HomeMy WebLinkAbout20050415 Ver 1_Complete File_20050215Quible
0 ?r 4 5
IQuible & Associates, RC.
ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING
SINCE 1959
February 14, 2005
Mr. Tom Steffens
Division of Water Quality D
943 Washington Square Mall
Washington, NC 27889 FEB
Z 5 2005
DENR_
Re: BeDaybeacon #9 lhaven Waterfront, Beaufort County, North Carol na STORMW ER B94NCH
Mr. Steffens:
P.O. Drawer 870
Kitty Hawk, NC 27949
Phone: 252-261-3300
Fax: 252-261-1260
PRINCIPALS
Sean C. Boyle, P.E.
Joseph S. Lassiter, C.E.P.
Eduardo J. Valdivieso, P.E.
ASSOCIATES
Joseph J. Anlauf, P.E.
Katherine C. Ma.hello, P.L.S.
David S. Neff
A Sedimentation and Erosion Control Plan has been submitted for land disturbing activities at the proposed
Daybeacon #9 (formerly Seafood Safari) development in Belhaven, Beaufort County, North Carolina. Several
buildings on site have already been demolished and now the next phase of work is to remove the impervious concrete
foundations along the waterfront at the former Seafood Safari complex. The remaining demolition work includes
land disturbance within the 50 feet Tar-Pamlico Buffer.
A sedimentation and erosion control plan has been submitted to Land Quality and was returned with a request for
additional information. The additional information requested was a letter or e-mail of approval from the Division of
Water Quality to proceed with land disturbance within the 50 feet Tar-Pamlico Buffer. Joe Lassiter reportedly met
with you on site and discussed the removal of the concrete and impervious surfaces. Based on Joe Lassiter's account
of the on site meeting, you agreed that the proposed removal of the impervious surfaces within the buffer would be
allowable. Please note, the planned development does not include any impervious surfaces within the 50 feet Tar-
Pamlico Buffer.
Sedimentation and erosion control measures at the site include the erection of a silt fence along the current rip-rap
and concrete bulkhead alignment. Copies of the Sedimentation and Erosion Control Plan have been included along
with the relevant plats showing the formerly existing site conditions.
Please contact Maria Rogerson with the Division of Land Quality in reference to this project. Conversations with
Ms. Rogerson indicate she requires written approval from DWQ to approve the work within the 50 feet Tar-Pamlico
including the erection of a silt fence.
As stated above, demolition work has already begun at the facility. Therefore, your prompt attention in this matter is
greatly appreciated. Please do not hesitate to contact the undersigned at 252.261.3300 if you have any questions or
require additional information in this matter.
Sincerely,
Quible & Associates, P.C.
adu
Warr Eadu
cc: Mr. John Domey
file
enc
Vv
,^0c`?
Quible
iQuible & Associates, P.C.
ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING
SINCE 1959
January 25, 2005
Mr. Pat McClain
NC DENR Division of Land Resources-Land Quality Section
943 Washington Square Mall
Washington, NC 27889
Re: Daybeacon #9, Belhaven, Beaufort County, NC
Sedimentation and Erosion Control Plan
Io C e p
FEB 1 5 2009
IDENR • WATER (11s, LI Y
Dear Mr. McClain: V"DS AND STORMWAI ER BRANCH
P.O. Drawer 870
Kitty Hawk, NC 27949
Phone: 252-261-3300
Fax: 252-261-1260
PRINCIPALS
Sean C. Boyle, P.E.
Joseph S. Lassiter, C.E.P.
Eduardo J. Voldivieso, P.E.
ASSOCIATES
Joseph J. Anlaut P.E.
Katherine C. Marchello, P.L.S.
David S. Neff
Please find enclosed a Financial Responsibility/Ownership Form and site plan with details for
Sedimentation and Erosion Control at the proposed Daybeacon #9 2.19 acre parcel located at 213 Water
Street Belhaven, NC. Land disturbance at the property includes the removal of all of the existing gravel,
asphalt and concrete. Demolition of the buildings on site has already begun. Currently, a Major CAMA
Permit is being sought for the development of the property. Please note, for many years rubble has been
placed along the water's edge at the facility. The rubble bulkhead will be pulled back and removed from
the landward edge of the normal water line. The developers plan to construct a bulkhead in place of the
rubble bulkhead that exists now. No excavations will take place below the water line.
The entire area of disturbance is equal to approximately 95,182.44 square feet or 2.19 acres. This 2.19
acre area is the entire site. Proposed sedimentation and erosion control measures include the erection of
- a silt fence around the entire property with two gravel construction entrances. Once the site is cleared of
all concrete, asphalt and building materials it will be graded level and then seeded according to the
specifications outlined on the attached details sheet.
Please do no hesitate to contact the undersigned at 252.261.3300 if you have any questions or comments
in this matter.
