L- STA 15+84.99
BEGIN BRIDGE
-L- STA 16+41.01
END BRIDGE +30REPAT '05 .TSIXE OT10'10'
TYP.
15'+50.4515'
TYP.+85+00REPAT '05 .TSIXE OT
-L- STA. 17+36.52
END FDPS
8:1
8:1
-L- STA. 17+15.35
END FDPS
8:1
-L- STA. 14+50.00
BEGIN FDPS0201
00
GRAVEL DRIVE
PROP.
1
2
-DR- POT 10+00.00
B23
B1
PROP. ASPHALT DRIVE
-DR-16'15'TYP.+65
10'TYP.+56.86OF PROPOSED WING WALL
FOR ALL AREAS IN FRONT
USE 8' GUARDRAIL POSTS
REMOVE EXIST. BRIDGE
-DR- STA 10+30.00
17BP.14.R.211
END CONSTRUCTION
-L- STA. 16+37.40
BEGIN SBG
-L- STA. 18+80.00
BEGIN RESURFACING
-L- STA 19+30.00
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 16+57.10
END SBG
PI Sta 10+71.83
D
L = 50.55'
T = 39.90'
R = 25.00'
-DR- CURVE DATA
1 -DR- PC 10+31.93
2 -DR- PT 10+82.49
= -L- POC 15+72.49
3 -DR- POT 10+91.88
PI Sta 10+43.55
D
L = 86.17'
T = 43.55'
R = 241.00'
PI Sta 11+61.69
D
L = 143.41'
T = 75.53'
R = 185.00'
PI Sta 12+95.54
D
L = 113.64'
T = 56.86'
R = 1,200.00'
PI Sta 15+51.08
D
L = 69.63'
T = 36.29'
R = 100.00'
PI Sta 16+84.53
D
L = 199.32'
T = 100.12'
R = 850.00'
PI Sta 18+26.27
D
L = 84.98'
T = 42.53'
R = 800.00'
PI Sta 20+17.84
D
L = 90.10'
T = 45.07'
R = 1,125.00'
-L- CURVE DATA
SE = 0.04
DS = 20 MPH
DS = 15 MPH DS = 15 MPH
SE = NCSE = NC
T
12" C
MP 18" CMP8
" CMP
12" CMPWALL STN WALL
STN WALL
EXI
STI
NG R/WEXI
STI
NG R/W60.00'
EXISTING R/W
S
SR 136
9 (TELLI
CO RD)18' PAVED ROADWAY50.00'DECKWALL
EXISTING R/W
GR
TELLICO CREEK
SEP PUMP
STEPS
1STFD
DECK
CONC
S
SHEILA ANN POSEY
BETTY JANE BREEDLOVE
FRANKLIN MARSHALL BRADEY
JOSEPH R MARSH JR
TT
PM
BST
18' PAVED ROADWAYSR 1369 (TELLICO RD)
BRK WALK
BRK WALK
COLUMN
2027.46'LOW WIRE
BST
TELLICO CREEK
R L LUNDBERG
TERRY E HALL 18" CMPGR
GR
S
S
S
S 20002000
2000
2000
2000
2000
200020002000200020002000200020002000
2020
2020
2 0 2 0
2020
2020
2020
2020
2020
20202020
2020
2020
2020202020202020
20202020202020202020202020202020202020202020202020202020202020202
0
2
0
2040204020402040204020402040204020402040204020402040204020402040204020402040
20402040
2040
2040 20402040
2040
2040
2040
2040204020402040 20402040
2040 2040206020602060206020602060206020602060206020602060206020602060206020602060206020602060 20602060
2060
2060
2060
2060 2060206020602
0
6
0
20602060
2080208020802080208020802080208020802080208020802080208020802080208020802080
2080
2080
2080
2080
2080
2080 2080208021002100210021002100210021002100210021002100210021002100210021002100210021002100
2100
2100
2100
2100
2100
2100 21202120212021202120
212021202120
21202120212021202120212021202120212021202120212021202120212021202120214021402140214021402140214021402140214021402140214021402140214021402140
2
14
0
214021402140
216021602160216021602160216021602160216021602160216021602160
2160
218021802180218021802180218022002200220022202220SEE DETAIL SHEET 2C-1
MODIFIED CONC. FLUME
0406
0407
0403
0404
0402
0401
2GI
2GI-D
12" CSP
18" RCP-III
FILL
FLOWABLE REMOVE0405
( Not to Scale)
RIP RAP AT EMBANKMENT
-L- STA. 14+66 RT
DETAIL 1
1.5'PIPE
PROP.
Type of Liner= CLASS 'I' RIP-RAP
BED
STREAM
18" RCP-IV
DETAIL 2
( Not to Scale)
4"
12"
E
XIST.
4:1GROUNDNATURAL
PROP. ROADWAY
CONCRETE DITCH
FROM -L- 14+50 STA. TO STA. 15+60 RT
DITCH
CONC.
STAKE
SLOPE
PROP.
SEE DETAIL 2
CONC. DITCH
CLASS 'I' RIP-RAP
SEE DETAIL 1
RIP-RAP AT EMBANKMENT
GEOTEXTILE
CLASS 'B' RIP-RAP
GEOTEXTILE
CLASS 'I' RIP-RAP
15" RCP-III01
02
03
30.00'
+80.00
40.00'
+80.00
40.00'
+50.00
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-4/CONST.4
SEE PROJECT SPECIAL PROVISIONS
ENVIRONMENTALLY SENSITIVE AREA
CONSTRUCTION SHEET 4
EROSION CONTROL FOR
CLEARING AND GRUBBINGNOTE:
STILLING BASIN WHERE APPLICABLE.
UTILIZE SPECIAL STILLING BASIN(S) AS
NOTE:
PLACE TEMPORARY ROCK SEDIMENT DAMS TYPE - B
DRAINAGE OUTLETS.
AND TEMPORARY ROCK SILT CHECKS TYPE - A AT
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
17BP.14.R.211
Bridge #550079
Macon County
NAD 83/ 2011BY REMOVAL OF END BENTS.
STREAMBANK AT LOCATIONS EXPOSED
PLACE COIR FIBER MATTING ALONG THE
B
B
DIKE
IMPERVIOUS
9.0'
8.8'
0102
10'10'
-L- STA 14+50.00
17BP.14.R.211
BEGIN PROJECT
9.0'8.8'00044027006
0102
0001
02 04010302020410+0015+00
0
3 02030401000102-L- PC 15+14.78
-L- PRC 15+84.41
-L- PRC 17+83.74
-L- PT 18+68.72
-L- PT 13+52.31
-L- PC 12+38.68
-L- PC 10+00.00
-L- PT 12+29.58
-L- PCC 10+86.17
-L- POC 20+62.87
-L- PC 19+72.77
-L- STA 15+84.99
BEGIN BRIDGE
-L- STA 16+41.01
END BRIDGE +30REPAT '05 .TSIXE OT10'10'
TYP.
15'+50.4515'
TYP.+85+00REPAT '05 .TSIXE OT
-L- STA. 17+36.52
END FDPS
8:1
8:1
-L- STA. 17+15.35
END FDPS
8:1
-L- STA. 14+50.00
BEGIN FDPS0201
00
GRAVEL DRIVE
PROP.
1
2
-DR- POT 10+00.00
B23
B1
PROP. ASPHALT DRIVE
-DR-16'15'TYP.+65
10'TYP.+56.86OF PROPOSED WING WALL
FOR ALL AREAS IN FRONT
USE 8' GUARDRAIL POSTS
REMOVE EXIST. BRIDGE
-DR- STA 10+30.00
17BP.14.R.211
END CONSTRUCTION
-L- STA. 16+37.40
BEGIN SBG
-L- STA. 18+80.00
BEGIN RESURFACING
-L- STA 19+30.00
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 16+57.10
END SBG
PI Sta 10+71.83
D
L = 50.55'
T = 39.90'
R = 25.00'
-DR- CURVE DATA
1 -DR- PC 10+31.93
2 -DR- PT 10+82.49
= -L- POC 15+72.49
3 -DR- POT 10+91.88
PI Sta 10+43.55
D
L = 86.17'
T = 43.55'
R = 241.00'
PI Sta 11+61.69
D
L = 143.41'
T = 75.53'
R = 185.00'
PI Sta 12+95.54
D
L = 113.64'
T = 56.86'
R = 1,200.00'
PI Sta 15+51.08
D
L = 69.63'
T = 36.29'
R = 100.00'
PI Sta 16+84.53
D
L = 199.32'
T = 100.12'
R = 850.00'
PI Sta 18+26.27
D
L = 84.98'
T = 42.53'
R = 800.00'
PI Sta 20+17.84
D
L = 90.10'
T = 45.07'
R = 1,125.00'
-L- CURVE DATA
SE = 0.04
DS = 20 MPH
DS = 15 MPH DS = 15 MPH
SE = NCSE = NC
T
12" C
MP 18" CMP8
" CMP
12" CMPWALL STN WALL
STN WALL
EXI
STI
NG R/WEXI
STI
NG R/W60.00'
EXISTING R/W
S
SR 136
9 (TELLI
CO RD)18' PAVED ROADWAY50.00'DECKWALL
EXISTING R/W
GR
TELLICO CREEK
SEP PUMP
STEPS
1STFD
DECK
CONC
S
SHEILA ANN POSEY
BETTY JANE BREEDLOVE
FRANKLIN MARSHALL BRADEY
JOSEPH R MARSH JR
TT
PM
BST
18' PAVED ROADWAYSR 1369 (TELLICO RD)
BRK WALK
BRK WALK
COLUMN
2027.46'LOW WIRE
BST
TELLICO CREEK
R L LUNDBERG
TERRY E HALL 18" CMPGR
GR
S
S
S
S
SEE DETAIL SHEET 2C-1
MODIFIED CONC. FLUME
0406
0407
0403
0404
0402
0401
2GI
2GI-D
12" CSP
18" RCP-III
FILL
FLOWABLE REMOVE0405
( Not to Scale)
RIP RAP AT EMBANKMENT
-L- STA. 14+66 RT
DETAIL 1
1.5'PIPE
PROP.
Type of Liner= CLASS 'I' RIP-RAP
BED
STREAM
18" RCP-IV
DETAIL 2
( Not to Scale)
4"
12"
E
XIST.
4:1GROUNDNATURAL
PROP. ROADWAY
CONCRETE DITCH
FROM -L- 14+50 STA. TO STA. 15+60 RT
DITCH
CONC.
STAKE
SLOPE
PROP.
SEE DETAIL 2
CONC. DITCH
CLASS 'I' RIP-RAP
SEE DETAIL 1
RIP-RAP AT EMBANKMENT
GEOTEXTILE
CLASS 'B' RIP-RAP
GEOTEXTILE
CLASS 'I' RIP-RAP
15" RCP-III01
02
03
30.00'
+80.00
40.00'
+80.00
40.00'
+50.00
HYDRAULICSROADWAY DESIGN
ENGINEER ENGINEER
R/W SHEET NO.
SHEET NO.PROJECT REFERENCE NO.
EC-4/CONST.4
NOTE:
STILLING BASIN WHERE APPLICABLE.
UTILIZE SPECIAL STILLING BASIN(S) AS
CORP. LICENSE NO.: C-0275
PH (704) 476-0003
SHELBY, NC 28150
804-C N. LAFAYETTE ST
TGS ENGINEERS
17BP.14.R.211
Bridge #550079
Macon County
NAD 83/ 2011BY REMOVAL OF END BENTS.
STREAMBANK AT LOCATIONS EXPOSED
PLACE COIR FIBER MATTING ALONG THE
B
B
B
B
Entire Slope as Work Allows.
Install Matting for Erosion Control on
For Slopes Excavated Greater Than 10 feet
EC-5/CONST.4
EST. 200 SY
-L- STA 17+00 TO 18+50 RT
PROPOSED DITCH LINE
INSTALL MATTING IN THE
STATE STATE PROJECT REFERENCE NO.
STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION
NO.
TOTAL
SHEETS
SHEET
HEALING IN DIBBLE PLANTING METHOD
firming soil at top.
5. Push handle forward
PLANTING NOTES:
N.C.D.O.T. - ROADSIDE ENVIRONMENTAL UNIT
protected area.
1. Locate a healing-in site in a shady, well
the root collar is at ground level.
against the sloping end so that
4. Place a single layer of plants
as necessary and water thoroughly.
6. Repeat layers of plants and sawdust
correct depth.
and place seedling at
2. Remove planting bar
USING THE KBC PLANTING BAR
SEEDLING / LINER BAREROOT PLANTING DETAIL
PLANTING DETAILS
MIXTURE, TYPE, SIZE, AND FURNISH SHALL CONFORM TO THE FOLLOWING:
toward planter.
as shown and pull handle
1. Insert planting bar
root systems from drying.
container to prevent the
canvas bag or similar
shall be kept in a moist
During planting, seedlings
PLANTING BAG
soil at bottom.
toward planter, firming
4. Pull handle of bar
thoroughly.
hole open. Water
6. Leave compaction
12 inches deep and provide drainage.
2. Excavate a flat bottom trench
a sloping angle.
sawdust over the roots maintaining
5. Place a 2 inch layer of well rotted
at one end of the trench.
well rotted sawdust at a sloping angle
rotted sawdust. Place a 2 inch layer of
3. Backfill the trench with 2 inches well
2 inch
from seedling.
2 inches toward planter
3. Insert planting bar
1 inch thick at center.
4 inches wide and
be 12 inches long,
cross section, and shall
blade with a triangular
Planting bar shall have a
KBC PLANTING BAR
root collar.
10 inches below the
no roots extend more than
pruned, if necessary, so that
All seedlings shall be root
ROOT PRUNING
REFORESTATION
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
REFORESTATION
REFORESTATION DETAIL SHEET
RF-1N.C.17BP.14.R.211
34% BETULA NIGRA
33% PLATANUS OCCIDENTALIS
33% LIRIODENDRON TULIPIFERA
RIVER BIRCH
SYCAMORE
TULIP POPLAR
12 in - 18 in BR
12 in - 18 in BR
12 in - 18 in BR
DO NOT USE FOR CONSTRUCTION
PRELIMINARY PLANS 09/08/9926-JUN-2019 08:40C:\Users\NCDOTuser1\Desktop\17BP.14.R.211\Utilities\Engineering\UBO\Proj\290_001_17BP.14.R.211_ut_tsh_UO01_psh.dgn$$$$USERNAME$$$$
INDEX OF SHEETS
SHEET NO.
17BP.14.R.211 UO-1STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
T.I.P. NO.
ON SR 1369 (TELLICO RD)
LOCATION: BRIDGE #550079 OVER TELLICO CREEK
TYPE OF WORK: TELEPHONE RELOCATION
MACON COUNTY
UTILITIES BY OTHERS PLANS
0
0
0
PROFILE (HORIZONTAL)
GRAPHIC SCALES
PLANS
PROFILE (VERTICAL)
0
00
50 50
50 50
2010510
25 100
25 100
XX
DEPART
ME
NT
OF TRANSPORTATION STATE OF NORTH CARO
LI
NABRIAN BURCH
BOB GOLDING
VACANT
BILL GREEN
UTILITIES REGIONAL ENGINEER
UTILITIES ENGINEER
UTILITIES COORDINATOR
STEVE MODE
JAMES MELTON
UTILITY OWNERS WITH CONFLICTS
FAX (919) 250-4151
PHONE (919) 707-6690
RALEIGH NC 27699-1555
1555 MAIL SERVICES CENTER
DIVISION OF HIGHWAYS
UTILITIES UNIT
PREPARED IN THE OFFICE OF:
(A) COMMUNICATIONS - FRONTIER COMMUNICATIONS
UBO PLAN SHEETS
TITLE SHEET
DESCRIPTION:
UO-2
UO-1
SHEET NO.:
UTILITY PROJECT MANAGER
PROJECT UTILITY COORDINATORTIP PROJECT: 17BP.14.R.211UTILITIES AREA COORDINATOR
SHOWN ON THIS SHEET.
THE CONTRACTOR FOR UTILITY WORK
NO PAYMENT WILL BE MADE TO
SHEET WILL BE DONE BY OTHERS.
ALL UTILITY WORK SHOWN ON THIS
NOTE:
UO-2
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
GRAPHIC SCALES TIP PROJECT:See Sheet 1A For Index of Sheets
17BP.14.R.211GRADING, DRAINAGE, PAVING, AND STRUCTURE
TOTAL LENGTH PROJECT 17BP.14.R.211 #550079
LENGTH STRUCTURE PROJECT 17BP.14.R.211 #550079
LENGTH ROADWAY PROJECT 17BP.14.R.211 #550079
VICINITY MAP
-L- STA. 15+84.99
BEGIN BRIDGE
-L- STA. 16+41.01
END BRIDGE
17BP.14.R.211
BEGIN PROJECT
-L- STA. 14+50.00
-L-
SR 1369
4
20+00THIS PROJECT IS NOT WITHIN ANY MUNICIPAL BOUNDARIES.
CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD II.
TELLICO CREEKTELLICO CREEK
TELLICO RD
15+00
CREEK RD
TO RINEHART
MOUNTAIN RDTO BOWERS
1369
1369
1366
1113 1114
1114
1364
1363
1473
1369
28 1133
1131 1132
1133
28
1455
1362
13701364
1369
1372 1370
1372
14451459
1371
1372
1474
1368
13691369
1367
-DR-
-DR- STA. 10+30.00
17BP.14.R.211
END CONSTRUCTION
17BP.14.R.211
END RESURFACING
END PROJECT
-L- STA. 19+30.00
-L- STA. 18+80.00
BEGIN RESURFACINGRIGHT OF WAY PLANS(
.
1
0
.77
.8
3
1.7(
River
Breedlove
Dr.Bull
Hollow
Rd.
Big
Dog Rd.Grady
Estep
Rd.
1.21 .55.62.65.36
1.67
.801.62
3.01
T 60.00'
EXISTING R/W
EXISTING R/W
GR
BD4 BD1
BD2BD3
TT
GR
GR NAD 83/ 2011
PHONE (704) 732-3241
LINCOLNTON, NC 28092
849 SOUTH LAUREL ST
TELICS
Little
Tennessee
River
SWAIN COUNTY
MACON COUNTYRattlesnakeCreek
Creek
Tellico
CreekSugarCoveCreekCreekRinehartLOCATION
PROJECT
Bush
R d.HickoryCoveMarrNeed
more
Rd.
Licklog
Rd.
GRAVEL DRIVE
PROP.
PROP. ASPHALT DRIVE
OF PROPOSED WING WALL
FOR ALL AREAS IN FRONT
USE 8' GUARDRAIL POSTS
REMOVE EXIST. BRIDGE
MINIMUM ROAD CLEARENCE.
ROAD CROSSING. 18'
TIED TO TREES FOR
TEMP. FRONTIER CABLE
FRONTIER
TEMP. AERIAL
MINIMUM ROAD CLEARENCE.
ROAD CROSSING. 18'
TIED TO POLE FOR
TEMP. FRONTIER CABLE
TO REMAIN
AND DOWNGUY
FRONTIER POLE
DOWNGUY
TEMP. FRONTIER
CONSTRUCTION.
GROUND DURING
LAID OUT ON THE
TEMPORARILY
FRONTIER CABLE
POLE REMOVED
FRONTIER
REMOVED
POLE AND PED
FRONTIER
ABANDONED
UG FRONTIER
ABANDONED
UG FRONTIER
TO REMAIN
UG FRONTIER
REMOVED
FRONTIER PED
TO REMAIN
FRONTIER PED
CONSTRUCTION.
GROUND DURING
LAID OUT ON THE
TEMPORARILY
FRONTIER CABLE
CONSTRUCTION.
GROUND DURING
LAID OUT ON THE
TEMPORARILY
FRONTIER CABLE
REMOVED
FRONTIER
AERIAL
AERIAL FRONTIER
PERMANENT
POLE AND DOWNGUYS
PERMANENT FRONTIER
AERIAL FRONTIER
PERMANENT
UG FRONTIER
PERMANENT
UG FRONTIER
PERMANENT
AND DOWNGUY
FRONTIER POLE
PERMANENT
26-JUN-2019 08:42C:\Users\NCDOTuser1\Desktop\17BP.14.R.211\Utilities\Engineering\UBO\Proj\290_003_17BP.14.R.211_ut_rdy4_UO02_psh.dgn$$$$USERNAME$$$$5/14/99SHEET NO.PROJECT REFERENCE NO.
NAD 83/ 2011
BRIDGE/ROADWAY RELATIONSHIP SKETCH
FOR STRUCTURE PLANS, SEE SHEET S-1 THRU S-??
NOTE: ALL DRIVE RADII ARE 10', UNLESS OTHERWISE NOTED.
-L- STA 14+50.00
17BP.14.R.211
BEGIN PROJECT10+0015+00
-L- STA 15+84.99
BEGIN BRIDGE
-L- STA 16+41.01
END BRIDGEB2B1-DR-
-DR- STA 10+30.00
17BP.14.R.211
END CONSTRUCTION
-L- STA 19+30.00
17BP.14.R.211
END RESURFACING
END PROJECT
-DR- CURVE DATA
EX R/W
+50.00
01
02
03
30.00'
+50.00
EX R/W
+50.00
EX R/W
+68.72
30.00'
+14.78
30.00'
+83.74
EX R/W
+04.03
30.00'
+50.00
30.00'
+84.41
30.00'
+14.78
EX R/W
+88.80EX R/W
+61.68
30.00'
EX R/W
2GI
2GI-D
12" CSP
18" RCP-III REMOVE18" RCP-IV
15" RCP-III
T WL
12" C
MP 18" CMP8
" CMP
12" CMPWALL STN WALL
STN WALL
EXI
STI
NG R/WEXI
STI
NG R/W60.00'
EXISTING R/W
S
SR 13
69 (TELLI
CO RD)18' PAVED ROADWAY50.00'DECKWALL
EXISTING R/W
GR
TELLICO CREEK
SEP PUMP
STEPS
1STFD
DECK
CONC
BD4 BD1
BD2BD3 S
E1
N1W1
S1
DB N-35 PG 872
SHEILA ANN POSEY
DB Q-11 PG 196
BETTY JANE BREEDLOVE
FRANKLIN MARSHALL BRADEY
DB Y-37 PG 2330
JOSEPH R MARSH JR
DB Q-22 PG 287
TT
PM
BST
18' PAVED ROADWAYSR 1369 (TELLICO RD)
BRK WALK
BRK WALK
COLUMN
EIP
EIP
EIP
EIP
N 07°11'47" E158.80'
S
8
1°
2
4'
5
0
"
E
2
8.
7
3'
S 00°05'00" E
100.00'S 23°02'06" E72.84'S 62°10'21" E29.06'N 60°30'01" E138.83'
N 80°12'03" E
S 04°39'46" E516.87'
2027.46'LOW WIRE
BST
TELLICO CREEK
TO R/WEIP 1.20'
TO R/WEIP 0.56'
TERRY E HALL
DB C-21 PG 1455 18" CMPGR
GR
S
S
S
S
UTILITIES BY OTHERS
THIS SHEET.
FOR PROPOSED UTILITY WORK SHOWN ON
PAYMENT WILL BE MADE TO THE CONTRACTOR
SHEET WILL BE DONE BY OTHERS. NO
ALL PROPOSED UTILITY WORK SHOWN ON THIS
THIS SHEET CORRESPONDS TO RDY-
17BP.14.R.211 UO-2
4
REVISIONS R/W SHEET NO.
SHEET NO.8/7/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl_Index.dgnUser:smelvin8/17/99 X-1A
PROJECT REFERENCE NO.
17BP.14,R.211
-DR- ........................... X-7 THRU X-8
-L- ............................ X-1 THRU X-6
EARTHWORK VOLUME SUMMARY........ X-1B
XS-INDEX ....................... X-1A
CROSS-SECTION INDEX
Macon 550079
PROJ. REFERENCE NO. SHEET NO.X-1BNOTE: EMBANKMENT COLUMN DOES NOT INCLUDES BACKFILL FOR UNDERCUTStation Uncl. Exc. EmbtL (cu. yd.) (cu. yd.)14+50.00 0 015+00.00 2 615+20.00 1 515+40.00 1 615+60.00 1 1815+80.00 0 1815+84.99 0 2Station Uncl. Exc. EmbtL (cu. yd.) (cu. yd.)16+41.01 0 016+50.00 3 317+00.00 95 1617+50.00 164 1218+00.00 108 918+50.00 39 918+80.00 5 319+30.00 0 0Station Uncl. Exc. EmbtDr (cu. yd.) (cu. yd.)10+30.00 0 010+40.00 0 010+60.00 0 3810+81.86 0 81CROSS-SECTION SUMMARY17BP.14.R.211STATE OF NORTH CAROLINADIVISION OF HIGHWAYSApproximate quantities only. Unclassified excavation, borrowexcavation, fine grading, clearing and grubbing, and removal of existing pavement will be paid for at the lump sum price for "Grading".
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2000 2000
14+50.00
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
15+00.00
X-117BP.14.R.211
-L-
5 10
BEGIN PROJECT -L- STA. 14+50.00
BRIDGE #550079
MACON COUNTY
2012.87EXI
S
T.EXIST.
2012.49
0.003 0.0204:1
S.S. 2012.10 2:1S.S. 2010.42
E
XIS
T.
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2070 2070
2000 2000
15+20.00
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2070 2070
2000 2000
15+40.00
X-217BP.14.R.211
-L-
5 10
BRIDGE #550079
MACON COUNTY
2012.28
0.017 0.0204:1
S.S. 2012.20
S.S. 2010.772:1E
XIS
T.
2011.98
0.030 0.0304:1
S.S. 2011.83
S.S. 2011.59
WALL
WING
PROP.
E
XIST.
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2070 2070
2000 200015+60.00
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
15+80.00
X-317BP.14.R.211
-L-
5 10
BEGIN BRIDGE -L- STA. 15+84.99
BRIDGE #550079
MACON COUNTY
2011.47
0.040 0.0404:1
S.S. 2012.18
S.S. 2011.31
WALL
WING
PROP.
E
XIST.EXIST.
2010.79
0.040
-DR- INTERSECTION (SEE PROFILE FOR GRADE)
0.040
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
1990 1990
16+00.00
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
16+50.00
X-417BP.14.R.211
-L-
5 10
END BRIDGE -L- STA. 16+41.01
BRIDGE #550079
MACON COUNTY
2002.80
0.040 0.040
2010.50
0.040
S.S. 2015.64
0.040
2:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2070 2070
2000 200017+00.00
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
17+50.00
X-517BP.14.R.211
-L-
5 10
BRIDGE #550079
MACON COUNTY
2011.10
0.020 0.0202:1
S.S. 2011.12 2010.074:1
S.S. 2029.31
1.5:1
2010.16
0.013 0.020
S.S. 2010.10 2009.114:1S.S. 2030.04
1.5:1
3:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
8/7/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
1990 1990
18+00.00
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
18+50.00
2000 2000
2010 2010
2020 2020
2030 2030
2040 2040
2050 2050
18+80.00
X-617BP.14.R.211
-L-
5 10
BRIDGE #550079
MACON COUNTY
END PROJECT -L- STA. 19+30.00
2008.69
0.020 0.0203:1
S.S. 2008.02 2007.48
4
:1
S.S. 2019.55
1.5:1
2006.59
0.030 0.0202:1
S.S. 2002.83
2004.254:1
S.S. 2010.63
1.5:1
2005.23
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl_DR.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2010 201010+00.00
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2010 201010+20.00
2020 2020
2030 2030
2040 2040
2050 2050
2060 2060
2010 201010+40.00
X-717BP.14.R.211
-DR-
5 10
BRIDGE #550079
MACON COUNTY
2024.71
2021.91
2018.70
0.020 0.020
S.S. 2018.39 2:1S.S. 2018.54
2:1
00
00
1010
1010
2020
2020
3030
3030
4040
4040
5050
5050
6060
6060
7070
7070
8080
8080
9090
9090
100100
100100
110110
110110
120120
120120
130130
130130
140140
140140
150150
150150
35'-6"6/28/2019X:\NCDOT\Division 14 - 2017\Macon 550079\Roadway\XSC\550079_Rdy_xpl_DR.dgnUser:smelvinPROJ. REFERENCE NO.SHEET NO.0
6/23/162010 2010
2020 2020
2030 2030
2000 2000
10+60.00
2010 2010
2020 2020
2000 200010+81.86
X-817BP.14.R.211
-DR-
5 10
BRIDGE #550079
MACON COUNTY
2013.58
0.020 0.020
2:1S.S. 2012.03PROP. GRAVEL DR
4%
2011.56
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
LOW CHORD ELEVATIONS
OVERTOPPING FLOOD DATA:
HYDRAULIC DATA:
OVERTOPPING FLOOD ELEVATION
FREQUENCY OF OVERTOPPING FLOOD
OVERTOPPING DISCHARGE
*
PI = 15+00.00
(-)0.6600%
VERTICAL GRADE DATA -L-
(-)4
.8000%
PI = 17+50.00
VERTICAL GRADE DATA -L-
EB2:
BASE HIGH WATER ELEVATION
BASE DISCHARGE (Q100)
DRAINAGE AREA
DESIGN HIGH WATER ELEVATION
FREQUENCY OF DESIGN DISCHARGE
DESIGN DISCHARGE
SECTION ALONG -L-
SECTIONS THROUGH END BENTS ARE TAKEN AT RIGHT ANGLES
(-)0.4360%
EL = 2,012.57
EL = 2,011.48'
2010.1
10 YR|
1600 CFS
2,010
2,000
1,090
1,080
2,020
2,030
EB1:
END BENT 2END BENT 1
SPAN A
2014.4
3100 CFS
10.5 SQ. MI.
2009.2
5 YRS.
1200 CFS
*
16+00 16+5015+5015+00 17+00 17+50
APPROXIMATE GROUND LINE
(Q100)
EL. 2,014.4
(Q5)
EL. 2,009.2
DATE: 3/7/18
APPROX. W.S. ELEV.= 2,003.5
FIX.
(TYP.)
HP 12x53 STEEL PILESEL. 2,012|EL. 2,012|EL. 2,002|EL. 2,003|EL. 2,004|EL. 2,011|EL. 2,011|
E
L. 2,0
1
1|EL. 2,011|
VC = 100'
(-)0.4360%
VC = 170'
(GRADE TO DRAIN)
TO EL. 2,003.9
EXCAVATE
1'-6" TO LIMITS OF UNCLASSIFIED
(GRADE TO DRAIN)
TO EL. 2,003.6
EXCAVATE
N
C
G
RI
D
N
A
D 83/
N
A 2011
-L-
TO SR 1367
TO SR 1368
END APPROACH SLAB
TELLICO CREEK
STRUCTURE
EXISTING
BRIDGE I.D. STA.
STA. 16+13.00 -L-
BEGIN APPROACH SLAB
PRC 15+84.41 -L-
& DETAIL) (TYP.)
(ROADWAY PAY ITEM
TEMPORARY SHORING
-L- CURVE DATA
€
-L- CURVE DATA
€
PI Sta 15+51.08
D = 57° 17' 44.8"
L = 69.63'
T = 36.29'
R = 100.00'
PI Sta 16+84.53
D = 6° 44' 26.4"
L = 199.32'
T = 100.12'
R = 850.00'
STA. 16+51.60 -CHORD EXT.-STA. 15+74.40 -CHORD EXT.-
56'-0" = LENGTH OF BRIDGE
PLAN
PILES & SHEET PILES NOT SHOWN IN PLAN VIEW FOR CLARITYCHECKED BY :
DATE :
DATE :
DRAWN BY : CCC
DATE :DESIGN ENGINEER OF RECORD :
MGC
MGC
1/19
7/19
7/19
GENERAL DRAWING
BETWEEN SR 1368 AND SR 1367
ON SR 1369
TELLICO CREEK
FOR BRIDGE OVER
REPLACES BR. NO. 550079
S-1
42
SHEET 1 OF 4
PRC STA. 15+84.41-L-
WORKPOINT #1 DETAIL
WORK POINT #1
@ EB1
FILL FACE
-L-
STA. 15+84.99-L-
*
IGNORE CURVE*
@ EB2
FILL FACE
STA. 16+41.01-L-
*
IGNORE CURVE*
WORK POINT #2
WORKPOINT #2 DETAIL*PROPOSED BRIDGE IMPROVES LEVEL OF SERVICE
2,008.55 2,008.34
(TYP.)
(TO CHORD)
135°00'00"
28'-0" (ALONG CHORD)
EXP.
STRUCTURE EXCAVATION
EXCAVATION
STRUCTURE
UNCLASSIFIED
EXTENDED
CHORD
STATIONING OCCURS ALONG THE CHORD EXTENDED.
IN ADDITION, THE CONTRACTOR SHALL ASSUME THAT ALL
SLAB ELEVATIONS
3. COMPUTATIONS OF BRIDGE OR APPROACH
2. LAYOUT OF APPROACH SLAB AT END BENT 1
1. LAYOUT OF END BENT 1
@ END BENT 1 FOR THE LAYOUT OF THE FOLLOWING:
THE CONTRACTOR SHALL USE THE TANGENT EXTENDED
STATIONING OCCURS ALONG THE CHORD EXTENDED.
IN ADDITION, THE CONTRACTOR SHALL ASSUME THAT ALL
2. COMPUTATIONS OF APPROACH SLAB ELEVATIONS
1. LAYOUT OF APPROACH SLAB AT END BENT 2
@ END BENT 2 FOR THE LAYOUT OF THE FOLLOWING:
THE CONTRACTOR SHALL USE THE TANGENT EXTENDED
EXTENDED
CHORD
#1 DETAIL'')
(SEE ``WORKPOINT
-CHORD EXT.-
#2 DETAIL'')
(SEE ``WORKPOINT
-CHORD EXT.-
(TYP.)
STEEL SHEET PILES
WORK POINT 1
WORK POINT 2
G.P. EL. 2,012.20
STA. 15+84.99 -L-
FILL FACE @ END BENT 1
G.P. EL. 2,01196
STA. 16+41.01 -L-
FILL FACE @ END BENT 2
FILL FACE @ END BENT 1
STA. 15+84.99 -L-
FILL FACE @ END BENT 2
STA. 16+41.01 -L-
FILL FACE TO FILL FACE (ALONG CHORD)
STA. 16+13.00-L-
BRIDGE ID STA.
-L-
STA. 15+84.99-L-
W.P. #1
END BENT 2
FILL FACE @
END BENT 1
FILL FACE @
END BENT 2
END BENT 1
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
GENERAL DRAWING
BETWEEN SR 1368 AND SR 1367
ON SR 1369
TELLICO CREEK
FOR BRIDGE OVER
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 2/19
MGC
S-2
SHEET 2 OF 41'-9" TO { PILES1'-9" TO { PILESSTEEL PILES
{ HP 12x53 1'-8"4'-10"6'-6"6'-6"6'-6"6'-6"7'-6"7'-6"9'-0"7'-0"
SHEET PILES
STEEL { PZ27
SHEET PILES
STEEL { PZ27
SHEET PILES
STEEL { PZ27
SHEET PILES
STEEL { PZ27
STEEL PILES
{ HP 12x53
FOUNDATION RECOMMENDATION NOTES
FOR PILES, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS.
PILES AT END BENT No. 1 ARE DESIGNED FOR A FACTORED RESISTANCE OF 60 TONS PER PILE.
DRIVE PILES AT END BENT No. 1 TO A REQUIRED DRIVING RESISTANCE OF 100 TONS PER PILE.
DRILLED-IN PILES ARE REQUIRED FOR END BENT NO. 1. EXCAVATE HOLES AT PILE LOCATIONS TO
450 OF THE STANDARD SPECIFICATIONS.
PILES AT END BENT No. 2 ARE DESIGNED FOR A FACTORED RESISTANCE OF 60 TONS PER PILE.
DRIVE PILES AT END BENT No. 2 TO A REQUIRED DRIVING RESISTANCE OF 100 TONS PER PILE.
DRILLED-IN PILES ARE REQUIRED FOR END BENT 2. EXCAVATE HOLES AT PILE LOCATIONS TO
SECTION 450 OF THE STANDARD SPECIFICATIONS.
CONCRETE IS REQUIRED TO FILL HOLES FOR PILE EXCAVATION AT END BENT NO. 1 AND
END BENT NO. 2.
OF 1996.3 FT. FOR END BENT No. 1 AND AT 1998.2 FT. FOR END BENT No. 2.
THE SCOUR CRITICAL ELEVATION FOR THE SHEET PILES AT END BENT No. 1 IS 1996 FT.
ELEVATION 1998.2 FT. OR A MINIMUM OF 5 FT. INTO ROCK. FOR PILE EXCAVATION, SEE
IF REFUSAL IS ENCOUNTERED ABOVE THE MINIMUM ELEVATIONS SPECIFIED, THE RESIDENT ENGINEER WILL
NEED TO CONTACT THE GEOTECHNICAL OPERATIONS PERSON TO REVIEW AND MAKE RECOMMENDATIONS.
AND END BENT No. 2 IS 1998 FT. RESPECTIVELY. SCOUR CRITICAL ELEVATIONS ARE USED
TO MONITOR POSSIBLE SCOUR PROBLEMS DURING THE LIFE OF THE STRUCTURE.
CHORD
EACH END BENT AS SHOWN. SOME EXCAVATION MAY BE REQUIRED DUE TO BOULDERS.
W.P. #2
STA. 16+41.01-L-10'-0"9'-3"7'-3"6'-6"6'-6"6'-6"6'-6"7-PZ27 STEELSHEET PI
LES9-PZ27 STEEL
SHEET PILES8-PZ27 STEEL SHEET PILES16-PZ27 STEEL SHEET PILES
BRACE PILE
HP 12x53 STEEL 6'-6"37'-4ƒ"6"(TYP.)
(TO CHORD)
135°00'00"
FOUNDATION LAYOUT
8/19
8/19 42STAGE ISTAGE II21-PZ27 STEEL SHEET PILES 17-PZ27 STEEL SHEET PILES15-PZ27 STEEL SHEET PILES22-PZ27 STEEL SHEET PILES STAGE ISTAGE II4'-0" TO { STEEL SHEET PILES4'-0" TO { STEEL SHEET PILESELEVATION 1991.3 FT. OR A MINIMUM OF 5 FT. INTO ROCK. FOR PILE EXCAVATION, SEE SECTION
PZ27 STEEL SHEET PILES ARE TO BE DRIVEN IN FRONT (STREAM SIDE) OF HP 12x53 STEEL PILES AT
SHEET PILES SHOULD BE DRIVEN TO REFUSAL AND AT MINIMUM ELEVATION
SHOWN TO THE CENTERLINE PILE.
DIMENSIONS LOCATING PILES ARS
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
LOCATION SKETCH
THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS.
PLANS AND SPECIAL PROVISIONS
FOR UTILITY INFORMATION SEE UTILITY
BM#1: SPIKE IN BASE OF 20" TREE, -L- STA. 14+31.00, 27.5' LT, ELEV. 2017.42'
N
C
G
RI
D
N
A
D 83/
N
A 2011
PROPOSED STRUCTURE
EXISTING STRUCTURE
(ROADWAY PAY ITEM & DETAIL)
PROPOSED GUARDRAIL (TYP.)
-L-
ITEM & DETAIL)
(ROADWAY PAY
CLASS B RIP RAP
BRIDGE I.D. STA.
STA. 16+13.00 -L-
TELLICO CREEK
TO SR 1367
SR 1369 TELLICO RD.
TO SR 1368
ITEM & DETAIL)
(ROADWAY PAY
CLASS B RIP RAP
1STFD
SR 1369
EXISTING
CHECKED BY :
DATE :
DATE :
DRAWN BY : CCC
DATE :DESIGN ENGINEER OF RECORD :MGC
MGC
7/19
1/19
1/19
GENERAL DRAWING
BETWEEN SR 1368 AND SR 1367
ON SR 1369
TELLICO CREEK
FOR BRIDGE OVER
42
ASSUMED LIVE LOAD = HL-93 OR ALTERNATE LOADING.
FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS.
THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1.
SPECIFICATIONS.
STRUCTURE EXCAVATION, SEE SECTION 412 OF THE STANDARD
WILL BE PAID FOR AT THE CONTRACT LUMP SUM PRICE FOR UNCLASSIFIED
CENTERLINE OF THE BRIDGE AS DIRECTED BY THE ENGINEER. THIS WORK
BE EXCAVATED FOR THE DISTANCE OF 30 FT. EACH SIDE OF THE
THE MATERIAL SHOWN IN THE CROSS-HATCHED AREA ON SHEET S-1 SHALL
NOTES:
18-EVALUATING SCOUR AT BRIDGES."
THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH "HEC
FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS.
ACTIVITIES, SEE SPECIAL PROVISIONS.
FOR ASBESTOS ASSESMENT FOR BRIDGE DEMOLITION AND RENOVATION
SHEET 3 OF 4
S-3
STRUCTURE."
SHALL BE INCLUDED IN THE BID PRICE FOR "REMOVAL OF EXISTING
PERTAINING TO HANDLING OF MATERIALS CONTAINING LEAD BASED PAINT
THE COMPIANCE WITH APPLICABLE STATE OR FEDERAL REGULATIONS
107-1 OF THE STANDARD SPECIFICATIONS. ANY COSTS RESULTING FROM
CONTAINS LEAD, THE CONTRACTOR'S ATTENTION IS DIRECTED TO ARTICLE
INASMUCH AS THE PAINT SYSTEM ON THE EXISTING STRUCTURAL STEEL
FOR CRANE SAFETY, SEE SPECIAL PROVISIONS.
FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS.
FOR FALSEWORK AND FORMWORK, SEE SPECIAL PROVISIONS.
MAY BE REDUCED AS FOUND NECESSARY DURING THE LIFE OF THE PROJECT.
DETERIORATE DURING CONSTRUCTION OF THE PROPOSED BRIDGE, THIS LOAD LIMIT
IS PRESENTLY POSTED FOR LOAD LIMIT. SHOULD THE INTEGRITY OF THE BRIDGE
AT THE SITE OF THE PROPOSED BRIDGE SHALL BE REMOVED. THE EXISTING BRIDGE
SUBSTRUCTURE CONSISTING OF TIMBER POST AND BEAM ABUTMENTS, AND LOCATED
ROADWAY WIDTH OF 19'-0‚" AND A 1" ASPHALT WEARING SURFACE; AND A
(1 @ 40'-6) CONSISTING OF A TIMBER FLOOR ON STEEL I-BEAMS, WITH A CLEAR
AFTER SERVING AS A TEMPORARY STRUCTURE, THE EXISTING 1 SPAN STRUCTURE
THE STANDARD SPECIFICATIONS.
PLANS FOR REVIEW AND REMOVE THE BRIDGE IN ACCORDANCE WITH ARTICLE 402-2 OF
DEBRIS FROM FALLING INTO THE WATER. THE CONTRACTOR SHALL SUBMIT DEMOLITION
REMOVAL OF THE EXISTING BRIDGE SHALL BE PREFORMED IN A MANNER THAT PREVENTS
ROADWAY PLANS.
PLANS. FOR PAY ITEM FOR TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC, SEE
FOR THE LIMITS OF TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC, SEE TRAFFIC CONTROL
SHEET 1 OF 4.
TEMPORARY SHORING WILL BE REQUIRED IN THE AREA INDICATED IN THE PLAN VIEW,
THE REINFORCED CONCRETE DECK SLAB.
WILL BE MADE FOR THIS SUBSTITUTION AS IT IS CONSIDERED INCIDENTAL TO THE COST OF
ACCORDANCE WITH ARTICLES 1024-5 AND 1024-6 OF THE STANDARD SPECIFICATIONS. NO PAYMENT
BLAST FURNACE SLAG AT THE SUBSTITUTION RATE SPECIFIED IN ARTICLE 1024-1 AND IN
THE CLASS AA CONCRETE IN THE BRIDGE DECK SHALL CONTAIN FLY ASH OR GROUND GRANULATED
SECTION 442-8 OF THE STANDARD SPECIFICATIONS UNLESS OTHERWISE NOTED ON THE PLANS.
WITH SYSTEM 5 OR SYSTEM 6 OF THE STRUCTURAL STEEL SHOP COATINGS PROGRAM AND
ALL STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50W AND PAINTED IN ACCORDANCE
WITH ARTICLE 420-3 OF THE STANDARD SPECIFICATIONS.
REMOVABLE FORMS MAY BE USED IN LIEU OF METAL STAY-IN-PLACE FORMS IN ACCORDANCE
ON THE PLANS AND THE ACTUAL CONDITIONS AT THE PROJECT SITE.
INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING BRIDGE SUBSTRUCTURE SHOWN
AGAINST THE DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR ADDITIONAL COST
CONVENIENCE OF THE CONTRACTOR, THE CONTRACTOR SHALL HAVE NO CLAIM WHATSOEVER
THE BEST INFORMATION AVAILABLE. SINCE THIS INFORMATION IS SHOWN FOR THE
THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS IS FROM
(TYP.)
(TO CHORD)
135°00'00"
FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE NOTES SHEET S-42.
FOR 18" GALVANIZED STEEL SHEET PILES, SEE SPECIAL PROVISIONS.
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
MGC
TOTAL BILL OF MATERIAL
ITEM
SUPERSTRUCTURE
END BENT 1
END BENT 2
TOTALS
LUMP SUM
LUMP SUM
EXCAVATION
STRUCTURE
UNCLASSIFIED
LUMP SUM
LUMP SUM
SLABS
APPROACH
BRIDGE
(BRIDGE)
STEEL
REINFORCING
LUMP SUM LBS.
LUMP SUM
NO.LIN. FT.LIN. FT.
SHEET 4 OF 4
2/19
DECK SLAB
CONCRETE
REINFORCED
FLOORS
BRIDGE
GROOVING
SQ. FT.SQ. FT.
9
8
17
ASSESSMENT
SBESTOSA
LUMP SUM
LUMP SUM
(BRIDGE)
CONCRETE
CLASS A
CU. YDS.
STEEL PILES
HP 12 x 53
SETUP FOR
EQUIPMENT
PILE DRIVING
EA.
9
8
17
LUMP SUM
LUMP SUM
BEARINGS
ELASTOMERIC
LUMP SUM
LUMP SUM
RAIL
32" ALASKA
BETWEEN SR 1368 AND SR 1367
ON SR 1369
TELLICO CREEK
FOR BRIDGE OVER
GENERAL DRAWING
S-4
( 75 CY )
IN SOIL
EXCAVATION
PILE
NOT IN SOIL
EXCAVATION
PILE
LIN. FT.LIN. FT.LUMP SUM
LUMP SUM
SEALS
JOINT
FOAM
STRUCTURE
EXISTING
REMOVAL OF
88.50
61.50
150.00
45.00
40.00
85.00
1592
1592
STEEL
STRUCTURAL
42,700 LBS.
APPROXIMATE
PILES
STEEL
HP 12x53
SQ. FT.
1750
1750
44.6
40.3
84.9
5647
4920
10,567
144
112
256
87.71
87.71
951
673
1624
8/19
8/19 42
PILES
SHEET
STEEL
GALVANIZED
18"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACONLEVELVEHICLE(TONS)WEIGHT (W)LOAD RATINGCONTROLLING(RF)RATING FACTORSMINIMUMTONS = W x RFFACTORS (DF)DISTRIBUTIONSTRENGTH I LIMIT STATE
SHEARMOMENT
RATING FACTORSPAN (ft)LEFT END OFDISTANCE FROMFACTORS (DF)DISTRIBUTIONRATING FACTORSPAN (ft)LEFT END OFDISTANCE FROMFACTORSLIVE-LOADFACTORS (DF)DISTRIBUTIONMOMENT
RATING FACTORSPAN (ft)LEFT END OFDISTANCE FROMCOMMENT NUMBERHL-93 (INVENTORY)
HL-93 (OPERATING)
HS-20 (INVENTORY)
HS-20 (OPERATING)
N/A
N/A
36.00
36.00
1.75
1.35
1.75
1.35
1.30
1.00FACTORSLIVE-LOAD1.30
1.00
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
1.30
HL-93 (INVENTORY)FATIGUE LL=0.75g #SERVICE II LIMIT STATE
NOTES:
COMMENTS:
4.
3.
2.
1.
LOAD AND RESISTANCE FACTOR RATING (LRFR) SUMMARY FOR STEEL GIRDERS
--
--
1
FOR DESIGN.
ALLOWABLE STRESS FOR SERVICE II LIMIT STATE ARE AS REQUIRED
SERVICE II LIMIT STATES.
MINIMUM RATING FACTORS ARE BASED ON THE STRENGTH I AND
#
1
2
3
* * SEE CHART FOR VEHICLE TYPE
DESIGN LOAD RATING (HL-93) * *
DESIGN LOAD RATING (HS-20) * *
LEGAL LOAD RATING * *
CONTROLLING LOAD RATING
I
EL
ER
- INTERIOR GIRDER
20.000
22.000
34.925
35.550
39.950
42.000
42.000
42.000
41.600
45.000
43.000
33.000
45.000
27.250
33.075
SNSH 13.500 GIRDER LOCATIONGIRDER LOCATIONGIRDER LOCATIONGIRDER LOCATIONSPANSPANSPAN
- EXTERIOR LEFT GIRDER
- EXTERIOR RIGHT GIRDER
SNGARBS2
SNAGRIS2
SNCOTTS3
SNAGGRS4
LIMIT STATE
STRENGTH I
DC
1.25
1.00
1.50
1.00
DWgg
FACTORS
RATING
LOAD
DESIGN
(SV)SINGLE VEHICLE(TTST)TRUCK TRACTOR SEMI-TRAILERLL( )gLL( )gTNAGRIT3
TNAGRIT4
RATING
LOAD
DESIGN
RATING
LOAD
LEGAL
SNS5A
SNS6A
SNS7B
TNT4A
TNT6A
TNT7A
TNT7B
TNAGT5A
TNAGT5B
SERVICE II
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
LOAD FACTORS:
END BENT 1
1
LRFR SUMMARY
STEEL GIRDERS
LRFR SUMMARY FOR
STANDARD
(NON-INTERSTATE TRAFFIC)
STD. NO. LRFR3
END BENT 2
S-5
1.78
2.31
2.20
2.87
5.85
4.61
4.45
2.92
2.54
2.47
2.31
2.20
2.83
2.85
2.38
2.41
2.51
2.38
2.23
2.18
79.20
103.32
78.98
92.20
97.90
79.57
88.71
87.81
92.28
92.40
93.39
94.26
99.01
101.22
105.42
102.34
100.35
98.10
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
1.91
2.47
2.37
3.07
6.04
4.76
4.57
3.02
2.62
2.55
2.39
2.27
2.92
2.95
2.45
2.49
2.60
2.46
2.30
2.26
24.75
24.75
.698
.698
.698
.698
.698
3.59
4.66
4.32
5.60
12.34
8.94
8.36
6.18
5.24
5.37
4.95
4.93
5.85
5.65
5.37
5.05
4.76
4.59
4.64
4.36
24.75
24.75
24.75
24.75
29.70
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
.698
24.75
24.75
24.75
24.75
24.75
19.80
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
24.75
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
1.78
2.31
2.20
2.87
5.85
4.61
4.45
2.92
2.54
2.47
2.31
2.20
2.83
2.85
2.38
2.41
2.51
2.38
2.23
2.18
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
.608
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
49.50
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
INT.
49'-6"
2
3
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
CHECKED BY :
7/19
7/19
MGC
GM/DI 2/08
1/08 REV. 11/12/08RR
REV. 10/1/11
REV. 12/17
MAA/GM
MAA/GM
MAA/THC
MAA
NMW/ZCS
MGC
7/19
2
3
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
11'-0"2'-0"
16'-7"
15'-0"
(MIN. CLEAR ROADWAY)
6'-8"6'-8"2'-3"1'-0"
GRADE POINT
5'-6" 11'-0"
(MIN. CLEAR ROADWAY)
862.03 SHEET 7 OF 7)
STANDARD DRAWING
(SEE ROADWAY
TEMPORARY GUARDRAIL
CUT LINE
0.04
1'-7"2'-0"
19'-0" |
(MIN.)
14'-9"
= TWO WAY TRAFFIC
NOTE:
STAGE I
6'-1"7"
2'-3"
30'-0" (OUT TO OUT)
3'-1"
1'-0"
11'-0"2'-0"
16'-7"9'-5"
15'-0"15'-0"
(MIN. CLEAR ROADWAY)
26'-10"
(CLEAR ROADWAY)
4'-0"
(CLOSURE POUR)
6'-0"6'-8"6'-8"2'-3"
1'-0"
GRADE POINT
(TRAFFIC CONTROL PAY ITEM)
PORTABLE CONCRETE BARRIER (ANCHORED)
0.04
1'-7"
(TYP.)
STAGE II
3'-1"
0.04
CONSTRUCTION STAGING
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
MGC
SBW 12/18
7/19
S-6
427/19
(STAGE I TRAFFIC)(STAGE I)
(TRAFFIC CONTROL PAY ITEM)
PORTABLE CONCRETE BARRIER (ANCHORED)
LIMITS OF THE ANCHORED PORTABLE CONCRETE BARRIER.
SEE TRAFFIC CONTROL PLANS FOR LOCATION AND PAY
SEE ROADWAY PLANS.
FOR TEMPORARY GUARDRAIL DETAILS AND PAY ITEM,
FOR TRAFFIC PHASING, SEE TRAFFIC CONTROL PLANS.
(STAGE II)
SEQUENCE
CONSTRUCTION STAGING
(STAGE I)
CHORD -L-
CHORD -L-
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
TYPICAL SECTION AT INTERMEDIATE DIAPHRAGMS
GRADE POINT
6'-8"6'-8"6'-0"3'-1"3'-1"2'-3"2'-3"
-L-
15'-0"15'-0"
1'-7"1'-7"
CLOSURE POUR
7"
6•"6•"
8"8"
8"8"2'-0"2'-0"VARIES
6"
6"
1'-0"
1'-0"
1 2 3 4 5 6
NOTES:
(SEE NOTES)
1‚" HIGH B.B.U.
(LEVEL)
CONST. JT.
(LEVEL)
CONST. JT.
FORMS (TYP.)
METAL STAY-IN-PLACE
3'-0" CTS.
1•" B.B. @3'-0" CTS.
1•" B.B. @
@ 8" CTS.
4 #5 B2
CONST. JT.
7"
SEE DETAIL A
(SEE PLAN OF SPANS)
SUPERSTRUCTURE
TYPICAL SECTIONS
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 2/19
MGC
#5 B2 #5 B2
FORMS (TYP.)
METAL STAY-IN-PLACE 10•" TOP OF SLAB
8" UNIFORM SLAB
{ GIRDER
4"
4"
#6 D1
#6 D1
3 4
DETAIL A
CLOSURE POUR DETAIL
3'-3"
2'-6" SPLICE
#6 D1
PROJECTION
PROJECTION
2'-8" (TYP.)3'-3"
4'-0" CLOSURE POURSTAGE II STAGE I
3 #4 B1 BARS
6'-0"
S-7
@ 1'-6" CTS.
4"6 #5 B2 BARS4"
@ 8" CTS.
CONST. JT.
CONST. JT.
30'-0" (OUT TO OUT)
9'-5" (STAGE II)4'-0"16'-7" (STAGE I)
3"3"
FLANGE @ { BRG.
TO BOTT. OF TOP
@ { BRG.
2•" BUILD-UP
SHEET 1 OF 3
#5 "A" @ 6" CTS.
#5 "A" @ 6" CTS.
#5 "A" @ 6" CTS.
#5 "A" @ 6" CTS.
1 & 2)
(TYP. BAY
OF SLAB)
(BOTTOM
1'-0"1'-0"11"8•"11"8•"2 - 1" GROOVES
2 - 1" GROOVES
6 #4 B1 @ 1'-6" CTS. 1'-5"3•"3•"13 #4 B1 @ 1'-4" CTS. (SEE PLAN OF SPANS)
@ 8" CTS.
3 #5 B2
6'-1"7"
9 #5 B2 @ 8" CTS.
(TYP. BAY 4 & 5)
(BOTTOM OF SLAB)
26'-10" (CLEAR ROADWAY)
@ 8" CTS.
3 #5 B2
#4 B1
32" ALASKA RAIL (TYP.)
3•" HIGH B.B.
4‚" HIGH B.B.
POUR DETAIL"
SEE "CLOSURE
6"6"
7/19
7/19
CHORD MINIMUM COMPRESSIVE STRENGTH OF 3,000 PSI.
CONCRETE IN THE SLAB HAS BEEN CAST AND HAS REACHED A
THE CURB AND END POST SHALL NOT BE CAST UNTIL ALL
METAL STAY-IN-PLACE FORM WORKING DRAWINGS.
APPROPRIATE, ON EITHER THE STEEL WORKING DRAWINGS OR THE
CONNECTOR PLATES. THE PROPOSAL SHALL BE INDICATED, AS
FORM SUPPORTS OR FORMS AND BEAM/GIRDER STIFFENERS OR
FOR AVOIDING INTERFERENCE BETWEEN METAL STAY-IN-PLACE
THE CONTRACTOR MAY, WHEN NECESSARY, PROPOSE A SCHEME
OF THE REMOVABLE FORM.
OF "A" BARS A CLEAR DISTANCE OF 2•" ABOVE THE TOP
@ 4'-0" CTS. WITH A HEIGHT TO SUPPORT THE BOTTOM MAT
PROVIDE CONTINUOUS HIGH CHAIRS FOR METAL DECK (C.H.C.M.)
BOTTOM MAT OF "A" BARS. WHEN USING REMOVABLE FORMS,
ATOP THE METAL STAY-IN-PLACE FORMS TO SUPPORT THE
PROVIDE 1‚" HIGH BEAM BOLSTERS UPPER AT 4'-0" CTS.2•" CL.0.04
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
SUPERSTRUCTURE
TYPICAL SECTIONS
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 2/19
MGC
GRADE POINT
6'-8"6'-8"6'-0"3'-1"3'-1"2'-3"2'-3"
-L-
15'-0"15'-0"
1'-7"1'-7"
CLOSURE POUR
2'-0"2'-0"VARIES
6"
6"
1 2 3 4 5 6
(LEVEL)
CONST. JT.
(LEVEL)
CONST. JT.
CONST. JT.
TYPICAL SECTION AT END BENT DIAPHRAGMS
*
**
*
* *
*
**
2" B.B. @ 5'-0" CTS.
7- #4 S1 @ 1'-0" CTS.
STAGE II STAGE I4'-0" CLOSURE POUR
3 4
6'-0"
CLOSURE POUR DETAIL
OVER GIRDER 6
3 #5 K1
OVER GIRDER 5
3 #5 K2
OVER GIRDER 4
3 #5 K3
OVER GIRDER 3
3 #5 K4OVER GIRDER 1
3 #5 K6
OVER GIRDER 2
3 #5 K5
4-#5 S1 @ 1'-0" CTS.
2" B.B. @ 4'-0" CTS.
CONST. JT.
CONST. JT.
OVER GIRDER 4
3 #5 K3OVER GIRDER 3
3 #5 K4
FORMS (TYP.)
METAL STAY-IN-PLACE
(ALONG SKEW)
(ALONG SKEW)
2" B.B. @ 2'-0" CTS.
S-8
SHEET 2 OF 3
2 - 1" GROOVES
2 - 1" GROOVES11"8•"11"8•"30'-0" (OUT TO OUT)
9'-5" (STAGE II)4'-0"16'-7" (STAGE I)
26'-10" (CLEAR ROADWAY)
(TYP. BAY 4 & 5)
(ALONG SKEW) (STAGE I)
(TYP. BAY 4 & 5)
(ALONG SKEW)
(ALONG SKEW)
3-#4 S1 @ EQUAL SPACES
32" ALASKA RAIL (TYP.)
POUR DETAIL"
SEE "CLOSURE
CHORD
7/19
7/19
0.04
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
MGC
2/19
END BENT DIAPHRAGM PLAN 2•" CLR.8" SLAB1'-3"METAL FORMS
STAY-IN-PLACE
METAL FORMS
STAY-IN-PLACE
B.B.U.
1‚" HIGH
B.B.U.
1‚" HIGH
@ 3'-0" CTS.
1•" B.B.U.
@ 3'-0" CTS.
1•" B.B.U.
"A" BARS "B" BARS "A" BARS "B" BARS
3•" CL. TO S1
2" CL. TO S1
APPROACH SLAB"
SEE "BRIDGE
*
#4 S1
*
AND STIRRUPS.
CLEAR REINFORCING STEEL
SLIGHTLY, AS NECESSARY, TO
#5 "G" BAR MAY BE SHIFTED
BOTT.FLANGE3'-3"
3-#5 "K" BARS
1'-8•"
{ BEARING
2" HIGH B.B.
DIAPHRAGM BACKWALL2'-2•" DIAPHAGRMPILESFOR SHEETSTEP DOWN3"1'-0"1'-6"3'-3" CAP5'-0" = TOTAL CAP WIDTH2'-3Œ"S-9
SHEET 3 OF 3
CONN. }
SUPERSTRUCTURE
DETAILS
TYPICAL SECTION
FILL FACE
{ JOINT
FILL FACE
#5 "G"
SECTION THRU END BENT DIAPHRAGM
SECTION THRU INTERMEDIATE DIAPHRAGM
2'-2•"
SHEET
APPROACH SLAB DETAILS"
DETAILS, SEE "BRIDGE
FOR FOAM JOINT SEAL
END STIFFENER1" FORMED OPENINGBEARING{
7/19
7/19 42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
MGC
SUPERSTRUCTURE
S-1015'-0"1'-7"4
5
6
GUTTER LINE
73 #5 A1 @ 6" CTS. (TOP OF SLAB)
73 #5 A2 @ 6" CTS. (BOTTOM OF SLAB)
#5 A101 THRU A128 @ 6" CTS. (TOP OF SLAB)
#5 A201 THRU A228 @ 6" CTS. (BOTT. OF SLAB)
#5 A228 THRU A201 @ 6" CTS. (BOTT. OF SLAB)15'-0"1'-7"6"
6"
3'-3•"3•"3•"13 #4 B1 @ 1'-4" CTS.(2-BAR RUNS) (TOP OF SLAB)56'-0" (FILL FACE @ END BENT #1 TO FILL FACE @ END BENT #2)8"8" 7" (TOP AND BOTTOM OF SLAB)
6'-7•"94 #6 D1 @ 6" CTS.
#5 A2
#5 A1 OR
#5 A2
#5 A1 OR#5 A201
#5 A101 OR
#5 A201
#5 A101 OR
#5 A228
#5 A128 OR
#5 A228
#5 A128 OR
SEE " DETAIL A"
DETAIL A
END BENT 1
FILL FACE AT
SEE " DETAIL B"
DETAIL B
END BENT 2
FILL FACE AT
CONST. JT.
CONST. JT.1'-0•"1'-0•" OVER GDR. 6
3 #5 K1
OVER GDR. 5
3 #5 K2
OVER GDR. 4
3 #5 K3
OVER GDR. 5
3 #5 K2
OVER GDR. 6
3 #5 K1
OVER GDR. 4
3 #5 K3 *
*
*
#5 G1
#5 G1
#5 B2
PLAN OF SPAN A STAGE I
STAGE I
PLAN OF SPAN A30'-0" (OUT TO OUT)16'-7" (STAGE I) 1'-0•"1'-0•"1'-5•"
1'-5•"
(BOTTOM OF SLAB)
3 #5 B2 @ 8" CTS.
(TYP. EA. BAY)
(BOTTOM OF SLAB)
9 #5 B2 @ 8" CTS.
A1 OR A2
TO FIRST
CURB8"3'-3…"20'-2ˆ"22'-3ˆ"1'-2…"@ END BENT 1
{ JOINT
@ END BENT 2
{ JOINT
END BENT 1
FILL FACE AT
END BENT 2
FILL FACE AT
WP 1 WP 2
#5 A128 THRU A101 @ 6" CTS. (TOP OF SLAB)
WP 1 WP 2
CHORD
CHORD
7/19
7/19
SHEET 1 OF 2
(TO CHORD) (TYP.)
135° 00' 00"
(TYP. INTERIOR BAYS)
7- #4 S1 @ 1'-0" CTS. (ALONG SKEW)
2'-2•"
END BENT
DIAPHRAGM
CHORD
CONST. JT.
2'-2•"
END BENT
DIAPHRAGM
FOR ADDITIONAL STEEL REINFORCING AND ANCHOR ASSEMBLIES, SEE ``PLAN OF PARAPET FOR 32" ALASKA RAIL" SHEET.
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
MGC
S-114'-0"1'-7"POURCLOSURE 1
2
3
GUTTER LINE
87 #5 A3 @ 6" CTS. (TOP OF SLAB)
87 #5 A4 @ 6" CTS. (BOTTOM OF SLAB)#5 A401 THRU A414 @ 6" CTS. (BOTT. OF SLAB)
#5 A301 THRU A314 @ 6" CTS. (TOP OF SLAB)
#5 A314 THRU A301 @ 6" CTS. (TOP OF SLAB)
#5 A414 THRU A401 @ 6" CTS. (BOTT. OF SLAB)7'-10"6"
6"
SUPERSTRUCTURE3"3"6"6"56'-0" (FILL FACE @ END BENT #1 TO FILL FACE @ END BENT #2)(TOP OF SLAB)(2-BAR RUNS) @ 1'-6" CTS.6 #4 B1 7" (TOP AND BOTTOM OF SLAB)
10'-0•"94 #6 D1 @ 6" CTS.
#5 A4
#5 A3 OR
#5 A4
#5 A3 OR
#5 A401
#5 A301 OR
#5 A401
#5 A301 OR
#5 A414
#5 A314 OR
#5 A414
#5 A314 OR
SEE " DETAIL C"
DETAIL C
SEE " DETAIL D"
DETAIL D
END BENT 1
FILL FACE AT
END BENT 2
FILL FACE AT
CONST. JT.
CONST. JT.1'-0•"1'-0•" OVER GDR. 3
3 #5 K4
OVER GDR. 2
3 #5 K5
OVER GDR. 1
3 #5 K6
OVER GDR. 1
3-#5 K6
OVER GDR. 2
3 #5 K5
OVER GDR. 3
3 #5 K4 (CLOSURE POUR)
4- #4 S1 @ 1'-0" CTS. (ALONG SKEW)
#5 G2
#5 G26•"6•"#5 B2
4" 4""A"
"B"
"C"
"D"
"D"
"E"
"E"
6 #5 B2 @ 6" CTS (BOTT. OF SLAB)
PLAN OF SPAN A STAGE II
STAGE II
PLAN OF SPAN A30'-0" (OUT TO OUT)(STAGE II)@ END BENT 1
{ JOINT
@ END BENT 2
{ JOINT
1'-5•"
1'-5•"1'-0•"1'-0•"CURBTO FIRST A3 OR A48'-11‚"13'-3Ž"6'-10‚"13'-3Ž"END BENT 2
FILL FACE AT
END BENT 1
FILL FACE AT
8"1'-5"SHEET 2 OF 2
7/19
7/19
WP 1 WP 2
WP 2
CHORDCHORD
WP 1
(TO CHORD) (TYP.)
135° 00' 00"
#4 B1 (BOTTOM OF SLAB)
3 #5 B2 @ 8" CTS.
3 #4 B1 @ 1'-6" CTS (2-BAR RUNS) (TOP OF SLAB)
4 #5 B2 @ 8" CTS (BOTT. OF SLAB) (BAY 1 & 2)
(TYP. INTERIOR BAYS)
3- #4 S1 @ EQUAL SPACINGS (ALONG SKEW)
2'-2•"
END BENT
DIAPHRAGM
CHORD
CONST. JOINT
2'-2•"
END BENT
DIAPHRAGM
"A" :
"B" :
"C" :
"D" :
"E" : 42
FOR ADDITIONAL STEEL REINFORCING AND ANCHOR ASSEMBLIES, SEE ``PLAN OF PARAPET FOR 32" ALASKA RAIL" SHEET.
16'-9•"9'-5"1'-7"
-L-
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
SUPERSTRUCTURE
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 3/19
MGC
4
5
6
1
2
3
6'-8"6'-8"6'-0"3'-1"3'-1"56'-0" (FILL FACE @ END BENT #1 TO FILL FACE @ END BENT #2)STAGE IISTAGE I49'-6" ({ BEARING TO { BEARING)
24'-9"24'-9"
{ BEARING { BEARING
BEARINGS
{ BETWEEN
S-12
7/19
7/19
WP 1
WP 2
FRAMING PLAN
FRAMING PLAN
END BENT 1
FILL FACE AT
END BENT 2
FILL FACE AT
(TO CHORD) (TYP.)
135° 00' 00"4'-4Š"4'-4Š"8'-5Ž"9‡"8'-7‚"9'-5„"(TYP.)
DIAPHRAGM D2
INTERMEDIATE
(TYP.)
DIAPHRAGM D1
END BENT
(TYP.)
DIAPHRAGM D1
END BENT
{ BM 1
{ BM 2
{ BM 3
{ BM 4
{ BM 5
{ BM 6
FIX
E1, P1
EXP.
E2, P2
6'-1"7"CHORD
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
MGC
SUPERSTRUCTURE
GIRDER ELEVATION W/ SHEAR STUD SPACING & STIFF. DETAILS
BOTTOM FLANGE DETAIL
50'-7"
6•"6•"
28 ROWS OF ƒ" ~ x 5" SHEAR STUDS @ 1'-10" CTS. (3 STUDS PER ROW) = 84 STUDS PER GIRDER
DRIP BEAD DETAILS
DIRECTION OF FLOW
VIEW A-ASECTION
‚"
‚"
•" x 1" }
‚"
‚"
•" x •" }
(TYP.)
(TYP.)
(TYP.)
(TYP.)
(TYP.)
•" x 1" }
BEAD
WELD AND DRIP
BETWEEN FILLET
OR STEEL EPOXY
SILICONE CAULK
A
A
3
1
(TYP.)
PART PLAN - BOTTOM FLANGE
{ BEARING
(TYP.)
DRIP BEAD
(TYP.)
DRIP BEAD
FLOW
DIRECTION OF
5'-0" |5'-0" |
1"
‚" | „"
‚" | „"
‚" | „"
1" CL.
W 27 X 129
END BENT 2
2" (TYP.)
END BENT 1
{ BEARING
3
1
(TYP.)2"
(TYP.)BELOW)
(SEE DETAILS
DRIP BEAD
5'-0" |
(TYP. EA. END)
TO DRIP BEAD
6•"6•"2'-9"2'-9"3'-3"
3'-3"
(TYP.)
END BENT DIAPHRAGM
(TYP.)
END BENT DIAPHRAGM
49'-6" ({ BEARING TO { BEARING)
DETAIL A5"3"3"
STUDS
{ ƒ" ~ x 5"
DIRECTION OF FLOW
DIRECTION OF FLOW
( SEE DETAIL "A" )
S-13
SHEET 1 OF 3
3/19
7/19
7/19
49'-6"
@ END BENT 1
{ BEARING @ END BENT 2
{ BEARING
END BENT 2
FILL FACE AT
END BENT 1
FILL FACE AT
STRUCTURAL STEEL
END STIFFENER
†" x 4•"†" CONN. }
END STIFFENER
†" x 4•"
†" CONN. } †" CONN. }
†" CONN. }
@ END BENT 1
{ BEARING
@ END BENT 2
{ BEARINGEND STIFFENER
†" x 4•"
END STIFFENER
†" x 4•"
†" CONN. }
†" CONN. }
†" CONN. }
†" CONN. }
(TYP.)
†" GUSSET }
(TYP.)
†" GUSSET }
42
‚" | „"‚" | „"(TYP.)(TYP.)TYPICAL STIFFENER OR
CONNECTOR PLATE CONNECTIONS
Š
Š
Š
Š(TYP.)END OF WELD
END OF WELD
(TYP.)*
*
A CONNECTOR PLATE
STIFFENER IS USED AS
WELD ONLY WHEN
WELD TERMINATION DETAIL
Š
Š
4"NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
SUPERSTRUCTURE
DETAILS
STRUCTURAL STEEL
S-14
(TYP.)
END OF WELD
GUSSET }
TYPICAL GUSSET PLATE CONNECTION
OR ANGLE
CHANNEL
WELD TERMINATION DETAILS
‚" | „"
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
MGC
3/19
SHEAR STUD DETAIL4"1•"
{ STUD
SHEAR STUD
ƒ" ~ x 4"
(TYP. EACH END BENT DIAPHRAGM)
WELD DETAILS
STIFFENER/CONNECTOR PLATE
DETAILS")
(SEE "WELD TERMINATION
WELDED CONECTION
CONNECTION
BOLTED
STRUCTURAL STEEL NOTES :
OTHERWISE NOTED.
ALL DIMENSIONS SHOWN ARE HORIZONTAL OR VERTICAL UNLESS
UNLESS OTHERWISE NOTED.
ALL FIELD CONNECTIONS TO BE ‡" DIA. HIGH STRENGTH BOLTS
FORM WORKING DRAWINGS.
EITHER THE STEEL WORKING DRAWINGS OR THE METAL STAY-IN-PLACE
PLATES. THE PROPOSAL SHALL BE INDICATED, AS APPROPRIATE, ON
SUPPORTS OR FORMS AND BEAM/GIRDER STIFFENERS OR CONNECTOR
AVOIDING INTERFERENCE BETWEEN METAL STAY-IN-PLACE FORM
THE CONTRACTOR MAY, WHEN NECESSARY, PROPOSE A SCHEME FOR
MARK D1 - END BENT DIAPHRAGM MARK D2 - INTERMEDIATE DIAPHRAGM
@ 1'-0" CTS. ALONG SKEW TOP OF SLAB
TOP OF SLAB
{ C 12x20.7{ C 12x20.7
2"
2"
H.S. BOLTS
{ ‡" ~
H.S. BOLTS
{ ‡" ~
2"
2" @ 3"
2 SPA. @ 3"
2 SPA.4"4"(TYP.)(TYP.)(TYP.)
†" CONN. }
END STIFFENER
7/19
7/19
(TYP.)
GUSSET }
(TYP.)& CONN. }
†" END STIFFENER
STIFFENER
END 1•" CLIP1•" CLIP
Š
Š
WEB
END STIFFENER
CONN. } OR
GUSSET }
C 12x20.7
C 12x20.7
SHEET 2 OF 3
OTHERWISE NOTED ON THE PLANS.
SECTION 442-8 OF THE STANDARD SPECIFICATIONS UNLESS
OF THE STRUCTURAL STEEL SHOP COATINGS PROGRAM AND
AND PAINTED IN ACCORDANCE WITH SYSTEM 5 OR SYSTEM 6
ALL STRUCTURAL STEEL SHALL BE AASHTO M270 GRADE 50W
THE BEAM AND SHALL BE PLUMB.
END STIFFENERS ARE TO BE PLACED NORMAL TO THE WEB OF
440-8 OF THE STANDARD SPECIFICATIONS.
DIRECT TENSION INDICATOR WASHERS IN ACCORDANCE WITH ARTICLE
TENSION ON THE ASTM A325 BOLTS SHALL BE CALIBRATED USING
ENDS OF BEAMS SHALL BE PLUMB.
ACCORDANCE WITH ARTICLE 1072-9 OF THE STANDARD SPECIFICATIONS.
A CHARPY V-NOTCH TEST IS REQUIRED ON ALL BEAM SECTIONS IN
AT NO ADDITIONAL COST TO THE DEPARTMENT.
PLATES MAY BE USED IN LIEU OF THE DIAPHRAGM WITH BOLTED ANGLES
AT THE CONTRACTOR'S OPTION, THE DIAPHRAGM WITH THE WELDED GUSSET
STAGES HAVE BEEN POURED.
PLATES SHALL BE LEFT LOOSE FOR PURPOSE OF ADJUSTMENT UNTIL BOTH
NUTS AND BOLTS FOR CONNECTING CLOSURE BAY DIAPHRAGMS TO CONNECTOR
DEAD LOAD IS APPLIED.
DEAD LOAD FIT UP. BEAMS SHALL BE PLUMB AFTER THE FULL AMOUNT OF
FABRICATORS SHALL DETAIL DIAPHRAGM MEMBERS AND CONNECTIONS FOR FULL
NEEDLE BEAM TYPE SUPPORTS ARE REQUIRED FOR THE OVERHANG FALSEWORK.
END STIFFENERS ARE NOT REQUIRED ON THE OUTSIDE OF THE EXTERIOR BEAMS.
ƒ" ~ x 4" STUDS
CONN. }
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 3/19
MGC
SUPERSTRUCTURE
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
S-15
BEAM 1
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.006
0.001
0.132
„"
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
Š"…"•"•"•"…"Š"
BEAM 2
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
„"
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.008
0.005
0.000
0.156
„"
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
‚"…"‹"‹"‹"…"‚"
BEAM 3
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
„"
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.007
0.005
0.000
0.140
„"
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
Š"‹"•"•"‹"Š"
BEAM 4
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
‰"
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.007
0.003
0.163
‰"
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
Š"‹"•"Œ"•"‹"Š"
BEAM 5
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
‰"
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.008
0.003
0.170
‰"
SPAN A
.2 .4 .6 .8
DEFLECTION DUE TO WEIGHT OF SLAB
DEFLECTION DUE TO WEIGHT OF ALASKA RAIL
TOTAL DEAD LOAD DEFLECTION
REQUIRED CAMBER
TENTH POINTS .1 .3 .5 .7 .9
Š"‹"•"•"‹"Š"
BEAM 6
DEAD LOAD DEFLECTIONS
DEFLECTION DUE TO WEIGHT OF BEAM
*
{ BRG.{ BRG.
ALL VALUES ARE SHOWN IN FEET (DECIMAL FORM) EXCEPT ``REQUIRED CAMBER'', WHICH IS SHOWN IN INCHES (FRACTION FORM).
* INCLUDES SLAB, BUILD-UP AND STAY-IN-PLACE FORMS.
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.007
0.003
0.162
‰"
0.007
0.012
0.002
0.249
‚"Š"…"‹"…"„"
0.009
0.016
0.003
0.341
0.011
0.018
0.004
0.399
Š"‚"
0.012
0.019
0.004
0.419
0.011
0.018
0.004
0.399
0.009
0.016
0.003
0.341
0.007
0.012
0.002
0.249
0.004
0.006
0.001
0.132
0.015
0.010
0.000
0.295
0.020
0.013
0.000
0.404
0.024
0.015
0.000 0.000
0.473
0.025
0.016
0.497
0.024
0.015
0.000
0.473
0.020
0.013
0.000
0.404
0.015
0.010
0.000
0.295
0.008
0.005
0.000
0.156
0.012
0.010
0.000
0.265
0.017
0.013
0.000
0.363
0.020
0.016
0.000
0.425
0.021
0.016
0.000
0.447
0.020
0.016
0.000
0.425
0.017
0.013
0.000
0.363
0.012
0.010
0.000
0.265
0.007
0.005
0.000
0.140
0.007
0.013
0.006
0.308
0.009
0.017
0.008
0.422
0.011
0.020
0.010
0.494
•"
0.012
0.021
0.010
0.519
0.011
0.020
0.010
0.494
0.009
0.017
0.008
0.422
0.007
0.013
0.006
0.308
0.004
0.007
0.003
0.163
0.007
0.014
0.005
0.321
0.009
0.020
0.007
0.439
0.011
0.023
0.009
0.514
0.012
0.024
0.009
0.540
0.011
0.023
0.009
0.514
0.009
0.020
0.007
0.439
0.007
0.014
0.005
0.321
0.004
0.008
0.003
0.170
0.007
0.013
0.006
0.306
0.009
0.018
0.008
0.419
0.011
0.021
0.009
0.491
•"
0.012
0.022
0.010
0.515
0.011
0.021
0.009
0.491
0.009
0.018
0.008
0.419
0.007
0.013
0.006
0.306
0.004
0.007
0.003
0.162
‰"
SHEET 3 OF 3
DEAD LOAD DEFLECTIONS
0 0
0 0
0 0
0 0
0 0 0 0
8/19
8/19 42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
12 GAGE STEEL }‰'' STEEL }
ELASTOMER
‰'' RIB
( TYP.)‚''„'' ( TYP.)
„'' ALL AROUND ‚''1 ƒ''8''.381''.381''E2
``P''
PLAN VIEW OF ELASTOMERIC BEARING1'-5''8''8''
4''4''4''4''
FIXED EXPANSION
END VIEW
TYPICAL SECTION OF ELASTOMERIC BEARINGS
1'-10''2 •" WITH STANDARD WASHER
EXTENDING „'' ABOVE SOLE }
2'' • PIPE SLEEVE
SLOTS
À 2 Œ'' X 3 ƒ''
À BEAM
1 •° MOLD DRAFT
2 •''E1
``P''
(TYP.)
SWEDGE
15"
BRIDGE SEAT
(TYP.)
4" THREAD
HOLES
À 1 •'' •
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : JMB 1 1/87
CHECKED BY : ARB 1 1/87
REV. 10/1/11 MAA/GM
REV. 6/13 AAC/MAA
REV. 12/17 MAA/THC
DETAILS
ELASTOMERIC BEARING
STANDARD
STD. NO. EB1
NOTES
APPROVAL.
DETAILS ARE SUBMITTED TO THE ENGINEER FOR REVIEW AND
THE CONTRACTOR MAY PROPOSE ALTERNATE METHODS, PROVIDED
1.
AND END ROTATION:
RESET ELASTOMERIC BEARINGS DUE TO GIRDER TRANSLATION
PROCEDURE, WHICH MAY BE REQUIRED BY THE ENGINEER, TO
THE CONTRACTOR'S ATTENTION IS CALLED TO THE FOLLOWING
60° F.
THIS OPERATION SHALL BE PERFORMED AT APPROXIMATELY
AS NEARLY AS PRACTICAL ABOUT THE BEARING STIFFENER.
JACKED AND THE ELASTOMERIC BEARING SLOTS CENTERED
ONCE THE DECK HAS CURED, THE GIRDERS SHALL BE
S-16
NMW 3/19
MGC
SERVICE LOADS
MAXIMUM ALLOWABLE
D.L.+L.L. (NO IMPACT)
TYPE I
TYPE I
SOLE PLATE DETAILS ( ``P'' )
Š"
Š"
Š"
Š"
ANCHOR BOLTS
1 ƒ'' • x 1'-11•"
PROVISIONS.
FOR STEEL REINFORCED ELASTOMERIC BEARINGS, SEE SPECIAL
AASHTO M251.
HAVE A SHEAR MODULUS OF 0.160 KSI, IN ACCORDANCE WITH
THE ELASTOMER IN THE STEEL REINFORCED BEARINGS SHALL
STRAIGHT.
ALL SURFACES OF BEARING PLATES SHALL BE SMOOTH AND
DAMAGE THE ELASTOMER.
DOES NOT EXCEED 300°F. TEMPERATURES ABOVE THIS MAY
MEANS, TO ENSURE THAT THE TEMPERATURE OF THE SOLE PLATE
USE TEMPERATURE INDICATING WAX PENS, OR OTHER SUITABLE
WHEN FIELD WELDING THE SOLE PLATE TO THE GIRDER FLANGE,
BOLTS, NUTS AND WASHERS. SHOP INSPECTION IS REQUIRED.
AASHTO M293. SHOP DRAWINGS ARE NOT REQUIRED FOR ANCHOR
AASHTO M292-2H. WASHERS SHALL MEET THE REQUIREMENTS OF
NUTS SHALL MEET THE REQUIREMENTS OF AASHTO M291-DH OR
ANCHOR BOLTS SHALL MEET THE REQUIREMENTS OF ASTM A449.
SPECIFICATIONS.
GALVANIZED IN ACCORDANCE WITH THE STANDARD
GALVANIZED. ANCHOR BOLTS, NUTS AND WASHERS SHALL BE
SHALL BE AASHTO M270 GRADE 50W AND SHALL NOT BE
FOR AASHTO M270 GRADE 50W STRUCTURAL STEEL, SOLE PLATE
THE SEVERAL PAY ITEMS.
THE PAYMENT FOR THE PIPE SLEEVES SHALL BE INCLUDED IN
REQUIREMENTS OF ASTM D1785.
PLASTIC PIPE. THE PVC PLASTIC PIPE SHALL MEET THE
THE 2'' • PIPE SLEEVE SHALL BE CUT FROM SCHEDULE 40 PVC
BURRED WITH A SHARP POINTED TOOL.
• TURN. THE THREAD OF THE NUT AND BOLT SHALL THEN BE
ARE TO BE TIGHTENED FINGER TIGHT AND THEN BACKED OFF
AT ALL FIXED POINTS OF SUPPORT, NUTS FOR ANCHOR BOLTS 1'-5''HOLES
À 1 •'' •
10"
5"5"
10"
5"5"1'-11''3"10"
5"5"
10"
5"5"
SLOTS
À 2 Œ'' X 5''1‚"1‚"3"7/19
( 6 REQ'D )
P1 FIX.
( 6 REQ'D )
P2 EXP.
( 6 REQ'D )
E1
( 6 REQ'D )
E2
105 k
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
3'-9"
SUPERSTRUCTURE
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 3/19
MGC
1'-4"4'-6"4'-6"7'-8ƒ"7'-8ƒ"7'-8ƒ"4'-6"4'-6"
4'-6"4'-6"7'-8ƒ"7'-8ƒ"7'-8ƒ"4'-6"4'-6"
1'-4"
1'-4"1'-4"
17'-8‹"17'-7ƒ"17'-8‹"
17'-8‹"17'-7ƒ"17'-8‹"
4'-2Ž"5'-9Ž"
4'-2Ž"5'-9Ž"15'-0"15'-0"44 #4 S2 @ 1'-0" CTS.
44 #4 S2 BARS @ 1'-0" CTS.
-L-
(2-BAR RUN)
IN CURB & END POST
2 #4 B12 BARS
(2-BAR RUN)
IN CURB & END POST
2 #4 B12 BARS
(2-BAR RUN)
IN CURB & END POST
2 #4 B12 BARS
(2-BAR RUN)
IN CURB & END POST
2 #4 B12 BARS
IN CURB (2-BAR RUN)
2 #4 B12 BARS
IN CURB (2-BAR RUN)
2 #4 B12 BARS
{ POST ANCHOR ASSEMBLY
{ POST ANCHOR ASSEMBLY
ANCHOR ASSEMBLY
@ 6" CTS. EACH
6 #5 A10 BARS
ANCHOR ASSEMBLY
@ 6" CTS. EACH
6 #5 A10 BARS
5 SPA.
(TYP.)
@ 6" CTS.
5 SPA.
(TYP.)
@ 6" CTS.
(TYP.)
MAT'L. IN CURB
{ •" EXP. JT.
(TYP.)
MAT'L. IN CURB
{ •" EXP. JT.
LINE
GUTTER 10"10"ASSEMBLY
{ POST ANCHOR
ASSEMBLY
{ POST ANCHOR
S-17
3" (TYP.)
3" (TYP.)
3" (TYP.)
3" (TYP.)1'-7" CURB1'-7" CURBSTAGE II STAGE I 30'-0" (OUT TO OUT)END BENT 1
FILL FACE AT
END BENT 2
FILL FACE AT
32" ALASKA RAIL
PLAN OF CURB FOR
PLAN OF CURB FOR 32" ALASKA RAIL
7/19
7/19
SHEET 1 OF 2
3'-9"
3'-9"3'-9"
END POST END POST
END BENT 2
{ JOINT @
END BENT 1
{ JOINT @
END POST END POST
NOTE: #4 S2, #4 S3, & #5 A10 BARS ARE INCLUDED IN THE SUPERSTRUCTURE BILL OF MATERIAL
LINE
GUTTER
SHEET 2 OF 2
SEE END POST DETAILS,
CHORD
53'-0†" ({ JOINT @ END BENT 1 TO { JOINT @ END BENT 2)
42
2'-10•"1'-9"1'-7"2" CLR.ANCHOR ASSEMBLY
{ GUARDRAIL
8•"JT.
CONST.CURB(EA. FACE)@ 7•" CTS.2 #4 B12
#7 E1
2'-2"8•"1'-9"2'-2"2'-10•"4"10"4"5•"2•"
ANCHOR ASSEMBLY
{ GUARDRAIL(EA. FACE)@ 7•" CTS.1'-0" CTS.
#4 S2 @
RAIL BRACKET
{ CONC. INSERTS FOR
(EA. FACE)
(EA. FACE)
#6 "F"
ELEVATION
CURB AND END POST FOR 32" ALASKA RAIL
END VIEW
PLAN OF CURB PLAN OF END POST
SLIGHTLY TO AVOID GUARDRAIL ANCHOR ASSEMBLY.
REINFORCING STEEL IN END POST MAYBE SHIFTED
3'-9" END POST
3'-9" END POST 1'-6"1"(EA. FACE)
#4 B12
3'-9"
2•"5-#7 E1 @ 9•" CTS.
(EA. FACE)
1'-10"7"1'-6"1"ANCHOR ASSEMBLY
{ GUARDRAIL
RAIL BRACKET
{ CONC. INSERTS FOR
10"
1"
ASSEMBLY
ANCHOR
À POST
ASSEMBLY
POST ANCHOR
À POST AND
POST LOCATION
SIDE VIEW AT
AT EACH POST ASSEMBLY)
(SHOWING ADDITIONAL A10 BARS
6"3"
3"
3"
CHAMFER
CHAMFER
ƒ"
ƒ"
CONST. JT.
S
S
WHEN SLIP FORM IS USED)
(NOTE: OMIT EXP. JT. MAT'L.
PLACE WITH GALVANIZED NAILS.
À •" EXP. JT. MAT'L HELD IN
ELEVATION AT EXPANSION JOINTS IN CURB
SECTION S-S
WHEN SLIP FORM IS USED )
( THIS IS TO BE USED ONLY
AT DAM IN OPEN JOINT
4"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 4/19
MGC
32" ALASKA RAIL
DETAILS FOR
CURB AND END POST
4 #4 S3 @ 1'-0" CTS.2•"
ALASKA
2-#4 B12
1'-6"
1'-7"2•"3"
#5 A102" MIN.5 #4 S3 @ 1'-0" CTS.2•"2" CL.#4 S2 @ 1'-0" CTS.
3"
6 #5 A10 BARS
S-18
(TYP.)
EA. ANCHOR ASSEMBLY)
@ 6" CTS. (TYP.
RAIL CURB SECTION
BAR SIZE TYPE LENGTH WEIGHT
CLASS AA CONCRETE
* EPOXY COATED REINFORCING STEEL
*STRB12
*STRE1
#4
#7
10'-8"
2'-8"
12
22
*STRF1#6 3'-7"8
NUMBER
307 LBS
BILL OF MATERIAL FOR
END POSTS AND CURB STAGE I
86
43
120
3.7 CY8•"ANCHOR PLATE
#4 S2
#4 S2 BAR
4'-2Ž"
#4 B12
CONST. JT.
#6 F1
#6 F2
3"3 #6 "F"1'-0" CTS.
#4 S3 @ 3 #6 "F"CONST. JT.
#7 E1 @ 9•" CTS.
6 #7 E1 @ 9•" CTS.
(EA. FACE)
1'-0" CTS.
#4 S3 @
OR F2
#6 F1
NOTES
*STRF2#6 4'-10"8 58
BAR SIZE TYPE LENGTH WEIGHT
CLASS AA CONCRETE
* EPOXY COATED REINFORCING STEEL
*STRB12
*STRE1
#4
#7
10'-8"
2'-8"
12
22
*STRF1#6 3'-7"8
NUMBER
307 LBS
BILL OF MATERIAL FOR
86
43
120
3.7 CY
*STRF2#6 4'-10"8 58
END POSTS AND CURB STAGE II
10 FEET IN LENGTH.
CONTRACTION JOINTS ARE REQUIRED FOR THOSE SEGMENTS LESS THAN
OF CURB SEGMENTS LESS THAN 20 FEET IN LENGTH AND NO
JOINTS. ONLY ONE CONTRACTION JOINT IS REQUIRED AT MIDPOINT
SHALL BE LOCATED AT EACH THIRD POINT BETWEEN CURB EXPANSION
825-10(B) OF THE STANDARD SPECIFICATIONS. A CONTRACTION JOINT
ALL EXPOSED FACES OF THE CURB AND IN ACCORDANCE WITH ARTICLE
GROOVED CONTRACTION JOINTS, •'' IN DEPTH, SHALL BE TOOLED IN
REQUIRED.
IS 18.6 KIPS. FIELD TESTING FOR THE ADHESIVE BONDING SYSTEM IS NOT
SYSTEM, AFTER SAWING THE JOINT. THE YIELD LOAD FOR THE #4 S3 BARS
THE #4 S3 BARS SHALL BE INSTALLED, USING AN ADHESIVE ANCHORING
ALL REINFORCING IN THE CURB AND END POSTS SHALL BE EPOXY COATED.
THE CURB.
THE JOINT IN THE DECK SHALL BE SAWED PRIOR TO THE CASTING OF
STRENGTH OF 3000 PSI.
IN THE SLAB HAS BEEN CAST AND HAS REACHED A MINIMUM COMPRESSIVE
THE CURB AND END POST SHALL NOT BE CAST UNTILL ALL CONCRETE
7/19
7/19
SHEET 2 OF 2
{ JOINT
1'-7"{ JOINT
1'-7"THE CONST. JT.
11" MIN. ABOVE
TO PROJECT
ANCHOR BOLTS
X 1'-8"
4- ‡" ~
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
ELEVATION
NOTE : FOR ATTACHMENT OF METAL RAIL TO END POST, SEE STANDARD NO. BMR9.
1'-4"1'-4"
10'-0" MAX
CURB
10•"
SEE ``RAIL POST SPACINGS AND END OF RAIL DETAILS'' SHEET
SPLICE NOT
@ EXP. JT.
1"
NOTES
GENERAL NOTES
BE SPLICED AS DETAILED. PANEL LENGTHS OF RAIL SHALL BE ATTACHED TO A MINIMUM OF THREE POSTS.
RAILING SHALL BE CONTINUOUS FROM END POST TO END POST OF BRIDGE. EACH JOINT IN RAIL LENGTH SHALL
CERTIFIED MILL REPORTS ARE REQUIRED FOR RAILS AND POSTS. SHOP INSPECTION IS NOT REQUIRED.
METAL RAIL POSTS SHALL BE SET NORMAL TO CURB GRADE.
SHIMS SHALL BE USED AS NECESSARY FOR POST ALIGNMENT.
APPEARANCE OF THE POST, BUT REMAINS VISIBLE AFTER RAIL PLACEMENT.
ON EACH POST. THE METHOD OF MARKING AND LOCATION SHALL BE SUCH THAT IT DOES NOT DETRACT FROM THE
TO INSURE FUTURE IDENTIFICATION OF THE FABRICATOR, A PERMANENT IDENTIFYING MARK SHALL BE PLACED
GALVANIZED STEEL RAILS
MATERIAL AND GALVANIZING ARE TO CONFORM TO THE FOLLOWING SPECIFICATIONS:
SPECIFICATIONS TT-P-641.
RICH PAINT MEETING THE REQUIREMENTS OF FEDERAL SPECIFICATION MIL-P-26915 USAF TYPE 1, OR OF FEDERAL
THE CUT ENDS OF GALVANIZED STEEL RAILING, AFTER GRINDING SMOOTH SHALL BE GIVEN TWO COATS OF ZINC
LIN. FT.
ARE REQUIRED FOR THOSE SEGMENTS LESS THAN 10 FEET IN LENGTH.
REQUIRED AT MIDPOINT OF CURB SEGMENTS LESS THAN 20 FEET IN LENGTH AND NO CONTRACTION JOINTS
BE LOCATED AT EACH THIRD POINT BETWEEN CURB EXPANSION JOINTS. ONLY ONE CONTRACTION JOINT IS
AND IN ACCORDANCE WITH ARTICLE 825-10(B) OF THE STANDARD SPECIFICATIONS. A CONTRACTION JOINT SHALL
GROOVED CONTRACTION JOINTS, •" IN DEPTH, SHALL BE TOOLED IN ALL EXPOSED FACES OF THE CURB
LOCKWASHERS, AND NUTS.
THE RAIL SECTIONS SHALL BE ATTACHED TO THE POSTS BY TWO THREADED ƒ" ~ WELDED STUDS, PLATE WASHERS,
STEEL-GALVANIZED TO AASHTO M111.
POST, POST BASES, ANCHOR PLATES AND RAIL SPLICE TUBES: AASHTO M270 GRADE 36 STRUCTURAL
FOR END OF RAIL TO CLEAR FACE OF CONCRETE END POST DIMENSION, SEE STANDARD NO. BMR9.
GENERAL NOTES AND THE FOLLOWING SPECIFICATIONS. ALUMINUM RAIL WILL NOT BE AN OPTION.
METAL RAIL SHALL BE GALVANIZED STEEL IN ACCORDANCE WITH THE REQUIREMENTS OF THE
RAILS: ASTM A500 GRADE B - GALVANIZED TO AASHTO M111.
WELDED RAIL STUDS: ASTM A108-GALVANIZED TO AASHTO M111.
CURVATURE IN A UNIFORM MANNER ACCEPTABLE TO THE ENGINEER.
IN THE FIELD. IN EITHER EVENT, THE RAIL SHALL CONFORM WITHOUT BUCKLING OR KINKING TO THE REQUIRED
THE CONTRACTOR MAY, AT HIS OPTION, HAVE THE REQUIRED CURVATURE IN THE RAIL FORMED IN THE SHOP OR
CURVED RAIL USAGE: WHERE RAILS ARE TO BE USED ON BRIDGES ON HORIZONTAL AND/OR VERTICAL CURVATURE
TO AASHTO M111.
ASTM A563 DH, AND WASHERS TO ASTM F436,TYPE 1. ANCHOR BOLTS, NUTS AND WASHERS SHALL BE GALVANIZED
HIGH STRENGTH ANCHOR BOLTS SHALL CONFORM TO ASTM F1554 GRADE 105. HEAVY HEX NUTS SHALL CONFORM TO
FOR 32" ALASKA RAIL, SEE THE STANDARD SPECIFICATIONS.
6•"
SIDE ELEVATIONFRONT ELEVATION 2"6"
8"1'-11"DETAILS OF POST1'-11"1'-2"2•"W 8 X 24
2"
2"
IN FLANGE
SLOTS
HORIZONTAL
1" X 1•"
RAIL SPLICE DETAILS
‰"4‚"*
*
4‚"
‰"
‚" } (TYP.)
(TYP.)
5•"5"
PLATE WASHER
2„"
‡"‡"‡"1ƒ"1‚"
‡" ~ HOLE‚"2„"
PLAN
ELEVATION
TUBE
RAIL SPLICE
* *
1'-6"1"8•"7•"1'-2"ANCHOR PLATE DETAILS
POST BASE DETAILS
ANCHOR PLATE
(LEVEL)
CONST. JT.
POST BASE
1'-0"4•"4•"1•"1•"PLAN 1'-0"ROADWAY FACE
Š"6"POST ATTACHMENT DETAIL
{ PLATE
6"W 8 X 24 POST
{ PLATE &
5"5"1•"1•"
1'-1"1'-1"
6•"6•"
PLAN
6" ~ HOLE …"1•"1"FRONT ELEVATION
1•"5"5"
{ PLATE
SECTION THRU RAIL 1'-0"4•"4•"1•"1•"{ PLATE
5"5"1•"1•"
1'-1"
1•"1•"
1'-1"
5"5"
{ PLATE
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
ELEVATION
10"
DRAWN BY : RWW 7/14
~ HOLES
{ 1„"
IN TWO PLACES (TYP.)
ANCHOR BOLT HEAD
PLATE TO EACH
TACK WELD ANCHOR
1'-7"
POST
À W 8 X 24
{ HSS 5 X 5 X Š"
{ HSS 5 X 5 X Š"
HOLES
{ 1" ~
CHECKED BY : TMG 7/14
MAA/THCREV. 12/17
MAA/THCREV. 5/18
STANDARD
32" ALASKA RAIL
SHEET 1 OF 2
STD. NO. BMR8
1'-1"
NMW 4/19
MGC S-19
THE CONST. JT.
11" MIN. ABOVE
TO PROJECT
ANCHOR BOLTS
x 1'-8"
4- ‡" ~
METAL RAIL LENGTH
7/19
87.71
* * -1" FOR SPLICE NOT AT EXPANSION JOINT.
EDGES PRIOR TO GALVANIZING TO ASSURE FIT.
TO MATCH INSIDE OF METAL RAIL. GRIND ALL
* - DIMENSION AFTER GRINDING RADIUS ON CORNERS
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : RWW 7/14
CHECKED BY : TMG 7/14
MAA/THCREV. 12/17
MAA/THCREV. 5/18 (TYP.)2•"2•"À POST
2" (TYP.)
4"
2" (TYP.)
{ HSS 5 X 5 X Š"
RAIL STUD DETAILS
‰"
TYP.
SLOTTED HOLES
2- ‡" X 2"
METAL RAIL
1•"
6"8"•"4‹"4‚"Š"4‚"1‡"2"7"
9"2"4"2"8"1‡"2"INSERT TUBE
METAL RAIL
INSERT TUBE
METAL RAIL
THE METAL RAIL INSERT TUBE SHALL BE FABRICATED FROM ‚" PLATES.7"À RAIL POST
1'-4"
4•''
END POST
FACE ROADWAY
2"
RAIL SECTION
ATTACHMENT BRACKET
METAL RAIL
ELEVATION
PLAN
RAIL SECTION
AND 2'' O.D.WASHER
ƒ'' • X 1†'' BOLT
CONCRETE INSERT,
À ƒ" STRUCTURAL
RAIL STUDS
ƒ" ~ WELDED
RAIL STUDS
2-ƒ" ~ WELDED 1'-7"APPROX.4''FERRULE
ELEVATIONPLAN
*
STRENGTH OF THE WIRE.
FERRULE SHALL DEVELOP THE TENSILE
* EACH WELDED ATTACHMENT OF WIRE TO
CLOSED-END
FERRULECONTACT POINTS )
R.P.W.( TYP.ALL
WIRE STRUT
.375'' ~
PLAN OF RAIL POST SPACINGS
NOTES
STRUCTURAL CONCRETE INSERT
METAL RAIL TO END POST CONNECTION
NOTES
A.
B.
C.
A.
B.
FERRULES SHALL ENGAGE A ƒ''• X 1†'' BOLT WITH 2'' O.D. WASHER IN PLACE. THE ƒ''• X 1†'' BOLT
SHALL HAVE N. C. THREADS.
THE ƒ'' STRUCTURAL CONCRETE INSERTS WITH BOLTS SHALL BE ASSEMBLED IN THE SHOP.
THE ADHESIVE BONDING SYSTEM IS NOT REQUIRED.
THAT APPLY TO THE ƒ'' • X 1†'' BOLTS SHALL APPLY TO THE ƒ'' • X 6•'' BOLTS. FIELD TESTING OF
BOLTS WITH WASHERS SHALL BE REPLACED WITH ƒ'' • X 6•'' BOLTS AND 2'' O.D. WASHERS. ALL SPECIFICATIONS
CONCRETE INSERT EMBEDDED IN THE END POST. IF THE ADHESIVE BONDING SYSTEM IS USED, THE ƒ'' • X 1†''
THE CONTRACTOR, AT HIS OPTION, MAY USE AN ADHESIVE BONDING SYSTEM IN LIEU OF THE STRUCTURAL
EACH STRUCTURAL CONCRETE INSERT ASSEMBLY SHALL CONSIST OF THE FOLLOWING COMPONENTS:
EACH METAL RAIL TO END POST CONNECTION SHALL CONSIST OF THE FOLLOWING COMPONENTS:
ƒ'' STRUCTURAL CONCRETE INSERTS SHALL HAVE A WORKING LOAD SHEAR CAPACITY OF 4800 LBS. THE
A MINIMUM TENSILE STRENGTH OF 90,000 PSI IS ACCEPTABLE.
SHALL HAVE A MINIMUM TENSILE STRENGTH OF 100,000 PSI. AS AN OPTION, A ‹'' ~ WIRE STRUT WITH
WIRE STRUT SHOWN IN THE STRUCTURAL CONCRETE INSERT DETAIL IS THE MINIMUM ALLOWABLE SIZE AND
SHALL BE APPROVED BY THE ENGINEER.)
CONFORM TO OR EXCEED THE MECHANICAL REQUIREMENTS OF ASTM A307. THE USE OF THIS ALTERNATE
MAY BE USED AS AN ALTERNATE FOR THE ƒ'' ~ X 1†'' GALVANIZED BOLT AND WASHER. THEY SHALL
AND WASHER SHALL BE GALVANIZED. ( AT THE CONTRACTOR'S OPTION, STAINLESS STEEL BOLT AND WASHER
1 - ƒ'' • X 1†'' BOLT WITH WASHER. BOLT SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307. BOLT
SHALL HAVE A MINIMUM LENGTH OF THREADS OF 1•''.
FERRULE SHALL BE MADE FROM STEEL MEETING THE REQUIREMENTS OF AASHTO M169, GRADE 12L14 AND
AND SHALL BE GALVANIZED AFTER FABRICATION TO AASHTO M111.
•'' METAL BRACKET PLATE AND ‚" METAL RAIL INSERT TUBE SHALL CONFORM TO AASHTO M270 GRADE 36
COMPLETE IN PLACE SHALL BE INCLUDED IN THE VARIOUS PAY ITEMS.
THE COST OF THE ƒ'' STRUCTURAL CONCRETE INSERT, THE •'' BRACKET PLATES, AND THE RAIL INSERT TUBES
STANDARD
END OF RAIL DETAILS
AND
RAIL POST SPACINGS
FOR 32" ALASKA RAIL
SHEET 2 OF 2
STD. NO. BMR9
NMW
MGC
4/19
S-20
END POST END POST
3'-9"4'-6"4'-6"7'-8ƒ"7'-8ƒ"7'-8ƒ"4'-6"4'-6"1'-4"1'-4"3'-9"
END POST END POST
1'-4"3'-9"4'-6"4'-6"7'-8ƒ"7'-8ƒ"7'-8ƒ"4'-6"4'-6"1'-4"
PLAN - RAILS AND END POST
STRUCTURAL CONCRETE
INSERT
METAL RAIL ATTACHMENT BRACKET
8 RAIL POSTS SPACED AS SHOWN
8 RAIL POSTS SPACED AS SHOWN
7/19
LEFT SIDE (STAGE I)
RIGHT SIDE (STAGE II) 1'-7"3'-9"1'-7"42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
FOR METAL RAILS
DETAILS
GUARDRAIL ANCHORAGE
STANDARD
STD. NO. GRA3
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
DRAWN BY : MAA 5/10
CHECKED BY : GM 5/10
REV. 1/15 MAA/TMG
REV. 12/17 MAA/THC
REV. 5/18 MAA/THC
NMW
MGC
4/19
PLAN
GUARDRAIL ANCHOR ASSEMBLY DETAILS
END VIEW
À GUARDRAIL
ANCHOR ASSEMBLY
11"1'-6"À 1ˆ" ~ HOLES (TYP.)
‚" HOLD-DOWN }
ASSEMBLY
ANCHOR
À GUARDRAIL
1‚" ~ HOLE (TYP.)3•"3Ž"3Ž"3•"ANCHOR ASSEMBLY
À GUARDRAIL
4"4"3 •"3 Ž"3 Ž"3 •"WASHERS (TYP.)
WITH ROUND
{ ‡" ~ X 1'-9" BOLT
1'-7"
‚" HOLD-DOWN }
* LOCATION OF GUARDRAIL ATTACHMENT
SKETCH SHOWING POINTS OF ATTACHMENT
1'-10"
4"
4"
ANCHOR ASSEMBLY
{ GUARDRAIL
4"
4"
1'-10"
ANCHOR ASSEMBLY
{ GUARDRAIL
PLAN
LOCATION OF GUARDRAIL ANCHOR AT END POST
(END BENT 1 SHOWN, END BENT 2 SIMILAR)
TO THE SATISFACTION OF THE ENGINEER.
WILL NOT BE PERMITTED. ANY CONCRETE DAMAGED BY THIS WORK SHALL BE REPAIRED
THE 1 ‚'' ~ HOLES SHALL BE FORMED OR DRILLED WITH A CORE BIT. IMPACT TOOLS
CLEAR ASSEMBLY BOLTS.
THE VERTICAL REINFORCING BARS MAY BE SHIFTED SLIGHTLY IN THE END POST TO
COMPLETE IN PLACE, SHALL BE INCLUDED IN THE VARIOUS PAY ITEMS.
THE COST OF THE GUARDRAIL ANCHOR ASSEMBLIES WITH BOLTS, NUTS AND WASHERS
SHARP POINTED TOOL.
AFTER INSTALLATION, THE EXPOSED THREAD OF THE BOLT SHALL BE BURRED WITH A
ATTACHMENT, SEE SKETCH.
GUARDRAIL IS TO BE ATTACHED TO THE END OF THE PARAPET. FOR POINTS OF
THE GUARDRAIL ANCHOR ASSEMBLY IS REQUIRED AT ALL POINTS WHERE APPROACH
THE ENGINEER.
REQUIREMENTS OF ASTM A307. THE USE OF THIS ALTERNATE SHALL BE APPROVED BY
NUTS AND WASHERS. THEY SHALL CONFORM TO OR EXCEED THE MECHANICAL
AND WASHERS MAY BE USED AS AN ALTERNATE FOR THE ‡'' ~ GALVANIZED BOLTS,
BE GALVANIZED. AT THE CONTRACTOR'S OPTION, STAINLESS STEEL BOLTS, NUTS
CONFORM TO THE REQUIREMENTS OF AASHTO M291. BOLTS, NUTS AND WASHERS SHALL
BOLTS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307 AND NUTS SHALL
WITH AASHTO M111.
FABRICATION, THE HOLD-DOWN PLATE SHALL BE HOT-DIP GALVANIZED IN ACCORDANCE
THE HOLD-DOWN PLATE SHALL CONFORM TO AASHTO M270 GRADE 36. AFTER
7 - ‡'' ~ BOLTS WITH NUTS AND WASHERS.
THE GUARDRAIL ANCHOR ASSEMBLY SHALL CONSIST OF A ‚'' HOLD DOWN PLATE AND
NOTES
S-21
END VIEW
(32" ALASKA RAIL)
1'-7"
ASSEMBLY
ANCHOR
À GUARDRAIL
1'-9"6/19
@ EB 1
{ JOINT
@ EB 1
{ JOINT
@ EB 2
{ JOINT
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
SUPERSTRUCTURE
BILL OF MATERIAL
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
NMW 6/19
MGC
MGC
BAR NO.SIZE TYPE LENGTH WEIGHT
STR.
STR.
STR.
STR.
A101
STR.
A102
STR.
A103
STR.
A104
STR.
A105
STR.
A106
STR.
A107
STR.
A108
STR.
A109
STR.
A110
STR.
A111
STR.
A112
STR.
A113
STR.
A114
STR.
A115
STR.
A116
STR.
A117
STR.
A118
STR.
A119
STR.
A120
STR.
A121
STR.
A122
STR.
A123
STR.
A125 STR.
A124
STR.
A126
STR.
A127
A128
BAR NO.SIZE TYPE LENGTH WEIGHT BAR NO.SIZE TYPE LENGTH WEIGHT
STR.
STR.
*
A201
A202
A203
A204
A205
A206
A207
A208
A209
A210
A211
A212
A213
A214
A215
A216
A217
A218
A219
A220
A221
A222
A223
A224
A225
A226
A227
A228
B1
B2
STR.G1
K1
K2
K3
S1
#5 16'-3"
#5 16'-3"1,237
2 33#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
15'-4"
14'-4"
13'-4"
12'-4"
11'-4"
10'-4"
9'-10"
9'-4"
8'-10"
8'-4"
7'-10"
7'-4"
6'-10"
6'-4"
5'-10"
5'-4"
4'-10"
4'-4"
3'-10"
3'-4"
2'-10"
2'-4"
26
25
24
23
22
21
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
STR.
STR.
#5
#5
26 #4*
22 52'-5"1,203
2 #5 48*
*
*
*
*
1
2
2
3
13'-7"
13'-1"
4'-2"
6
6
6
28 #4
TOTAL EPOXY-COATED REIN. STEEL:
TOTAL REINFORCING STEEL:2,971 LBS.
4,717 LBS.
A1
A2
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*27'-3"473
BAR TYPES
5'-2"
1'-9"9"2
1
ALL BAR DIMENSIONS ARE OUT TO OUT
4
OVER GIRDER
THIS LEG
3'-8"
K2, K3
K2, K3 5'-2"K2
K3
5'-2"
4'-8"
6"
1'-8"
3
73 1,237
73
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
15'-10"
32
14'-10"31
30
13'-10"29
28
12'-10"27
11'-10"
10'-10"
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
15'-10"33
15'-4"
14'-4"
13'-4"
12'-4"
11'-4"
10'-4"
9'-10"
9'-4"
8'-10"
8'-4"
7'-10"
7'-4"
6'-10"
6'-4"
5'-10"
5'-4"
4'-10"
4'-4"
3'-10"
3'-4"
2'-10"
2'-4"
26
25
24
23
22
21
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
32
14'-10"31
30
13'-10"29
28
12'-10"27
11'-10"
10'-10"
#5
STR.D1 5'-11"1,671#6*188
22'-11"
#5
#5
#5
9'-7"60
82
S-229"16'-7" STAGE IW.P. #2
W.P. #1
-L-
SHEET 1 OF 2
1'-1"
S1, S2
S2
S1 S1S2S1
S2
4'-6"6"#5 5'-0"*48A10 4 250
S2*4'-10"44
S3*2'-6"18 #4 30
#4
9'-5"4'-0" STAGE IIICHORD
53'-0†"
CONST. JT.
END BENT 1
@ FILL FACE
END BENT 2
@ FILL FACE
CONST. JT.
END BENT 2
{ JOINT @
END BENT 1
{ JOINT @STAGE IICLOSURE POUR30'-0" (OUT TO OUT)(STAGE III = 212 SQ. FT.)
(STAGE II = 500 SQ. FT.)
(STAGE I = 880 SQ. FT.)
7/19
7/19
6"
1'-0"1'-1•"9"STAGE I REINFORCING BAR SCHEDULE
*
85
3
STR.
78
142
OF SUPERSTRUCTURE
OUTSIDE EDGE
OF SUPERSTRUCTURE
OUTSIDE EDGE
(TOTAL SQ. FT. = 1,592)
REINFORCED CONCRETE DECK SLAB
LAYOUT FOR COMPUTING AREA OF1'-7"135° 00' 00"
(TO CHORD)
42
BAR
SIZE
SUPERSTRUCTURE
PARAPET
AND
BARRIER
RAIL
#4
#5
#6
#7
EXCEPT APPROACH
AND BARRIER RAIL
SLABS, PARAPET,
1'-9"
2'-2"
2'-7"
3'-6"
EPOXY
COATED UNCOATED
EPOXY
COATED UNCOATED
APPROACH SLABS
2'-9"
3'-5"
4'-4"
2'-0"2'-0"
2'-6"2'-6"
3'-0"3'-10"
5'-3"
SUPERSTRUCTURE REINFORCING STEEL
LENGTHS ARE BASED ON THE
FOLLOWING MINIMUM SPLICE LENGTHS
1'-9"
2'-2"
2'-7"
#8 4'-7"6'-10"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
SUPERSTRUCTURE
BILL OF MATERIAL
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
NMW 6/19
MGC
MGC
BAR NO.SIZE TYPE LENGTH WEIGHT
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
REINFORCING BAR SCHEDULE
BAR NO.SIZE TYPE LENGTH WEIGHT BAR NO.SIZE TYPE LENGTH WEIGHT
STR.
STR.
B1
B2
STR.G2
K4
K5
K6
S1
#5 9'-1"
#5 9'-1"
2 18#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
8'-3"
7'-3"
6'-3"
5'-3"
4'-3"
3'-3"
2'-9"
2'-3"
11
10
9
8
7
6
5
14 #4*
12 52'-5"
2 #5 27*
*
*
*
*
2
2
1
3
8'-5"
7'-0"
4'-2"
6
6
6
8 #4
TOTAL REINFORCING STEEL:
A3
A4
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*27'-3"255
TOTAL
STEEL (LBS.)
REINFORCING
BAR TYPES
2
1
ALL BAR DIMENSIONS ARE OUT TO OUT
OVER GIRDER
THIS LEG
K4, K5
4'-8"
87
87
2
2
2
2
2
2
2
2
2
2
2
2
2
17
16
15
14
13
12
#5
STR.D1 #6*188
12'-10"
#5
#5
#5
10'-6"66
44
22
S-239"K5
K4, K5K49"824
824
A301
A302
A303
A304
A305
A306
A307
A308
A309
A310
A311
A312
A313
A314
8'-9"
7'-9"
6'-9"
5'-9"
4'-9"
3'-9"
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
STR.
2 18#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
#5
8'-3"
7'-3"
6'-3"
5'-3"
4'-3"
3'-3"
2'-9"
2'-3"
11
10
9
8
7
6
5
2
2
2
2
2
2
2
2
2
2
2
2
2
17
16
15
14
13
12
A401
A402
A403
A404
A405
A406
A407
A408
A409
A410
A411
A412
A413
A414
8'-9"
7'-9"
6'-9"
5'-9"
4'-9"
3'-9"
656
5'-11"1,671
53
TOTAL REINFORCING STEEL:1,641 LBS.
3,581 LBS.
STR.
STR.
B1
B2
6 #4*
6 52'-5"
27'-3"109
#5 328
131 LBS.
328 LBS.
CONCRETE
CLASS AA
STAGE I
STAGE II
STAGE III
BILL OF MATERIAL
SUPERSTRUCTURE
QUANTITIES FOR CLOSURE POUR ARE INCLUDED IN STAGE III
QUANTITIES FOR CURB AND END POSTS ARE NOT INCLUDED.
GROOVING BRIDGE FLOORS
BRIDGE DECK
APPROACH SLABS
STAGE I
STAGE II
STAGE I
TOTAL
328 131
1,641 3,581
2,971 4,717
8,4294,940
SHEET 2 OF 2
707 SQ. FT.
317 SQ. FT.
185 SQ. FT.
1,750 SQ. FT.
27.5
18.2
7.6
53.3
6"
1'-8"
3
1'-1"
S1, S2
S2
S1 S1S2S1
S2
4
4'-6"6"#5 5'-0"*48 250A104
S1*3 4'-2"12 #4
S2*4'-10"44
S3*2'- 6"18 #4 30
#4
STAGE II STAGE III
3'-8"
2'-7"
1'-9"
2'-7"
2'-7"
6"
1'-0"9"1'-1•"*
33
3
STR.
142
*
7/19
7/19
STEEL (LBS.)
REINFORCING
EPOXY COATED
STAGE II & STAGE III 541 SQ. FT.
TOTAL EPOXY COATED REIN. STEEL:
TOTAL EPOXY COATED REIN. STEEL:
BAR
SIZE
SUPERSTRUCTURE
PARAPET
AND
BARRIER
RAIL
#4
#5
#6
#7
EXCEPT APPROACH
AND BARRIER RAIL
SLABS, PARAPET,
1'-9"
2'-2"
2'-7"
3'-6"
EPOXY
COATED UNCOATED
EPOXY
COATED UNCOATED
APPROACH SLABS
2'-9"
3'-5"
4'-4"
2'-0"2'-0"
2'-6"2'-6"
3'-0"3'-10"
5'-3"
SUPERSTRUCTURE REINFORCING STEEL
LENGTHS ARE BASED ON THE
FOLLOWING MINIMUM SPLICE LENGTHS
1'-9"
2'-2"
2'-7"
#8 4'-7"6'-10"
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 1 OF 4
NOTES
S-24
7'-7"22'-0"
22'-4„"2'-6"1'-6"1'-0"1'-3"FILL FACE
W.P. 1
1'-9" TO{ OF PILES2'-3Œ" TO{ OF BRG.4'-0" TOPILES{ OF SHEET -L-
CHORD
5'-0"1'-0"2'-6"1'-6"PLAN
STAGE I
END BENT 1
56'-4" (STAGE I AND STAGE II)
29'-7" (STAGE I)
W2
21-PZ27 STEEL SHEET PILES
WORK LINE
ELEVATION
(TYP.)
EMBEDMENT
1'-0" MIN. X X X X
(TYP.)
CONST. JT.
4'-10"1'-8"2'-6"1'-6"{ HP 12 x 53 STEEL PILES
@ 5'-0" CTS.
(TYP. EA. PILE)
2-#4 S3
EL. 2008.78
EL. 2008.66
EL. 2008.42
EL. 2008.54
EL. 2008.18
EL. 2008.30
EL. 2008.18
EL. 2010.36
EL. 2011.06 1'-0"6 754 & BACKWALL
OF WING
UPPER PART
POUR #2
1'-0" PROJ. TYP.
A
A
X
6'-6"6'-6"6'-6"6'-6"
82"6"10 #4 U1 BARS
@ 1'-6" CTS.
2'-7" PROJ.
4-#4 B12
9"9"
9"
6 #5 S1 & S2
BAY 4 BAY 5 BAY 6 BAY 7
#5 S1 & S2
6'-0Š"
DETAIL "B"
PZ27
PZ135
4"
4"
1'-6"
(TYP.)
(TYP.)
(TYP.)
AS SHOWN.
SHEET PILE CONNECTION
WELDED TO EVERY OTHER
ƒ" ~ x 5" ANCHOR STUDS
ANCHOR STUD DETAIL
SEE DETAIL "B"
(BAYS 4 THRU 7)
@ 1'-0" CTS.
9"
3 #5 S1 & S2
3'-2" PROJ.#5 B14 BARS
#5 B14 BARS
3"
(SHEET 4 OF 4)
SEE DETAIL "A"{ BM. 4
{ BM. 5
{ BM. 6
22'-0"
9'-1‡"BACKWALL8'-7‚"9'-5„"9‡"
7'-7"20'-0‹"
2'-6"
(TYP.)
3'-6"
(TYP.)
27 #4 U2 @ 1'-0" CTS.CL.3" HIGH BEAM BOLSTERS
21'-7Ž"29'-7"
30 - #5 S8 @ 1'-0" CTS.
TO CHORD
135°00'00"
FOR WING DETAILS, SEE SHEET 3 OF 4.
CAST IF SLIP FORMING IS USED.
SHALL BE POURED AFTER THE CONCRETE CURB IS
THE CONCRETE IN THE SHADED AREA OF THE WING
FACE AT THE RATE OF 2%.
TRANSVERSELY FROM THE FILL FACE TO THE BACK
THE BRIDGE SEAT BUILDUPS SHALL BE SLOPED
THE TOP SURFACE OF THE END BENT CAP EXCEPT
BE USED.
MEMBRANE CURING COMPOUND METHOD SHALL NOT
STANDARD SPECIFICATIONS EXCEPT THAT THE
SHALL BE CURED IN ACCORDANCE WITH THE
THE TOP SURFACE AREAS OF THE END BENT CAP
THE EPOXY PROTECTIVE COATING.
BACKWALL SHALL BE PLACED BEFORE APPLYING
FOR PILE SPLICE DETAILS, SEE SHEET 4 OF 4.
NECESSARY TO CLEAR ANCHOR BOLTS.
STIRRUPS IN CAP MAY BE SHIFTED AS 8'-8…"1'-6"12'-6"14'-0"2
5'-
4
Ž"
1
6-PZ2
7 STEEL SHEET PI
LES2
5'-
0"
5'-
0"
2
0'-
0"
1'-0"#5 S5
#5 S4 &
#5 S7
#5 S6 &
37'-4ƒ"
(2'-5" SPLICE)
(2 BAR RUN)
(EA. FACE)
3 #4 B13 BARS
TOP OF WING
EL. 2,012.06
EL. 2,010.87
THRU B4
#9 B1
THRU B8
#9 B5
(3'-0" SPLICE)
(2 BAR RUN)
(EA. FACE)
#5 B9 (MIN.)(LEVEL)
BOTT. OF CAP
EL. 2005.68
2 OF 4)
DETAIL" (SHEET
SEE "SHEAR KEY
2'-0" EXTENSION
#9 B1 THRU B4
(TYP. #9 B5 THRU B8
MECHANICAL COUPLERS
#9 B5 THRU B8
#5 B9 BARS
3'-2" PROJ.
#4 B10 BARS OR
@ 10" CTS.
(2'-5" SPLICE)
(2 BAR RUN)
OVER PILES
4-#4 B10
(8 REQ'D)
#4 B11 @ 4'-0" CTS.
PILES DETAIL", SHEET 4 OF 4.
CLARITY. SEE "CORROSION PROTECTION FOR STEEL
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN FOR
FOR SECTION A-A, SEE SHEET 4 OF 4.
WING & SHEET PILES NOT SHOWN FOR CLARITY.
8/19
8/19
MAT'L.
1" EXP. JT.6'-6"28 #5 V1 @ 1'-0" CTS. (FILL FACE); 27 #5 V1 @ 1'-0" CTS. (FRONT FACE)
22'-4Ž"
(TYP.)
PART OF WING
COLLARS & LOWER
POUR #1 CAP, COPING,1'-0"42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 2 OF 4
STAGE I DETAILS
END BENT 1
(TYP.)
TO CHORD
135°00'00"
W.P. 1
FILL FACE
(TYP.)
TO CHORD
135°00'00"
W.P. 1
FILL FACE
CHORD
-L-
CHORD
-L-
SHEAR KEY DETAIL
SECTION F-F
OF CAP
BOTTOM
OF CAP
BOTTOM
COUPLERS (TYP.)
MECHANICAL
F
F
FACE
FILL
2‚"1ƒ"1'-0"1'-0"1'-3"1'-0"1'-3"1'-0"1'-0"7•"(TYP.)#9 B1
#9 B2
#9 B3
#9 B4
29'-7"
22'-0"7'-7"
2'-0"
3'-6"
29'-7"
22'-0"7'-7"
1'-0"
#9 B6
#9 B7
S-25
#9 B5
#9 B8
#9 "B" BARS - TOP OF CAP
#9 "B" BARS - BOTTOM OF CAP
8/19
8/19
PROJ.
PROJ.
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
SECTION Y-Y
TBE
7/19
WING DETAILS
STAGE I
END BENT 1
1'-0"
1'-5"
FACE
FILL
CONST. JT.
2" CL.
2" CL.
2" CL.1'-6"1'-6"
2'-6"3 SPA. @ 1'-0" CTS.2 SPA. @ 1'-0" CTS.SHEET PILES
{ PZ27 STEEL
2-#5 B15
#5 B15
#4 "V"
SHEET 3 OF 4
S-26
5'-
0"
3'-
6"
2'-
6"
1'-
0"
1'-
6"
3"2'-6"1'-6"1'-0"2" CL.2" CL.7'-3•"
6'-0Š "2"
C
L.
2"
C
L.5 SPA. @ 1'-0" CTS. (EA. FACE)
15 #4 V2 SPACED AS SHOWN
30 #5 S8 @ 1'-0" CTS.
MAT'L.
1" EXP. JT.
#4 K1
#4 "H"FILL FACE
#5 B15
3 SPA. @ 1'-0" CTS.2 SPA. @1'-0" CTS.5 #4 H5 (FRONT FACE)5 #4 H6 (FILL FACE)3"1'-0" SHEET PILEEMBEDMENT3" HIGH B.B. @ 5'-0" CTS.
CONST. JT.1'-0"#4 K1 (EA. FACE)
SHEET PILES
{ PZ27 STEEL
SHEET 1 0F 4
SEE DETAIL B
PLAN OF WING W2
WING DETAILS
ELEVATION OF WING W2
2'-0"
2'-3"
1'-1•"1'-1•"1'-0"(LEVEL)
EL. 2005.68
EL 2012.06
EL 2010.46
6'-8"13'-4"
20 - #4 "V" @ 1'-0" CTS. (EA. FACE)
16 - PZ27 STEEL SHEET PILES
25 - #5 U3 @ 1'-0" CTS.
20'-0"5'-0"
25'-0"
25'-4Ž"
8/19
8/19
STEEL PILE
{ HP 12x53
4"
4"2" CL.
#6 S9
#6 S10
STEEL PILE
{ HP 12x53
#4 H4 (FILL FACE)
#4 H3 (FRONT FACE)7 #4 "H" BARS SPACED AS SHOWN (EA. FACE)7 #4 "H" (EA. FACE)3" HIGH B.B.
STEEL PILE
{ HP 12x53 1'-3"1'-0"1'-0"3"2'-3"#6 S10
3 #6 S9
#6 S9
#6 S10
2 #4 V2
(EA. FACE)
(EACH FACE)
#4 V8
(EACH FACE)
#4 V3
(EACH FACE)
#4 V2
#5 U3 •"POUR #1POUR #2(FIELD BEND)
#4 H2 (FILL FACE)
#4 H1 (FRONT FACE)
(TYP.)
1'-0"1'-5•1'-0•"
3'-6"
#5 U3 (TYP.)
SHEET PILE FOR
MAX. HOLE IN
DRILL 2" ~
#4 V3 BARS THRU #4 V8 (3-BARS PER MARK) (EA. FACE) (SPACED AS SHOWN ABOVE)
TO FIT AROUND STEEL PILE.
BE FIELD CUT AS NECESSARY
* BOTTOM #4 H6 BAR SHALL
*
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 4 OF 4
STAGE I DETAILS
END BENT 1
MINIMUM OF 3- ONE CUBIC
FOOT BAGS OF #78M STONE.
BAGS SHALL BE OF POROUS
FOR DRAINAGE
GRADE TO DRAIN
TOE OF SLOPE
6" ( MIN.) PIPEFABRIC,SECURELY TIED.
BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER.
BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER-
MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS.
NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERAL PAY ITEMS.
TEMPORARY DRAINAGE AT END BENT
BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION
PIPE WILL NOT BE ALLOWED.
STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED
OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED
IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT
(MIN.)SECTION A-A
B1
3'-6"1'-6•"1'-6"•"1'-0"6"5'-0"
1'-0"2'-3"1'-9"
1'-4"1'-1"
STEEL PILES
{ HP 12x53
#4 S3
#9 B5 THRU B8
(OVER PILES)
@ 4" CTS.
4-#4 B10
FACE
FILL 2'-6"1'-0"1'-3"(TYP.)
2" CL.
#5 S2
#4 B11
2" CL.
1'-6"
1'-0"
#5 B14
#5 B14
#5 B9
#5 B9
1'-3"1'-0"1'-3"2" CL.#5 S1
SHEET PILES
{ PZ27 STEEL (MIN.)9"9"3 #4 B13 BARS(EA. FACE)#4 U2
#5 V12" CL. TO#4 U2B.B.
3" HIGH
BILL OF MATERIAL
POUR #1
POUR #2
BAR NO.SIZE TYPE LENGTH WEIGHT
TOTAL CLASS A CONCRETE
1 #9 1
END BENT 1 STAGE I
S-27
#5 B14
1'-0" CTS.
#5 S8 @
B2 1 #9 1
B3 1 #9 1
B4 1 #9 1
B5 1 #9 2 37'-1"126
B6 1 #9 2 35'-9"122
B9 4 #5 20'-8"STR.86
8 #4 19'-2"STR.102
8 #4 3'-2"STR.
4 #4 STR.
12 #4 20'-2"STR.162
3 #5 32'-9"STR.102
3 #5 25'-2"STR.
B12
B13
B14
B15
17
39
79
1 #4 20'-6"14H13
1 #4 21'-2"14H23
4 #4 6'-11"18K1STR.
28 #5 8'-4"S1
28 #5 4'-1"S2
10 #4 6'-6"43S3
1 #5 8'-10"S4
ALL BAR DIMENSIONS ARE OUT TO OUT.
HK.HK.1'-3'' LAP
HK.HK.
BAR TYPES
1'-3"
1'-8" ~2'-1•"8"
4
5
6
19'-9"
7
H1
H2
HK.HK.8
1'-0"5•"5•"4'-8"
6•"
35'-10" B5
3
U1
U2 8"
3'-2"1'-6"2'-3"34'-6" B6
32'-2" B7
30'-9" B8
5•"5•"6'-4"5•"3'-2"
10 #4 6'-2"U1
27 #4 5'-2"93U2
55 #5 4'-4"V1 STR.
19 #4 6'-0"V2 STR.
HP 12 X 53 STEEL PILES
NO: 6
HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
576 SQ. FT.
PILE EXCAVATION IN SOIL
PILE EXCAVATION NOT IN SOIL
18.2 C.Y.
5.4 C.Y.
23.6 C.Y.
REINFORCING STEEL
4 243
5 119
6
4
7
7
1
1'-3"
HK.
1'-3"
HK.2
B10
B11
B7 1 #9 2 33'-5"114
B8 1 #9 2 109
36'-10" B1
35'-2" B2
33'-5" B3
31'-9" B4
37'-8"128
39'-4"134
34'-3"116
122
CLASS A CONCRETE BREAKDOWN
45
60
60
POSITION OF PILE DURING WELDING.
DETAIL B
0'' TO „''
0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS
10°
0°
BACK GOUGE
BACK GOUGE
DETAIL A
DETAIL B
PILE VERTICAL
OR VERTICAL
PILE HORIZONTAL
45+10°-0°DETAIL A
2'-2"U3 1'-2"
1 #5 4'-7"S5 5 5
14'-9"
249
8/19
8/19
(TYP. EACH PILE)
PLAN
COLLAR
CONCRETE
BOTTOM OF CAP
ELEVATION
CONCRETE COLLARS
{ PILES &1'-6"2'-0"
STEEL PILE
{ HP 12 X 53
FILL FACE
2'-0" ~ CONCRETE COLLAR 1'-9"FILL FACE
BOLTS
{ ANCHOR8"4"4"3'-6"2'-3Œ"1'-10"1'-5"8•"8•"BEARING PAD
ELASTOMERIC
1'-10" x 8" x 1ƒ"
{ BRG.
DETAIL "A"
PROJ. 5•" ABOVE CAP
ANCHOR BOLTS TO
1 ƒ'' • x 1'-11•"11"11"S7
5•"5•"3'-8"S5
5•"5•"3'-2"S2 2'-1•"5•"2'-1•"5•" 3'-8"
6'-4"
S1
S4
S6
2'-0"1'-11"2'-0"1'-4"HK.
8"1'-4"1'-1"10
9
H3
H4
H5
H6
20'-6"
15'-7"
16'-9"
1 #4 16'-3"11H33
1 #4 12H43
5 #4 20'-5"68H53
5 #4 21'-7"72H63
1 #5 11'-6"S6 4 12
1 #5 7'-3"S7 5 8
S8
3 #6 3'-1"S9 10 14
1 #6 8'-7"9 13S10
25 #5 5'-6"U3 7
6 #4 5'-9"V3 STR.
6 #4 5'-6"V4 STR.
6 #4 5'-3"V5 STR.
6 #4 5'-0"V6 STR.
6 #4 4'-8"V7 STR.
6 #4 4'-5"V8 STR.
35'-11"
32'-0"
30 #5 6'-7"8 206
9
41
143
76
23
22
21
20
19
18
3,164 LBS.
19'-10"
20'-11"
17'-5"
96 LIN. FT.
NO: 6 EA.
#9 B1 THRU B4
PART OF WING & COPING
CAP, COLLAR, LOWER
59.00 LIN. FT.
30.00 LIN. FT.
{ BEAM
CORROSION PROTECTION FOR STEEL PILES DETAIL
SHEET 1 OF 4
STUD DETAIL",
SEE "ANCHOR
PART OF WING
BACKWALL & UPPER
42
18" GALV. STEEL SHEET PILES
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 1 OF 4
STAGE II
END BENT 1
(TYP.)
TO CHORD
135°00'00"1'-9" TO{ OF PILES2'-3Œ" TO{ OF BRG.4'-0" TOPILES{ OF SHEET PLAN
5'-7•"27'-7…"5'-0"9'-8•"1'-6"27'-7…"7'-7"
7'-7"26'-9" (STAGE II)
17- PZ27 STEEL SHEET PILES1'-3"W.P. 1
FILL FACE
56'-4" (STAGE I AND STAGE II)
XXX
(TYP.)
EMBEDMENT
1'-0" MIN.
(TYP. EA. PILE)
2-#4 S3
@ 5'-0" CTS.1'-0"ELEVATION1'-6"EL. 2008.99
EL. 2009.10EL. 2009.21EL. 2009.09 EL. 2008.87
EL. 2008.98
EL. 2008.87
EL. 2011.37
(TYP.)
CONST. JT.
10'-0"9'-3"12'-1"{ HP 12 x 53 STEEL PILES
1
BAY 1
2 3
BAY 2
(EA. FACE)
3 #4 B32 BARS
EL. 2011.06
2"OVER PILES
4-#4 B29
4-#4 B31
27 - #5 S4 @ 1'-0" CTS.7"
WORK LINE
9"
7•"7•" & BACKWALL
OF WING
UPPER PART
POUR #2
@ 10" CTS.
6"
W1
PZ27
DETAIL "C"
SEE DETAIL "C"
S-28
2'-
6"
1'-
0"
1'-
6"
CHORD
-L-
PZ1352'-10†"7'-6"7 - PZ27 STEEL SHEET PILES10'-4†"15'-1•"
5 #5 S1 & S2
13 #5 S1 & S2 @ 8" CTS.
11 #5 S1 & S2 @ 10•" CTS.
1'-0" CTS.
#5 B33 BARS
SHEET 4 OF 4)
SEE DETAIL "A"
4"
4"
1'-6"
(TYP.)
(TYP.)
(TYP.)
AS SHOWN.
SHEET PILE CONNECTION
WELDED TO EVERY OTHER
ƒ" ~ x 5" ANCHOR STUDS
ANCHOR STUD DETAIL
3"
B
B
3" HIGH BEAM BOLSTERS
9"CL.{ BM. 1
{ BM. 2 { BM. 3
20'-0‹"
4'-4Š"4'-4Š"9'-3ƒ"
2'-6"
(TYP.)(TYP.)
3'-6"
(TYP.)8'-11•"9'-1‡"
13 #5 V3 BARS @ 1'-0" CTS. (EACH FACE)
13 #4 U2 @ 1'-0" CTS.
8/19
8/19
NOTES
FOR WING DETAILS, SEE SHEET 3 OF 4.
CAST IF SLIP FORMING IS USED.
SHALL BE POURED AFTER THE CONCRETE CURB IS
THE CONCRETE IN THE SHADED AREA OF THE WING
FACE AT THE RATE OF 2%.
TRANSVERSELY FROM THE FILL FACE TO THE BACK
THE BRIDGE SEAT BUILDUPS SHALL BE SLOPED
THE TOP SURFACE OF THE END BENT CAP EXCEPT
BE USED.
MEMBRANE CURING COMPOUND METHOD SHALL NOT
STANDARD SPECIFICATIONS EXCEPT THAT THE
SHALL BE CURED IN ACCORDANCE WITH THE
THE TOP SURFACE AREAS OF THE END BENT CAP
THE EPOXY PROTECTIVE COATING.
BACKWALL SHALL BE PLACED BEFORE APPLYING
FOR PILE SPLICE DETAILS, SEE SHEET 4 OF 4.
NECESSARY TO CLEAR ANCHOR BOLTS.
STIRRUPS IN CAP MAY BE SHIFTED AS
PILES DETAIL", SHEET 4 OF 4.
CLARITY. SEE "CORROSION PROTECTION FOR STEEL
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN FOR
FOR SECTION B-B, SEE SHEET 4 OF 4.
WING & SHEET PILES NOT SHOWN FOR CLARITY.
JOINT
CONST.
MAT'L.
1" EXP. JT.
STAGE I
STAGE I
TOP OF WING
EL. 2,013.01
10 #4 U1 @ 1'-6" CTS.
1'-0"
THRU B23
#9 B20
THRU B27
#9 B24
(LEVEL)
BOTT. OF CAP
EL. 2005.68
(3'-0" SPLICE)
(2 BAR RUN)
(EA. FACE)
#5 B28
(7 REQ'D)
#4 B30 @ 4'-0" CTS.
3 #5 S1 & S2
7•"7•"11'-3"5'-2Š"1'-0"BACKWALLJOINT
CONST.LOWER PART OF WING
CAP, COLLARS, COPING
POUR #1 2'-6"1'-0"42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 2 OF 4
STAGE II DETAILS
END BENT 1
FILL FACE
(TYP.)
TO CHORD
135°00'00"
W.P. 1
FILL FACE
(TYP.)
TO CHORD
135°00'00"
W.P. 1
CHORD
-L-
CHORD
-L-
34'-4"
26'-9"7'-7"
34'-4"
26'-9"7'-7"
#9 B25
#9 B26
#9 B20
#9 B21
#9 B22
#9 B23
#9 B27
#9 B24
PROJECT NO.
S-29
8/19
8/19
#9 "B" BARS - TOP OF CAP
#9 "B" BARS - BOTTOM OF CAP
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
WING DETAILS
PLAN OF WING W1
ELEVATION OF WING W1
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
TBE
7/19
WING DETAILS
STAGE II
END BENT 1
3" HIGH B.B. @ 5'-0" CTS.
SECTION Y-Y
1'-0"
1'-5"
1'-0"1'-6"
2'-6"
FACE
FILL
CONST. JT.
B.B.
3" HIGH
2" CL.
2" CL.
2" CL.1'-6"1'-6"
2'-6"3 SPA. @ 1'-0" CTS.3 SPA. @ 1'-0" CTS.8 #4 "H" (FILL FACE)5'-0"
3'-6"
1'-6"2'-6"
1'-0"
7'-6"2'-10†"
2" CL.
2" CL.2'-6"1'-6"1'-0"1'-0"2" CL.2" CL.3"1'-0" SHEET PILEEMBEDMENT14
S
P
A. @
1'-
0"
C
T
S. (
E
A.
F
AC
E)
3
4
#
4 V4
S
P
AC
E
D AS
S
HOWN10 - #5 U3 @ 1'-0" CTS. 6"
7 - PZ27 STEEL SHEET PILES
7 #4 "V" BARS @ 1'-0" CTS. (EA. FACE)
#4 "H"#4 "H"
FILL FACE
#4 K2
MAT'L.
1" EXP. JT.
#5 B15
2
7
#
5
S
4 @
1'-
0"
C
T
S.
Y
Y
SHEET PILES
{ PZ27 STEEL
SHEET PILES
{ PZ27 STEEL
1'-0"3 SPA. @ 1'-0" CTS.3 SPA. @5 #4 H4 (FILL FACE)5 #4 H3 (FRONT FACE)EL. 2013.01
EL. 2010.43
(EA. FACE)
#4 V5
CONST. JT.
15'-
1•
"
14'-
8
‡
"1'-0" CTS.#4 K3
#4 "K" (EA. FACE)
(EA. FACE)
#4 V11
#4 "V"
#4 V5 THRU #4 V11 (EACH FACE)
#5 B15
2-#5 B15
S-30
SHEET 3 OF 4
8/19
8/19 •"11'-3"
(LEVEL)
EL. 2005.68
SHEET 1 0F 4
SEE DETAIL C POUR #1POUR #28 #4 "H" (FRONT FACE)1#5 U3
#5 U3 (TYP.)
SHEET PILE FOR
MAX. HOLE IN
DRILL 2" ~
6'-4"1'-2"
(FIELD BEND)
#4 H6 (FILL FACE)
#4 H5 (FRONT FACE)
#4 H8 (FILL FACE)
#4 H7 (FRONT FACE)
#4 H10 (FILL FACE)
#4 H9 (FRONT FACE)#4 H5 THRU H1010'-4†"
42
FILL FACE
BOLTS
{ ANCHOR8"4"4"3'-6"2'-3Œ"1'-10"1'-5"8•"8•"BEARING PAD
ELASTOMERIC
1'-10" x 8" x 1ƒ"
{ BRG.
DETAIL "A"NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 4 OF 4
STAGE II DETAILS
END BENT 1
MINIMUM OF 3- ONE CUBIC
FOOT BAGS OF #78M STONE.
BAGS SHALL BE OF POROUS
FOR DRAINAGE
GRADE TO DRAIN
TOE OF SLOPE
6" ( MIN.) PIPEFABRIC,SECURELY TIED.
BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER.
BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER-
MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS.
NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERAL PAY ITEMS.
TEMPORARY DRAINAGE AT END BENT
BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION
PIPE WILL NOT BE ALLOWED.
STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED
OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED
IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT
BILL OF MATERIAL
BAR NO.SIZE TYPE LENGTH WEIGHT
1
(MIN.)#9 1
3'-6"1'-6•"1'-6"•"1'-0"6"5'-0"
1'-0"2'-3"1'-9"
1'-4"1'-1"
STEEL PILES
{ HP 12x53
#4 S3
(OVER PILES)
@ 4" CTS.
4-#4 B29
FACE
FILL
1'-0"1'-3"4-#4 B31 BARS
(TYP.)
2" CL.
#4 U1
#4 B30
2" CL.
1'-6"
1'-0"
#5 B33
#5 B33
#5 B28
#5 B28
1'-3"1'-0"1'-3"2" CL.#5 S1
SHEET PILES
{ PZ27 STEEL9"9"3 #4 B32 BARS(EA. FACE)#4 U2
#5 V32" CL. TO#4 U2B.B.
3" HIGH
S-31
#5 B33
1'-0" CTS.
#5 S4 @
ALL BAR DIMENSIONS ARE OUT TO OUT.
HK.HK.1'-3'' LAP
HK.HK.
BAR TYPES
1'-3"
1'-8" ~
4
5
6
7'-2"
7
H3
H4
HK.
8
1'-0"5•"5•"4'-8"
27'-4" B24
3
U3
U2 8"
1'-2"2'-2"26'-1" B26
25'-7" B27
5•"5•"3'-2"5•"3'-2"
POUR #1
POUR #2
TOTAL CLASS A CONCRETE
HP 12 X 53 STEEL PILES
NO: 3
HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
PILE EXCAVATION IN SOIL
PILE EXCAVATION NOT IN SOIL
REINFORCING STEEL
END BENT 1 STAGE II
1
1'-3"
HK.
1'-3"
HK.2
28'-0" B20
27'-6" B21
26'-4" B2345
60
60
POSITION OF PILE DURING WELDING.
DETAIL B
0'' TO „''
0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS
10°
0°
BACK GOUGE
BACK GOUGE
DETAIL A
DETAIL B
PILE VERTICAL
OR VERTICAL
PILE HORIZONTAL
45+10°-0°DETAIL A
SECTION B-B
#5 S2 1'-6"U1 3'-2"
CLASS A CONCRETE BREAKDOWN
4"
26'-11" B22
26'-10" B25
7'-7"2'-9•"8
"
B20 30'-6"104
1 #9 1B21 30'-0"102
1 #9 1B23
1 #9 1B22 29'-5"100
28'-10"98
1 #9 2B24 28'-7"97
1 #9 2B25 28'-1"95
1 #9 2B26 27'-4"93
1 #9 2B27 9126'-10"
4 #5B28 65STR.
4 #4B29 74STR.
7 #4B30 15STR.
B31 4 #4
B32
40STR.
6 #4
B33
STR.
3 #5
B15
86STR.
3 #5 34STR.
5 #4 7'-10"26H33
5 #4 8'-3"28H43
2 #4 14'-8"20K2STR.
2 #4 15'-6"21K3STR.
32 #5 4'-1"S2
6 #4 6'-6"S3
27 #5 6'-7"S4
10 #4 6'-2"U1
5 136
6
8
7
32 #5 9'-8"S1 4
13 #4 4'-4"U2
10 #5 5'-6"57U3
7
7
26 #5 5'-0"V3 STR.
V4 34 #4 7'-0"
V5
STR.
2 #4 6'-11"
V6
STR.
2 #4 9
V7
STR.
2 #4 6'-1"8STR.
2 #4 5'-8"8STR.
2 #4 5'-4"7STR.
2 #4 4'-11"7STR.
2 #4 4'-6"6STR.
3'-2"
112
27'-4"
11'-0"
26
185
41
323
38
159
9
6'-6"
V10
V11
16.8 C.Y.
4.2 C.Y.
21.0 C.Y.
V8
V9HK.8/19
8/19
PROJ. 5•" ABOVE CAP
ANCHOR BOLTS TO
1 ƒ'' • x 1'-11•"11"11"(TYP. EACH PILE)
PLAN
COLLAR
CONCRETE
BOTTOM OF CAP
ELEVATION
CONCRETE COLLARS
{ PILES &1'-6"2'-0"
STEEL PILE
{ HP 12 X 53
FILL FACE
2'-0" ~ CONCRETE COLLAR
CORROSION PROTECTION FOR STEEL PILES DETAIL1'-9"H5 7'-1"
H6 7'-7"
1 #4 7'-9"5H5
1 #4 8'-3"6H63
1 #4 4'-7"3H73
1'-10"15'-8"
27'-8"
27'-11"
2,483 LBS.
#9 B20 THRU B23
#9 B24 THRU B27
H7 3'-11"
H8 4'-3"
H9 6'-3"
6'-9"H10
48 LIN. FT.
14'-11"
1 #4 4'-11"3H83
1 #4 6'-11"5H93
1 #4 7'-5"53
3
H10
136
NO: 3 EA.
29.50 LIN. FT.
15.00 LIN. FT.
PART OF WING & COPING
CAP, COLLARS, LOWER
375 SQ. FT.
{ BEAM
PART OF WING
BACKWALL & UPPER
SHEET 1 OF 4
STUD DETAIL",
SEE "ANCHOR
42
18" GALV. STEEL SHEET PILES
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 1 OF 3
STAGE I
END BENT 2
PLAN
(TYP.)
TO CHORD
135°00'00"
FILL FACE
W.P. 2
S-32
2'-6"29'-0"
33'-0"
2'-6"
1'-0"1'-6"
54'-1" (STAGE I AND STAGE II)
31'-6" (STAGE I)
22 - PZ27 STEEL SHEET PILES
3"32 - #5 S4 @ 1'-0" CTS.
29'-7•"3'-4Š"
-L-
CHORD
1'-6"14'-0"NOTES
1'-6"12'-6"5'-0"8-PZ27 STEEL SHEET PILES 2'-6"20'-0‹"7'-11Œ"
9'-5„"8'-7‚"9‡"
3'-6"
2'-6"
(TYP.)
(TYP.)(TYP.)1'-9" TO2'-3Œ" TO4'-0" TO{ OF PILES{ OF BRG.PILES{ OF SHEET 1'-3"{ BM. 6{ BM. 5
{ BM. 4
SHEET 3 OF 3)
SEE DETAIL "A"
SEE DETAIL "B"
DETAIL "B"
PZ90
PZ27
3'-2" PROJ.
W2
ELEVATION
X X X X X
WORK LINE
@ 5'-0" CTS.2"CL.3"23 #5 V1 @ 1'-0" CTS. (EACH FACE)
EL. 2010.68
EL. 2010.12
EL. 2008.09EL. 2007.97
EL. 2008.33EL. 2008.21
EL. 2008.56
EL. 2008.44
EL. 2007.97
(TYP.)
EMBEDMENT
1'-0" MIN.
(TYP. EA. PILE)
2-#4 S3
6'-6"6'-6"6'-6"6'-6"
6"
{ HP 12 x 53 STEEL PILES
6 754 8
BAY 4 BAY 5 BAY 6 BAY 7
2'-7" PROJ.
#5 "B" BARS
3'-2" PROJ.
#4 "B" BARS OR 1'-6" & BACKWALL
OF WING
UPPER PART
POUR #2
MIN.2'-6"1'-0"(TYP.)
CONST. JT.
A
A
9"
9"6 #5 S1 & S2
(BAYS 4 THRU 7)
@ 1'-0" CTS.
9"
8•"
@ 11" CTS.
3 #5 S1 & S2
10 #4 U1 BARS
@ 1'-6" CTS.
6"
23 #4 U2 @ 1'-0" CTS.
4-#9 B14-#4 B6
SECTION F-F
F
F
2‚"1ƒ"
SHEAR KEY DETAIL
#5 B8 BARS
#5 B8 BARS
#9 B2 BARS
(TYP. #9 B2 BARS
MECHANICAL COUPLERS
FOR WING DETAILS, SEE SHEET 2 OF 3.
FORMING IS USED.
BE POURED AFTER THE CONCRETE CURB IS CAST IF SLIP
THE CONCRETE IN THE SHADED AREA OF THE WING SHALL
OF 2%.
FROM THE FILL FACE TO THE BACK FACE AT THE RATE
BRIDGE SEAT BUILDUPS SHALL BE SLOPED TRANSVERSELY
THE TOP SURFACE OF THE END BENT CAP EXCEPT THE
COMPOUND METHOD SHALL NOT BE USED.
SPECIFICATIONS EXCEPT THAT THE MEMBRANE CURING
SHALL BE CURED IN ACCORDANCE WITH THE STANDARD
THE TOP SURFACE AREAS OF THE END BENT CAP
PROTECTIVE COATING.
BACKWALL SHALL BE PLACED BEFORE APPLYING THE EPOXY
FOR PILE SPLICE DETAILS, SEE SHEET 3 OF 3.
CLEAR ANCHOR BOLTS.
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO
3'-6"
1'-3"1'-0"1'-3"1'-0"7•"1'-0"1'-0"1'-0"(TYP.)OF CAP
BOTTOM
OF CAP
BOTTOM
1'-0"
MAT'L.
1" EXP. JT.
EL. 2010.62
TOP OF WING
EL. 2,011.81
(8 REQ'D)
#4 B5 @ 4'-0" CTS.10'-0"(2'-5" SPLICE)
(2 BAR RUN)
(EA. FACE)
3 #4 B7 BARS
DETAIL
SEE SHEAR KEY
#9 B1 BARS
1'-0" PROJ.
(2'-5" SPLICE)
(2 BAR RUN)
OVER PILES
4-#4 B4
4-#9 B2
@ 1'-0" CTS.
2 #5 S1 & S2
(LEVEL)
BOTT. OF CAP
EL. 2005.47
3" HIGH BEAM BOLSTERS
PILES DETAIL", SHEET 3 OF 3.
CLARITY, SEE "CORROSION PROTECTION FOR STEEL
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN FOR
FOR SECTION A-A, SEE SHEET 3 OF 3.
WING & SHEET PILES NOT SHOWN FOR CLARITY.
2'-0" PROJ.
8/19
8/19
(EA. FACE)
#5 B3
FACE
FILL
LOWER PART OF WING
CAP, COLLARS, COPING &
POUR #12'-6"1'-0"1'-6"BACKWALL42
SECTION Y-Y
1'-0"
1'-5"
1'-0"1'-6"
2'-6"
FACE
FILL
CONST. JT.
B.B.
3" HIGH
2" CL.
2" CL.
2" CL.1'-6"1'-6"
2'-6"3 SPA. @ SHEET PILES
{ PZ27 STEEL
2-#5 B9
#5 B9
#4 "V"
PLAN OF WING W2
WING DETAILS
ELEVATION OF WING W2 2" CL.#4 "H"
FILL FACE
3"
Y
Y
EL. 2011.81
EL. 2010.213"3 SPA. @1'-0" SHEET PILEEMBEDMENT1'-0"8 - PZ27 STEEL SHEET PILES
12 - #5 U3 @ 1'-0" CTS.6"
10'-0"2'-6"
12'-6"
14'-0"1'-0"1'-6"1'-0"2'-6"#4 "K" (EA. FACE)
(EA. FACE)
#4 V3
(EA. FACE)
#4 V11
CONST. JT.
(SPACED AS SHOWN ABOVE)
3" HIGH B.B. @ 5'-0" CTS.
3"9 - #4 "V" BARS @ 1'-0" CTS.2" CL.#4 "V" BARS (EA. FACE)
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
TBE
8/19
SHEET 2 OF 3
WING DETAILS
STAGE I
END BENT 2
5'-0"
2'-6"1'-0"1'-6"
2" CL.
2" CL.
3'-6"32 #5 S4 @ 1'-0" CTS.7'-11Œ"7'-11Œ"7 SPA. @ 1'-0" CTS.(EACH FACE)20 #4 V2 SPACED AS SHOWNSHEET 1 0F 3
SEE DETAIL B
#4 K2
#4 K1
MAT'L.
1" EXP. JT.
#5 B9
S-33
(LEVEL)
EL. 2005.47
(FIELD BEND)
#4 H3
#4 H2
#4 H1
POUR #1POUR #27 #4 H1, 1-#4 H2, 1-#4 H3 (FILL FACE)7 #4 H1, 1-#4 H2, 1-#4 H3 (FRONT FACE)•"#5 U3 (TYP.)
SHEET PILE FOR
MAX. HOLE IN
DRILL 2" ~
#5 U39 #4 "H" (EACH FACE)8/19
8/19 8" CTS.4 SPA. @ 9" CTS.8" CTS.4 SPA. @ 9" CTS.42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 3 OF 3
STAGE I DETAILS
END BENT 2
MINIMUM OF 3- ONE CUBIC
FOOT BAGS OF #78M STONE.
BAGS SHALL BE OF POROUS
FOR DRAINAGE
GRADE TO DRAIN
TOE OF SLOPE
6" ( MIN.) PIPEFABRIC,SECURELY TIED.
BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER.
BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER-
MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS.
NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERAL PAY ITEMS.
TEMPORARY DRAINAGE AT END BENT
BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION
PIPE WILL NOT BE ALLOWED.
STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED
OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED
IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT
(MIN.)SECTION A-A
B1
3'-6"1'-6•"1'-6"•"1'-0"6"5'-0"
1'-0"2'-3"1'-9"
1'-4"1'-1"
STEEL PILES
{ HP 12x53
#4 S3
(OVER PILES)
@ 4" CTS.
4-#4 B4
FACE
FILL 2'-6"1'-0"1'-3"(TYP.)
2" CL.
#5 S2
#4 B5
2" CL.
1'-6"
1'-0"
#5 B8
#5 B8
#5 B3
#5 B3
1'-3"1'-0"1'-3"2" CL.#5 S1
STUD DETAIL"
SEE "ANCHOR
SHEET PILES
{ PZ27 STEEL (MIN.)9"9"3 #4 B7 BARS(EA. FACE)#4 U2
#5 V12" CL. TO#4 U2B.B.
3" HIGH
4"
4"
1'-6"
(TYP.)
(TYP.)
(TYP.)
AS SHOWN.
SHEET PILE CONNECTION
WELDED TO EVERY OTHER
ƒ" ~ x 5" ANCHOR STUDS
ANCHOR STUD DETAIL
BILL OF MATERIAL
POUR #1
POUR #2
BAR NO.SIZE TYPE LENGTH WEIGHT
TOTAL CLASS A CONCRETE
4 #9 1
END BENT 2 STAGE I
S-34DETAIL "A"
#5 B8
1'-0" CTS.
#5 S4 @
B2 4 #9 2
B3 2 #5
B4 8 #4
B5 8 #4 3'-2"
B6 4 #4 14'-3"
B9 3 #5 13'-8"STR.43
14 #4 10'-4"97H13
2 #4 7'-9"10K1STR.
29 #5 8'-4"S1
29 #5 4'-1"S2
10 #4 6'-6"43S3
32 #5 6'-7"S4
ALL BAR DIMENSIONS ARE OUT TO OUT.
HK.HK.1'-3'' LAP
HK.HK.
BAR TYPES
1'-3"
1'-8" ~2'-1•"8"
4
5
6
9'-8"
7
H1
HK.HK.8
1'-0"5•"5•"4'-8"
32'-3" B2
3
U3
U2 8"
1'-2"2'-2"2'-1"5•"5•"3'-2"5•"3'-2"
12 #5 5'-6"U3
23 #4 4'-10"74U2
23 #5 4'-3"V1 STR.
20 #4 6'-0"80V2STR.
2 #4 5'-10"8V3STR.
#4 5'-7"V4 STR.
HP 12 X 53 STEEL PILES
NO: 5
HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
375 SQ. FT.
PILE EXCAVATION IN SOIL
PILE EXCAVATION NOT IN SOIL
16.5 C.Y.
4.2 C.Y.
20.7 C.Y.
REINFORCING STEEL
4 252
5 124
6
8 220
7
7
1
1'-3"
HK.
1'-3"
HK.2
B7 6 #4 18'-2"
B8 3 #5 113
33'-3" B1
33'-6"456
35'-9"486
18'-3"
34'-6"
2,601 LBS.
CLASS A CONCRETE BREAKDOWN
45
60
60
POSITION OF PILE DURING WELDING.
DETAIL B
0'' TO „''
0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS
10°
0°
BACK GOUGE
BACK GOUGE
DETAIL A
DETAIL B
PILE VERTICAL
OR VERTICAL
PILE HORIZONTAL
45+10°-0°DETAIL A
1'-6"U1 3'-2"
10 #4 6'-2"U1 7 41
FILL FACE
3'-6"2'-3Œ"1'-10"1'-5"8•"8•"BOLTS
{ ANCHOR
{ BRG.4"4"8"4-#9 B1 BARS
4-#9 B2 BARS
2 #4 8'-3"11K1STR.
#4 5'-5"V5 STR.
#4 5'-3"V6 STR.
#4 5'-1"V7 STR.
#4 4'-11"V8 STR.
#4 4'-9"V9 STR.
#4 4'-7"STR.
#4 4'-5"STR.
STR.
STR.
STR.
STR.
STR.
STR.
72
98
17
38
73
36'-0"
69
2
2
2
2
2
2
2
2
V10
V11
7
7
7
7
7
6
6
6
BEARING PAD
ELASTOMERIC
1'-10" x 8" x 1ƒ"
PROJ. 5•" ABOVE CAP
ANCHOR BOLTS TO
1 ƒ'' • x 1'-11•"11"11"5'-4"H2
8'-10"H3
2 #4 6'-0"8H23
2 #4 9'-6"13H33
NO: 5 EA.
102
8/19
8/19
(TYP. EACH PILE)
PLAN
COLLAR
CONCRETE
ELEVATION
CONCRETE COLLARS
{ PILES &1'-6"2'-0"
STEEL PILE
{ HP 12 X 53
FILL FACE
2'-0" ~ CONCRETE COLLAR
CORROSION PROTECTION FOR STEEL PILES DETAIL1'-9"OF CAP
BOTTOM 1'-0"70 LIN. FT.
38.50 LIN. FT.
25.00 LIN. FT.
PART OF WING & COPING
CAP, COLLARS, LOWER
{ BEAM
PART OF WING
BACKWALL & UPPER
42
18" GALV. STEEL SHEET PILES
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 1 OF 4
STAGE II
END BENT 2
PLAN
W.P. 2
(TYP.)
TO CHORD
135°00'00"
S-35
4"
4"
1'-6"
(TYP.)
(TYP.)
(TYP.)
AS SHOWN.
SHEET PILE CONNECTION
WELDED TO EVERY OTHER
ƒ" ~ x 5" ANCHOR STUDS
ANCHOR STUD DETAIL
-L-
CHORD
NOTES
54'-1" (STAGE I AND STAGE II)
15 - PZ27 STEEL SHEET PILES
23 - #5 S8 @ 1'-0" CTS.
22'-7" (STAGE II)2'-6"
3'-6"2'-6"
(TYP.)(TYP.)(TYP.)1'-9" TO{ OF PILES4'-0" TOPILES{ OF SHEET 1'-3"3"
22'-6"3'-4Š"
4'-4Š"4'-4Š"9'-3ƒ"
8'-3†"17'-6‹"2'-6"
SHEET 4 OF 4)
SEE DETAIL "A"SEE DETAIL "C"
DETAIL "C"
PZ90
PZ27
{ BM. 1 { BM. 2 { BM. 3
#5 B33 BARS9'-8Ž"1'-6"8'-2Ž"14'-10"
14'-4
Š "
10'-0"
4'-4
Š "
9 -
P
Z27
S
T
E
E
L
S
HE
E
T
PI
L
E
S
ELEVATION
X X X 2'-3Œ" TO{ OF BRG.WORK LINE
@ 5'-0" CTS.
EL. 2010.68
EL. 2008.88 EL. 2009.00
EL. 2008.77
EL. 2008.89
EL. 2008.66
EL. 2008.78
EL. 2008.66
(TYP.)
EMBEDMENT
1'-0" MIN.
9'-0"7'-6"7'-0"
1
BAY 1
2 3
BAY 2
{ HP 12 x 53 STEEL PILES
EL. 2011.12
& BACKWALL
OF WING
UPPER PART
POUR #2
1'-6"1'-0"(TYP.)
CONST. JT.
7 #4 U1 @ 1'-6" CTS.6"
B
B
4-#4 B31
CL.2"OVER PILES
4-#4 B29
5 #5 S1 & S2
@ 10" CTS.
10 #5 S1 & S2 @ 8" CTS.9"
8"8"8"9 #5 S1 & S2 @ 11•" CTS.
7"
3"
11'-9„"
12'-1Ž"
20'-0‹"
FOR WING DETAILS, SEE SHEET 3 OF 4.
FORMING IS USED.
BE POURED AFTER THE CONCRETE CURB IS CAST IF SLIP
THE CONCRETE IN THE SHADED AREA OF THE WING SHALL
OF 2%.
FROM THE FILL FACE TO THE BACK FACE AT THE RATE
BRIDGE SEAT BUILDUPS SHALL BE SLOPED TRANSVERSELY
THE TOP SURFACE OF THE END BENT CAP EXCEPT THE
COMPOUND METHOD SHALL NOT BE USED.
SPECIFICATIONS EXCEPT THAT THE MEMBRANE CURING
SHALL BE CURED IN ACCORDANCE WITH THE STANDARD
THE TOP SURFACE AREAS OF THE END BENT CAP
PROTECTIVE COATING.
BACKWALL SHALL BE PLACED BEFORE APPLYING THE EPOXY
FOR PILE SPLICE DETAILS, SEE SHEET 4 OF 4.
CLEAR ANCHOR BOLTS.
STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO
MAT'L.
1" EXP. JT.
PILES DETAIL", SHEET 4 OF 4.
CLARITY SEE "CORROSION PROTECTION FOR STEEL
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN FOR
FOR SECTION A-A, SEE SHEET 4 OF 4.
WING & SHEET PILES NOT SHOWN FOR CLARITY.
PILES DETAIL", SHEET 4 OF 4.
CLARITY, SEE "CORROSION PROTECTION FOR STEEL
CONCRETE COLLARS FOR STEEL PILES NOT SHOWN FOR
FOR SECTION B-B, SEE SHEET 4 OF 4.
WING & SHEET PILES NOT SHOWN FOR CLARITY.
8/19
8/19
STAGE I
(6 REQ'D)
#4 B30 @ 4'-0" CTS.
JOINT
CONST.
1'-0"1'-0"#5 S4 & S5
#5 S6 & S7
25'-6•"
#5 S1 & S2
(EA. FACE)
3 #4 B32 BARS
(LEVEL)
BOTT. OF CAP
EL. 2005.47
9"
3" HIGH BEAM BOLSTERS
PILE)
(TYP. EA.
2-#4 S3
THRU B27
#9 B24
THRU B23
#9 B20
(3'-0" SPLICE)
(2 BAR RUN)
(EA. FACE)
#5 B28
TOP OF WING
EL. 2,012.76
W11'-0"1'-6"18 #5 V12 @ 1'-0" CTS. (FILL FACE) 17 #5 V12 @ 1'-0" CTS. (FRONT FACE)
17 #4 U2 @ 1'-0" CTS.
STAGE I7'-0„"1'-0"1'-6"2'-6"BACKWALLJOINT
CONST.
& LOWER PART OF WING
CAP, COLLARS, COPING
POUR #1
42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 2 OF 4
STAGE II DETAILS
END BENT 2
S-36
-L-
CHORD
(TYP.)
TO CHORD
135°00'00"
2'-6"22'-7"
25'-1"
FILL FACE
W.P. 2
-L-
(TYP.)
TO CHORD
135°00'00"
2'-6"22'-7"
25'-1"
FILL FACE
W.P. 2
#9 B20
#9 B21
#9 B23
#9 B22
#9 B25
#9 B26
#9 B27
#9 B24
8/19
8/19
#9 "B" BARS - TOP OF CAP
#9 "B" BARS - BOTTOM OF CAP
CHORD
42
1'-0"
1'-5"
1'-0"1'-6"
2'-6"
FACE
FILL
CONST. JT.
B.B.
3" HIGH
2" CL.
2" CL.
2" CL.1'-6"1'-6"
2'-6"
SHEET PILES
{ PZ27 STEEL
#4 "V"
#5 B34
2-#5 B34
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW
TBE
8/19
SHEET 3 OF 4
WING DETAILS
STAGE II
END BENT 2
SECTION Y-Y
S-37
8/19
8/19
PLAN OF WING W1
WING DETAILS
ELEVATION OF WING W11'-0"2" CL.2" CL.2'-6"1'-6"1'-0"#4 "H"#4 "H"
FACE
FILL
#4 K3
JT. MAT'L.
1" EXP.
14'-10"
4'-4Š"10'-0"
14'-4Š"
3"
15 - #5 U3 @ 1'-0" CTS.
9 - PZ27 STEEL SHEET PILES
9 #4 "V" BARS @ 1'-0" CTS.
SHEET PILES
{ PZ27 STEEL
9'-7‹"
5'-0"
3'-6"
2'-6"
1'-0"
1'-6"
3" HIGH B.B. @ 5'-0" CTS.1'-0"#4 K3 (EA. FACE)EMBEDMENTCONST. JT.3"1'-0" SHEET PILE(EA. FACE)
#4 V15
#4 "V" BARS (EA. FACE) (SPACED AS SHOWN ABOVE)
EL. 2009.22
EL. 2012.76
SHEET 1 0F 4
SEE DETAIL C
23 #5 S8 @ 1'-0" CTS.
20 #4 V13 SPACED AS SHOWN
7 SPA. @ 1'-0" CTS.
#5 B34
(EA. FACE)
#4 V14
(LEVEL)
EL. 2005.47 POUR #1POUR #2•"#5 U3
#5 U3 (TYP.)
SHEET PILE FOR
MAX. HOLE IN
DRILL 2" ~
1'-9"
(FIELD BEND)
#4 H5 (FILL FACE)
#4 H4 (FRONT FACE)
#4 H7 (FILL FACE)
#4 H6 (FRONT FACE)
#4 H9 (FILL FACE)
#4 H8 (FRONT FACE)
#4 H11 (FILL FACE)
#4 H10 (FRONT FACE)10 #4 "H" (SPACED AS SHOWN) (EACH FACE)5 #4 H14 (FRONT FACE)5 #4 H15 (FILL FACE)(EA. FACE)
#4 V16
(EA. FACE)
#4 V13
(EA. FACE)
#4 V17
(EA. FACE)
#4 V18
(EA. FACE)
#4 V19
(EA. FACE)
#4 V20
(EA. FACE)
#4 V21
(EA. FACE)
#4 V22
8'-3†"
#4 H13 (FILL FACE)
#4 H12 (FRONT FACE)4 SPA. @ 9" CTS.10 #4 "H" (FRONT FACE)10 #4 "H" (FILL FACE)4 SPA. @ 9" CTS.4 SPA. @ 9" CTS.4 SPA. @ 9" CTS.42
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
MGC
NMW 7/19
TBE
SHEET 4 OF 4
STAGE II DETAILS
END BENT 2
MINIMUM OF 3- ONE CUBIC
FOOT BAGS OF #78M STONE.
BAGS SHALL BE OF POROUS
FOR DRAINAGE
GRADE TO DRAIN
TOE OF SLOPE
6" ( MIN.) PIPEFABRIC,SECURELY TIED.
BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT
ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER.
BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER-
MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS.
NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE
COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE
BID FOR THE SEVERAL PAY ITEMS.
TEMPORARY DRAINAGE AT END BENT
BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION
PIPE WILL NOT BE ALLOWED.
STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED
OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED
IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT
BILL OF MATERIAL
BAR NO.SIZE TYPE LENGTH WEIGHT
1
(MIN.)#9 1
3'-6"1'-6•"1'-6"•"1'-0"6"5'-0"
1'-0"2'-3"1'-9"
1'-4"1'-1"
STEEL PILES
{ HP 12x53
#4 S3
(OVER PILES)
@ 4" CTS.
4-#4 B29
FACE
FILL
1'-0"1'-3"4-#4 B31 BARS
(TYP.)
2" CL.
#4 U1
#4 B30
2" CL.
1'-6"
1'-0"
#5 B33
#5 B33
#5 B28
#5 B28
1'-3"1'-0"1'-3"2" CL.#5 S1
SHEET PILES
{ PZ27 STEEL9"9"3 #4 B32 BARS(EA. FACE)#4 U2
#5 V122" CL. TO#4 U2B.B.
3" HIGH
S-38
#5 B33
1'-0" CTS.
#5 S8 @
ALL BAR DIMENSIONS ARE OUT TO OUT.
HK.HK. HK.HK.
BAR TYPES
1'-3"
1'-8" ~
4
5
6
10'-0"
7
H4
H5
HK.HK.8
1'-0"5•"5•"4'-8"
21'-6" B24
3
U3
U2 8"
1'-2"2'-2"2'-0"24'-7" B26
25'-9" B27
5•"5•"3'-2"5•"3'-2"
HP 12 X 53 STEEL PILES
NO: 3
HP 12 X 53 STEEL PILES
SETUP FOR
PILE DRIVING EQUIPMENT
PILE EXCAVATION IN SOIL
PILE EXCAVATION NOT IN SOIL
END BENT 2 STAGE II1
1'-3"
HK.
1'-3"
HK.2
22'-3" B20
23'-8" B21
25'-1" B22
45
60
60
POSITION OF PILE DURING WELDING.
DETAIL B
0'' TO „''
0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS
10°
0°
BACK GOUGE
BACK GOUGE
DETAIL A
DETAIL B
PILE VERTICAL
OR VERTICAL
PILE HORIZONTAL
45+10°-0°DETAIL A
SECTION B-B
#5 S2 1'-6"U1 3'-2"
11'-2"
8
"
B20 24'-9"
1 #9 1B21 26'-2"
1 #9 1B22
1 #9 1B23 29'-0"
94
1 #9 2B24 22'-9"77
1 #9 2B25 81
1 #9 2B26 88
1 #9 2B27 92
4 #5B28 63STR.
4 #4B29 64STR.
6 #4B30 13STR.
4 #4B31 28STR.
6 #4B32 STR.
3 #5B33 STR.
3 #5B34 45STR.
1 #4 9'-5"63
1 #4 10'-5"73
4 #4 9'-3"25K3STR.
25 #5 4'-1"S2
6 #4 6'-6"S3
1 #5 10'-2"S4
7 #4 6'-2"U1
5 106
6
4
7
25 #5 9'-8"S1 4
15 #5 5'-6"U3
17 #4 4'-8"53U2
7
7
35 #5 4'-10"STR.
20 #4 92STR.
2 #4 6'-9"STR.
2 #4 6'-4"STR.
2 #4 8STR.
2 #4 5'-6"7STR.
2 #4 5'-1"7STR.
2 #4 4'-8"6STR.
2 #4 4'-3"6STR.
2 #4 3'-11"5STR.
3'-2"
10'-6"
26'-2"
14'-6"
26
29
252
86
8
5'-11"
V17
V18
V19
V20
V21
298.0 SQ. FT.
DETAIL "A"
FILL FACE
3'-6"2'-3Œ"1'-10"1'-5"BOLTS
{ ANCHOR
{ BRG.4"4"8"26'-6" B23
22'-8" B25
6Œ"
84
89
27'-7"
99
23'-11"
25'-10"
27'-0"
105
22'-11"72
2 #4 3'-6"5STR.V22
V12 176
V13 6'-11"
V14 9
V15
V16
BEARING PAD
ELASTOMERIC
1'-10" x 8" x 1ƒ"
PROJ. 5•" ABOVE CAP
ANCHOR BOLTS TO
1 ƒ'' • x 1'-11•"11"11"8•"8•"8/19
8/19
(TYP. EACH PILE)
PLAN
COLLAR
CONCRETE
ELEVATION
CONCRETE COLLARS
{ PILES &1'-6"2'-0"
STEEL PILE
{ HP 12 X 53
FILL FACE
2'-0" ~ CONCRETE COLLAR
CORROSION PROTECTION FOR STEEL PILES DETAIL1'-9"OF CAP
BOTTOM
42 LIN. FT.
NO: 3 EA.
{ BEAM
5•"5•"3'-8"
5•"5•"5'-6"
S2
S5
S7
1'-3'' LAP 5•"5•"2'-9•" 3'-8"
5'-6"
S1
S4
S6 2'-9•"2'-9•"H12
H13
POUR #1
POUR #2
TOTAL CLASS A CONCRETE
CLASS A CONCRETE BREAKDOWN
2,319 LBS.
15.8 C.Y.
3.8 C.Y.
19.6 C.Y.
PART OF WING & COPING
CAP, COLLARS, LOWER
REINFORCING STEEL
1 #4 8'-7"63H11
1 #4 7'-8"53H10
1 #4 6'-10"53
1 #4 5'-11"43
1 #4 5'-1"33
1 #4 4'-2"33
1 #4 83
H6
H5
H7
H8
H9
1 #4 73H4
1 #5 4'-7"S5 5
1 #5S6 4
1 #5 6'-5"S7 5
23 #5 6'-7"S8 8 158
23.00 LIN. FT.
15.00 LIN. FT.
24'-0"
15'-0"
H6 3'-6"
H7 4'-5"
H8 5'-3"
H9 6'-2"
7'-0"
7'-11"
8'-9"
H10
H11
H12
H13
11
5
12'-0"13
7
#9 B20 THRU B23
#9 B24 THRU B27
SHEET 1 OF 4.
STUD DETAIL",
SEE "ANCHOR
PART OF WING
BACKWALL & UPPER
9'-6"H14
H15
5 #4 10'-2"343H14
5 #4 11'-2"373H15
10'-6"
9'-9"
10'-8"
11'-10"
42
18" GALV. STEEL SHEET PILES
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
12'-0"
1'-3"
9"
3"
9"
3"
PLAN @ END BENT #1
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
NMW
MGC
5/19
BRIDGE APPROACH SLAB
-L-35-#6 B2 @ 6' CTS (BOTT. OF SLAB)1'-3"
9"
3"
9"
3"
CONST. JT.6" BEVEL3'-0"3'-6"BAR NO.SIZE TYPE LENGTH WEIGHT
A2
A1
B1
B2
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
BAR NO.SIZE TYPE LENGTH WEIGHT
B1
B2
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
#4
#4
#4
#4
APPROACH SLAB AT EB #1
STAGE I
APPROACH SLAB AT EB #1
STAGE II
A3
A4
35
35
21
21
926
660
9.8
586
422
6.3
BILL OF MATERIAL
BAR
SIZE
#4
#5
#6
EPOXY
COATED UNCOATED
2'-0"
2'-6"
3'-10"
1'-9"
2'-2"
2'-7"
SPLICE LENGTHS
CURB DETAILS
SECTION N-N
8"4"ARC OFFSETS - LEFT SIDE
NORMAL TO END BENT
SAWED OPENING FOR
1'-4"JOINT SEAL
OPENING
À JOINT
6"2" CL.BARS
#5 ``B''
BARS
#6 ``B''
BARS
#4 ``A''
FORMED
PREVENT BOND
ROOFING FELT TO
2 LAYERS OF 30 LB.1'-2"8"4" CL.SECTION THRU SLAB
2 : 1 SLOPE
#4 ``A'' BARS
ROADWAY
SUPPORTS @ 3'-0" CTS.
APPROVED WIRE BAR
@ 3'-0" CTS. ACROSS SLAB
5‚" CONTINUOUS HIGH CHAIR UPPER (CHCU)
3'-0"6"1'-8"GEOTEXTILE
PVC PIPE
SCHEDULE 40
4" • PERFORATED
OR CLASS VI)
(CLASS V
MATERIAL
SELECT
MIN.BY THE CONTRACTOR)
(TO BE DETERMINED
1: 1 SLOPE
APPROXIMATE
(TYPE II - MODIFIED APPROACH FILL)
STAGE I & STAGE II
AT END BENT #1
N
N
(TOP OF SLAB) (2-BAR RUN)
11-#4 A3 @ 1'-0" CTS.
(BOTTOM OF SLAB) (2-BAR RUN)
11-#4 A4 @ 1'-0" CTS.
(TOP OF SLAB) (2-BAR RUN)
11-#4 A1 @ 1'-0" CTS.
(BOTTOM OF SLAB) (2-BAR RUN)
11-#4 A2 @ 1'-0" CTS.
#6 B7 (BOTT. OF SLAB)
#5 B3 (TOP OF SLAB) OR
#6 B8 (BOTT. OF SLAB)
#5 B4 (TOP OF SLAB) OR
#6 B9 (BOTT. OF SLAB)
#5 B5 (TOP OF SLAB) OR
(FIELD BEND)
#6 B10 (BOTT. OF SLAB)
#5 B6 (TOP OF SLAB) OR
#6 B17 (BOTT. OF SLAB)
#5 B11 (TOP OF SLAB) OR
#6 B18 (BOTT. OF SLAB)
#5 B12 (TOP OF SLAB) OR
#6 B19 (BOTT. OF SLAB)
#5 B13 (TOP OF SLAB) OR
#6 B20 (BOTT. OF SLAB)
#5 B14 (TOP OF SLAB) OR
#6 B21 (BOTT. OF SLAB)
#5 B15 (TOP OF SLAB) OR
(FIELD BEND)
#6 B22 (BOTT. OF SLAB)
#5 B16 (TOP OF SLAB) OR
CURVE
& END OF
END BENT #1
FILL FACE @ APPROACH SLAB
END OF
6 SPA. @ 1'-0" CTS.
13 SPACES @ 1'-0" CTS.
CURVE
& END OF
END BENT #1
FILL FACE @ APPROACH SLAB
END OF
ARC OFFSETS - RIGHT SIDE
7'-3•" (ALONG CHORD)
FOR BRIDGE APPROACH FILL INCLUDING GEOTEXTILE, 4" • DRAINAGE PIPE,
AND SELECT MATERIAL BACKFILL, SEE ROADWAY PLANS.
GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONS SECTION 1056.
SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI) SHALL BE IN
ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 1016.
SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF
BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLAB.
APPROACH SLAB SHALL NOT BE CONSTRUCTED PRIOR TO COMPLETION OF THE
BRIDGE DECK.
FOR THE 4" ~ DRAINAGE PIPE OUTLET(S), SEE ROADWAY STANDARD DRAWINGS.
AREA BETWEEN THE WINGWALL AND APPROACH SLAB SHALL BE GRADED TO
DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL
BE PAVED. SEE ROADWAY PLANS.
NOTES
#5
#6
24
26
1 #5 8
1 #5 5
1 #5 3
1 #5 14
1 #6 12
1 #6 8
1 #6 5
1 #6 20
B3
B4
B5
B6
B7
B8
B9
B10
*
*
*
*
24
26
#5
#6
8
6
4
3
2
9
11
8
6
4
3
13
B11
B12
B13
B14
B15
B16
B17
B18
B19
B20
B21
B22
*
*
*
*
*
*
16'-2"259
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
STR
15'-11 276
10'-2"371
11'-6"605
7'-9"
5'-1"
1 #5
1 #5
1 #5
1 #5
1 #5
1 #5
1 #6
1 #6
1 #6
1 #6
1 #6
1 #6
3'-0"
13'-0"
7'-9"
5'-1"
3'-0"
13'-0"
10'-5"167
10'-3"178
10'-2"223
11'-6"363
7'-5"
5'-5"
3'-11"
2'-8"
2'-0"
8'-6"
7'-5"
5'-5"
3'-11"
2'-8"
2'-0"
8'-6"(TYP.)@ END BENT 1
FILL FACE
SLAB)
(BOTT. OF
#4 A4
SLAB)
(TOP OF
#4 A3
#4 A4
#4 A3 OR
SLAB)
(BOTT. OF
#4 A2
SLAB)
(TOP OF
#4 A1
SLAB)
(BOTT. OF
#4 A2
#4 A2
#4 A1 OR
SLAB)
(BOTT. OF
#4 A4
SHEET 1 OF 3
S-39
42
8/19
8/19
SBW NNCHORD
(TO CHORD)
135°-00'-00"
DETAILS", SHEET 3 OF 3.
SEE " FOAM JOINT SEAL 33'-9‚"16'-9"17'-0‚"20'-3" (STAGE I)13'-6‚" (STAGE II)CHORD EXT.(BOTT. OF SLAB)21-#6 B2 @ 6' CTS THE JOINT SHALL BE SAWED PRIOR TO THE CASTING OF THE CURB.
BE 2''.
THE NOMINAL UNCOMPRESSED SEAL WIDTH OF THE FOAM JOINT SEAL SHALL
FOR FOAM JOINT SEALS, SEE SPECIAL PROVISIONS.3"6•"8•"9‰"8•"6•"3"0•"1Š"1•"2‹"2Ž"3ˆ"3‰"3‰"3ˆ"2Ž"2‹"1•"1Š"0•"7ƒ"7ƒ"
7„"7„"
14'-2‚" (ALONG CHORD)
BEGIN APPROACH SLAB
STA. 15+74.40 (-CHORD EXT.-)
WORK POINT #1
STA. 15+84.99 -L-8" CURB26'-10" (CLEAR ROADWAY)16'-11"9'-11"4"35-#5 B1 @ 6" CTS. (TOP OF SLAB)3"3"21-#5B1 @ 6' CTS (TOP OF SLAB)8" CURB10'-7" (STAGE II)17'-7" (STAGE I)3'-6"14'-1"28'-2"4"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
BRIDGE APPROACH SLAB
STAGE I & STAGE II
AT END BENT #2
CHECKED BY :
DATE :
DATE :
DRAWN BY :
DATE :DESIGN ENGINEER OF RECORD :
NMW
MGC
5/19
NORMAL TO END BENT
SAWED OPENING FOR
1'-4"JOINT SEAL
OPENING
À JOINT
6"2" CL.BARS
#5 ``B''
BARS
#6 ``B''
BARS
#4 ``A''
FORMED
PREVENT BOND
ROOFING FELT TO
2 LAYERS OF 30 LB.1'-2"8"4" CL.SECTION THRU SLAB
2 : 1 SLOPE
#4 ``A'' BARS
ROADWAY
SUPPORTS @ 3'-0" CTS.
APPROVED WIRE BAR
@ 3'-0" CTS. ACROSS SLAB
5‚" CONTINUOUS HIGH CHAIR UPPER (CHCU)
3'-0"6"1'-8"GEOTEXTILE
PVC PIPE
SCHEDULE 40
4" • PERFORATED
OR CLASS VI)
(CLASS V
MATERIAL
SELECT
MIN.BY THE CONTRACTOR)
(TO BE DETERMINED
1: 1 SLOPE
APPROXIMATE
(TYPE II - MODIFIED APPROACH FILL)
BAR NO.SIZE TYPE LENGTH WEIGHT
B1
B2
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
BAR NO.SIZE TYPE LENGTH WEIGHT
B1
B2
STR
STR
*
*
*
LBS.
LBS.
C. Y.
REINFORCING STEEL
REINFORCING STEEL
EPOXY COATED
CLASS AA CONCRETE
#4
#4
#4
#4
APPROACH SLAB AT EB #2
STAGE I
APPROACH SLAB AT EB #2
STAGE II
35
35
21
21
837
587
9.1
529
375
5.7
BILL OF MATERIAL
BAR
SIZE
#4
#5
#6
EPOXY
COATED UNCOATED
2'-0"
2'-6"
3'-10"
1'-9"
2'-2"
2'-7"
SPLICE LENGTHS
#5
#6
12
13
24
26
#5
#6
1 12#5
1 17#6
B30
B40
*
CURB DETAILS
SECTION N-N
8"4"PLAN @ END BENT #2
CONST. JT.
12'-0"35-#6 B2 @ 6' CTS (BOTT. OF SLAB)1'-3"
9"
3"
9"
3"
1'-3"
9"
3"
9"
3"
N
N6" BEVEL3'-0"(TYP.)-L-
END BENT 2
FILL FACE @
FOR BRIDGE APPROACH FILL INCLUDING GEOTEXTILE, 4" • DRAINAGE PIPE,
AND SELECT MATERIAL BACKFILL, SEE ROADWAY PLANS.
GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE WITH THE STANDARD
SPECIFICATIONS SECTION 1056.
SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI) SHALL BE IN
ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 1016.
SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF
BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLAB.
APPROACH SLAB SHALL NOT BE CONSTRUCTED PRIOR TO COMPLETION OF THE
BRIDGE DECK.
FOR THE 4" ~ DRAINAGE PIPE OUTLET(S), SEE ROADWAY STANDARD DRAWINGS.
AREA BETWEEN THE WINGWALL AND APPROACH SLAB SHALL BE GRADED TO
DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL
BE PAVED. SEE ROADWAY PLANS.
NOTES
(TOP OF SLAB)
11-#4 A10 @ 1'-0" CTS.
(BOTTOM OF SLAB)
11-#4 A20 @ 1'-0" CTS.
(TOP OF SLAB) (2-BAR RUN)
11-#4 A30 @ 1'-0" CTS.
(BOTTOM OF SLAB) (2-BAR RUN)
11-#4 A40 @ 1'-0" CTS.
SLAB)
(BOTT. OF
#4 A40
SLAB)
(TOP OF
#4 A30
SLAB)
(BOTT. OF
#4 A40
#4 A40
#4 A30 OR
SLAB)
(BOTT. OF
#4 A20
#4 A20
#4 A10 OR
SLAB)
(BOTT. OF
#4 A20
SLAB)
(TOP OF
#4 A10
#6 B40 (BOTT. OF SLAB)
#5 B30 (TOP OF SLAB) OR
A10
A20
A30
A40
26'-11"216
26'-8"232
STR
STR
STR
STR
STR
STR
10'-2"371
11'-6"605
8'-9"
8'-7"
140
149
10'-2"
11'-6"
11'-3"
11'-3"
223
363
SHEET 2 OF 3
S-40
42
8/19
8/19
SBW
DETAILS", SHEET 3 OF 3.
SEE " FOAM JOINT SEAL
THE JOINT SHALL BE SAWED PRIOR TO THE CASTING OF THE CURB.
BE 2''.
THE NOMINAL UNCOMPRESSED SEAL WIDTH OF THE FOAM JOINT SEAL SHALL
FOR FOAM JOINT SEALS, SEE SPECIAL PROVISIONS.
CHORD EXT.CHORD
TO CHORD
135°-00'-00"
N
N 28'-7…"26'-10" (CLEAR ROADWAY)8" CURB8" CURB16'-11"9'-11"3"35-#5 B1 @ 6" CTS. (TOP OF SLAB)21-#5B1 @ 6' CTS (TOP OF SLAB)3'-6"14'-1"(BOTT. OF SLAB)21-#6 B2 @ 6' CTS WORK POINT #2
STA. 16+41.01 -L-
END APPROACH SLAB
STA. 16+51.60 (-CHORD EXT.-)3"4"4"14'-9„"13'-10‚"10'-7" (STAGE II)17'-7" (STAGE I)28'-2"11'-3„" (STAGE II)17'-4‚" (STAGE I)3'-6"
NO.NO.BY:BY:DATE:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
16+13.00-L-
DOCUMENT NOT CONSIDERED FINAL
UNLESS ALL SIGNATURES COMPLETED
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
STANDARD
SLAB DETAILS
BRIDGE APPROACH
STD. NO. BAS4
CHECKED BY :
DATE :
DATE :
ASSEMBLED BY :
CHECKED BY : ARB 1 1/88
DRAWN BY : FCJ 1 1/88 REV. 6/13
REV. 12/17
MAA/GM
MAA/THC
REV. 5/18 MAA/THC
NMW
SBW
5/19
SECTION C-C2‚"(TYP.)5•"
(TYP.)
CONCRETE
ELASTOMERIC
BLOCKOUT FOR
À JT. @ END BENT
CONCRETE DIMENSIONS)
(PRE-SAWED ELASTOMERIC
FOAM JOINT SEAL
45°45° 1"BEVEL AS SHOWN FROM
GUTTER TO GUTTER
SAWED OPENING FOR
SECTION C-C ‚"CONCRETE
ELASTOMERIC
À JT. @ END BENT
( EXPANSION )
FOAM JOINT SEAL
FOAM JOINT SEALCCPLAN
B A
B A
ELASTOMERIC CONCRETE
END BENT
À JOINT @
FORMED OPENING
SAWED OPENING (DECK)
SECTION B-B
SAWED OPENING
AREA TO MATCH
FORMED IN THIS
OPENING TO BE
1'-4"JT.MAT'L
SAWED
FORMED4"8"
1" EXP.4"BOTTOM OF SEAL(LEVEL)
CONST. JT.SAWEDFORMEDBOTTOM OF SEAL
RADIUS OF SAW BLADE
SECTION A-A
3" MIN. (WILL EXCEED
SAWED OPENING
AREA TO MATCH
FORMED IN THIS
OPENING TO BE
LARGER THAN 3")
3" IF SEAL DEPTH IS6"
(LEVEL)
CONST. JT.
1•"
* BASED ON THE MINIMUM BLOCKOUT SHOWN.
(CU. FT.)
CONCRETE *
ELASTOMERIC
TOTAL
ELASTOMERIC CONCRETE
SLAB
APPROACH
EARTH DITCH BLOCK
12"FILL SLOPE
ELBOW
ELBOW
TEMPORARY SLOPE DRAIN
TOE OF FILL
SECTION S-S
SECTION R-R
12" MINIMUM
END OF APPROACH SLAB
EROSION RESISTANT MATERIAL
TO PIPE INLET
GRADE TO DRAIN
1'-6" MIN.
FLOW LINE
PLAN VIEW
TEMPORARY BERM AND SLOPE DRAIN DETAILS
R
TEMP. SLOPE DRAIN
1'-0"
MIN.
R
FUTURE SHOULDER
2'-0"MIN.2'-6" MIN.S
S
4'-0"
EARTH DITCH BLOCK
À
2'-0"MIN.
NOTE:
TEMPORARY DRAINAGE PIPE, 12 INCHES IN DIAMETER.
THE SLOPE DRAIN SHALL CONSIST OF A NON-PERFORATED
MAT, OR 3) CONCRETE, AS DIRECTED BY THE ENGINEER.
PLANT MIX, TYPE 1 OR TYPE 2, MIN. 2" DEPTH, 2) EROSION CONTROL
EROSION RESISTANT MATERIAL SHALL BE EITHER 1) ASPHALT
AND PROVIDE EROSION RESISTANT MATERIAL AS SHOWN. THE
DRAIN. CONTRACTOR SHALL GRADE TO PIPE INLET
THE CONTRACTOR SHALL PROVIDE TEMPORARY BERM AND SLOPE
IMMEDIATELY AFTER THE CONSTRUCTION OF THE APPROACH SLAB,MIN.2'-6"FOR EROSION CONTROL
CLASS ``B" STONE
FOR EROSION CONTROL
CLASS ``B" STONE
4'-0" MIN.
MATERIAL OVER PIPE
3" EROSION RESISTANT
(TO BE USED WHEN SHOULDER BERM GUTTER IS REQUIRED)NIARDOTEDARG
FLOW LINE
EPOLSFOMOTTOBOT
NOTE:IF THE APPROACH SLAB IS NOT CONSTRUCTED IMMEDIATELY
AFTER THE BACKFILLING OF THE END BENT EXCAVATION,
GRADE TO DRAIN TO THE BOTTOM OF THE SLOPE AND PROVIDE
EROSION RESISTANT MATERIAL, SUCH AS FIBERGLASS ROVING
OR AS DIRECTED BY THE ENGINEER TO PREVENT SOIL EROSION
AND TO PROTECT THE AREA ADJACENT TO THE STRUCTURE.
THE CONTRACTOR WILL BE REQUIRED TO REMOVE THESE
MATERIALS PRIOR TO CONSTRUCTION OF THE APPROACH SLAB.
TEMPORARY DRAINAGE DETAIL
CAP FLOW LINE ONLY WITH
EROSION RESISTANT MATERIAL
BACKFILL EXCAVATION HOLE
AND GRADE TO DRAIN
BRIDGE DECK
1†" @ 45° F
1Œ" @ 60° F
1•" @ 90° F
CURB
END BENT 1 STAGE I
END BENT 2 STAGE I
END BENT 1 STAGE II
END BENT 2 STAGE II
SHEET 3 OF 3
4.3
2.6
4.3
2.6
13.8
S-41
42
8/19
FOAM JOINT SEAL DETAILS @ END BENT
1" FORMED OPENING
1" FORMED OPENING
UP PARALLEL TO SLOPED FACE OF THE CURB.
FOAM JOINT SEAL TO BE CUT, HEAT WELDED AND TURNED
FILL FACE
1'-3"
NO.NO.BY:BY:DATE:
REVISIONS SHEET NO.
TOTAL
SHEETS
STATE OF NORTH CAROLINA
RALEIGH
STATION:
COUNTY
PROJECT NO.
DEPARTMENT OF TRANSPORTATION
1
2
3
4
16+13.00-L-
Placement Scale :
PRELIMINARY PLANS
TGS ENGINEERS
804-C N. LAFAYETTE ST
SHELBY, NC 28150
PH (704) 476-0003
CORP. LICENSE NO.: C-0275
17BP.14.R.211
REPLACES BRIDGE NO. 580046
MACON
STANDARD NOTES
BRIDGES SHALL BE BUILT ON THE GRADE OR VERTICAL CURVE SHOWN ON PLANS.
SLABS, CURBS AND PARAPETS SHALL CONFORM TO THE GRADE OR CURVE.
ALL DIMENSIONS WHICH ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD LOAD
ON PLANS. IN SETTING FORMS FOR STEEL BEAM BRIDGES AND PRESTRESSED CONCRETE
GIRDER BRIDGES, ADJUSTMENTS SHALL BE MADE DUE TO THE DEAD LOAD DEFLECTIONS
FOR THE ELEVATIONS SHOWN. WHERE BLOCKS ARE SHOWN OVER BEAMS FOR BUILDING
UP TO THE SLAB, THE VERTICAL DIMENSIONS OF THE BLOCKS SHALL BE ADJUSTED
ORDINATE, AND ACTUAL BEAM CAMBER. WHERE BOTTOM OF SLAB IS IN LINE WITH
BOTTOM OF TOP FLANGES, DEPTH OF SLAB BETWEEN BEARINGS SHALL BE ADJUSTED
TO COMPENSATE FOR DEAD LOAD DEFLECTION, VERTICAL CURVE ORDINATE, AND
ACTUAL BEAM CAMBER.
IN SETTING FALSEWORK AND FORMS FOR REINFORCED CONCRETE SPANS, AN
AND PERMANENT CAMBER WHICH SHALL BE PROVIDED FOR IN ADDITION TO THE
ELEVATIONS SHOWN. AFTER REMOVAL OF THE FALSEWORK, THE FINISHED STRUCTURES
SHALL CONFORM TO THE PROFILE AND ELEVATIONS SHOWN ON THE PLANS AND
CONSTRUCTION ELEVATIONS FURNISHED BY THE ENGINEER.
INDICATED ON THE PLANS. WHEN BAR SUPPORT PIECES ARE PLACED IN CONTINUOUS
LINES, THEY SHALL BE SO PLACED THAT THE ENDS OF THE SUPPORTING WIRES SHALL
BE LAPPED TO LOCK LEGS ON ADJOINING PIECES.
STRUCTURAL STEEL:
SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE
EQUIVALENT AREA PROVIDED THESE PLATES ARE AT LEAST 5/16" IN THICKNESS AND
DO NOT EXCEED A WIDTH EQUAL TO THE FLANGE WIDTH LESS 2" OR A THICKNESS
EQUAL TO 2 TIMES THE FLANGE THICKNESS. THE SIZE OF FILLET WELDS SHALL CONFORM
ELECTROSLAG WELDING WILL NOT BE PERMITTED.
ROUNDED BY SUITABLE MEANS TO A RADIUS OF APPROXIMATELY 1/16 INCH OR
ETC. IN CASTING SUPERSTRUCTURES:
ALLOWANCE FOR DEAD LOAD DEFLECTION, SETTLEMENT,
DEFLECTIONS ARE DIMENSIONS AT CENTER LINE OF BEARING UNLESS OTHERWISE NOTED
REINFORCING STEEL:
WIRE BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE
EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER
WITH THE SOLE EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER
AT THE CONTRACTOR'S OPTION, HE MAY SUBSTITUTE 7/8" ~ SHEAR STUDS FOR THE
STUDS FOR 4 - 3/4" ~ STUDS. STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST
ALONG THE BEAM AS SHOWN FOR 3/4" ~ STUDS BASED ON THE RATIO OF 3 - 7/8" ~
BE PROVIDED. THE MAXIMUM SPACING SHALL BE 2'-O".
THE RATE OF 3 - 7/8" ~ STUDS FOR 4 - 3/4" ~ STUDS, AND STUD SPACING CHANGES
SHALL BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVALENT NUMBER OF 7/8" ~ STUDS
PLATE IS IN CONTACT WITH BEARING PLATE, THE CONTRACTOR MAY, AT HIS OPTION,
OR METALLIZING.
EQUIVALENT FLAT SURFACE AT A SUITABLE ANGLE PRIOR TO PAINTING, GALVANIZING,
STRESS IN EXTREME FIBER OF
IMPACT ALLOWANCE
LIVE LOAD - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - -
27,000 LBS. PER SQ. IN.
20,000 LBS. PER SQ. IN.
DESIGN DATA:
SPECIFICATIONS - - - - - - - - - - - - - - -
MATERIAL AND WORKMANSHIP:
UNLESS OTHERWISE REQUIRED ON PLANS, CLASS A CONCRETE SHALL BE
CONCRETE:
1,800 LBS. PER SQ. IN.
EQUIVALENT FLUID PRESSURE OF EARTH - - - - -
(MINIMUM)
30 LBS. PER CU. FT.
375 LBS. PER SQ. IN.- - - -OF TIMBER
COMPRESSION PERPENDICULAR TO GRAIN
PROVISIONS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH
TOP CORNERS OF CURBS MAY BE ROUNDED TO 1-1/2" RADIUS WHICH IS BUILT
INTO CURB FORMS; CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS
SHALL BE ROUNDED WITH A 1/4" FINISHING TOOL UNLESS OTHERWISE REQUIRED
ON PLANS; AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES
CONCRETE IN COMPRESSION
CONCRETE IN SHEAR - - - - - - - - - - - - -
- - - - - - - - - - 1,200 LBS. PER SQ. IN.
SEE A.A.S.H.T.O.
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIAL
N. C. DEPARTMENT OF TRANSPORTATION.
USED FOR ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THAT:
CLASS AA CONCRETE SHALL BE USED IN BRIDGE SUPERSTRUCTURES,
CONCRETE CHAMFERS:
UNLESS OTHERWISE NOTED ON THE PLANS, ALL EXPOSED CORNERS ON
STRUCTURES SHALL BE CHAMFERED 3/4" WITH THE FOLLOWING EXCEPTIONS:
AND TOPS OF CURBS AND SIDEWALKS SHALL BE ROUNDED TO A 1/4" RADIUS
WITH A FINISHING STONE OR TOOL UNLESS OTHERWISE REQUIRED ON PLANS.
GRADE 60 24,000 LBS. PER SQ. IN.
REINFORCING STEEL IN TENSION
27,000 LBS. PER SQ. IN.
- -
SURFACES,ALL SHARP EDGES AND ENDS OF SHAPES AND PLATES SHALL BE SLIGHTLY
- - - - -
ALLOWANCE SHALL BE MADE FOR DEAD LOAD DEFLECTIONS, SETTLEMENT OF FALSEWORK,
TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS " BRIDGE WELDING CODE".
BETWEEN BEARINGS TO COMPENSATE FOR DEAD LOAD DEFLECTIONS, VERTICAL CURVE
ƒ" ~ STUDS SPECIFIED ON THE PLANS. THIS SUBSTITUTION SHALL BE MADE AT
STRUCTURAL STEEL - AASHTO M270 GRADE 36 -
- AASHTO M270 GRADE 50W -
- AASHTO M270 GRADE 50 -
ABUTMENT BACKWALLS, AND APPROACH SLABS; AND CLASS B CONCRETE SHALL
BE USED FOR SLOPE PROTECTION AND RIP RAP.
ALL REINFORCING STEEL SHALL BE DEFORMED. DIMENSIONS RELATIVE TO
PLACEMENT OF REINFORCING ARE TO CENTERS OF BARS UNLESS OTHERWISE INDICATED
IN THE PLANS. DIMENSIONS ON BAR DETAILS ARE TO CENTERS OF BARS OR ARE OUT
TO OUT AS INDICATED ON PLANS.
SEE A.A.S.H.T.O.
SEE PLANS
A.A.S.H.T.O. (CURRENT)
UNTREATED - EXTREME FIBER STRESS
STRUCTURAL TIMBER - TREATED OR
BE HOT ROLLED.
STEEL SHEET PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL
FALSEWORK OR FORMS IS STARTED.
BE SUBMITTED TO THE ENGINEER FOR APPROVAL BEFORE CONSTRUCTION OF THE
AND ANY STRUCTURE OR PARTS OF A STRUCTURE AS NOTED ON THE PLANS SHALL
DETAILED DRAWINGS FOR FALSEWORK OR FORMS FOR BRIDGE SUPERSTRUCTURE
RAIL SHALL BE SET NORMAL TO THE GRADE OF THE CURB, UNLESS OTHERWISE SHOWN
METAL STANDARDS AND FACES OF THE CONCRETE END POSTS FOR THE METAL
HANDRAILS AND POSTS:
SPECIFICATIONS ARTICLE 105-4.
OVER NOTES HEREON, AND SPECIAL PROVISIONS SHALL GOVERN OVER ALL. SEE
GOVERN OVER THE SPECIFICATIONS, BUT THE REMAINDER OF THE PLANS SHALL GOVERN
GENERALLY, IN CASE OF DISCREPANCY, THIS STANDARD SHEET OF NOTES SHALL
SPECIAL NOTES:
ON PLANS. THE METAL RAIL AND TOPS OF CONCRETE POSTS USED WITH THE ALUMINUM
RAIL SHALL BE BUILT PARALLEL TO THE GRADE OF THE CURB.
THE 2018 ``STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES" OF THE
DOWELS WHEN INDICATED ON PLANS AS FOR CULVERT EXTENSIONS, SHALL
DOWELS:
BE EMBEDDED AT LEAST 12" INTO THE OLD CONCRETE AND GROUTED INTO
PLACE WITH 1:2 CEMENT MORTAR.
STANDARD NOTES
S-42
42
DATE:
NOT BE ACCEPTED. CERTIFIED MILL REPORTS ARE REQUIRED FOR METAL RAILS AND POSTS.
BE OBTAINED. CASTINGS WITH DISCOLORATIONS OR OF NON-UNIFORM COLORING WILL
REMOVED IN A MANNER SO THAT A UNIFORM COLORING OF THE COMPLETED CASTING SHALL
FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR OTHERWISE SHALL BE
AS MANUFACTURED FOR BRIDGE RAILING. CASTINGS SHALL BE OF A UNIFORM APPEARANCE.
METAL HANDRAILS SHALL BE IN ACCORDANCE WITH THE PLANS. RAILS SHALL BE