Sincerely,
Quible & Associates, P.C.
garradus'
cc: Dixon-Hoyle Partnership
file
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land-disturbing activity on one or more acres as covered by the Act before this form
and an acceptable erosion and sedimentation control plan have been completed and approved by the Land
Quality Section, N.C. Department of Environment and Natural Resources. (Please type or print and, if the
question is not applicable or the e-mail and/or fax information unavailable, place N/A in the blank.)
Part A.
1.Project Name PAfyc*coo :k9
2. Location of land-disturbing activity: County ?64VPoF_T" City or Township W 671- "CM
Highway/Street 3l (o INa7?FP 5 T-Latitude 35-x13a,1/43 014 Longitude W" 37 ` t 9.55- W
3.Approximate date land-disturbing activity will commence: Fjew_yW-D..r/ 1+ u?oti M*"Vm_.
4.Purpose of development (residential, commercial, industrial, institutional, etc.): 'W5 tDeEM fti_
5.Total acreage disturbed or uncovered (including off-site borrow and waste areas): Z .1 R
6.Amount of fee enclosed: $ la-a. oo . The application fee of $50.00 per acre (rounded up to
the next acre) is assessed without a'ceiling amount (Example: a 9-acre application fee is $450).
7.Has an erosion and sediment control plan been filed? Yes No Enclosed ?
8.Person to contact should erosion and sediment control issues'arise during land-disturbing activity:
Name ou- uL?Tu? c,y/P E-mail Address 2
Telephone Z 5 2 941 - Z / f a Cell # Fax # ?L `?`?/ ' g Zoq
9.Landowner(s) of Record (attach accompanied page to list additional owners):
tl-o o -- 144 k t_g fw-roey-gi P Z 6"2 . g41. 7-110
Name Telephone Fax Number
(o 130X 132
Current Mailing Address Current Street Address
tj64S l#Eit? NL Z'495`7
City State Zip City State Zip
10.Deed Book No. 1406 Page No. o f v S Provide a copy of the most current deed.
Part B.
1.Person(s) or firm(s) who are financially responsible for the land-disturbing activity (Provide a
comprehensive list of all responsible parties on an attached sheet):
Name
T_0 Dox (32li
Current Mailing Address
N k4 5 /VC_ 27"
City State Zip
E-mail Address
Current Street Address
City State Zip
Telephone Fax Number
3. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address
of the designated North Carolina Agent:
Name E-mail Address
Current Mailing Address Current Street Address
City State Zip City State Zip
Telephone Fax Number
(b) If the Financially Responsible Party is a Partnership or other person engaging in business under an
assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible
Party is a Corporation, give name and street address of the Registered Agent:
Name of Registered Agent E-mail Address
Current Mailing Address Current Street Address
City State Zip City State Zip
Telephone Fax Number.
The above information is true and correct to the best of my knowledge and belief and was provided
by me under oath (This form must be signed by the Financially Responsible Person if an individual
or his attorney-in-fact, or if not an individual, by an officer, director, partner, or registered agent with
the authority to execute instruments for the Financially Responsible Person). I agree to provide
corrected information should there by any change in the information provided herein.
Sk if ti lxc>N _V_
Type or print name Title or Authority
?t-
Signature
I,
Notary
Seal
Date
a Notary Public of the County of
State of North Carolina, hereby certify that appeared
personally before me this day and being duly sworn acknowledged that the above form was
executed by him.
Witness my hand and notarial seal, this day of , 20
My commission expires
r S('ot/efoe'a P*&-1r o/V t-- (6c
?,aSTt?s?
?s
State of North Carolina
Department of Environment and Natural Resources
Washington Regional Office
Mchael F. Easley, Govemor DIVISION OF LAND RESOURCES William G. Ross, Jr., Secretary
LAND QUALITY SECTION
February 8, 2005
REQUEST FOR ADDITIONAL INFORMATION
Quible and Associates, PC
ATTN: Mr. Warren Eadus
P.O. Box 870
Kitty Hawk, North Carolina 27949
Project Name: Daybeacon #9
Project No.: Beauf-2005-012
Location: 316 Water Street - Beaufort County
Drainage Basin: Tar-Pamlico
Submitted on Behalf Of. Dixon-Hoyle Partnership
Date Fee Received by Land Quality Section: January 31, 2005
Dear Sir:
This office received the erosion and sedimentation control plan and your check/money order no.
6675 in the amount of $ 150.00.00 as the plan review fee for the referenced 2.2 acre project. To expedite
the approval process, this office has performed a preliminary review of the erosion and sediment control
plan. We have determined that additional information, as indicated on the attached checklist, must be
submitted. To meet our review schedule, the additional information should be received by this office no
later than January 16, 2005. The receipt of additional information does not ensure approval of the plan.
Failure to meet the deadline stated previously may result in disapproval of your plan. Please be advised
that a civil penalty of up to $5000 per day could be assessed for failure to obtain approval of the erosion
and sediment control plan prior to starting this land-disturbing activity.
If this project is in a coastal county, it is also subject to the Environmental Management
Commission`s review regarding implementation of stormwater controls and may require a permit prior to
commencement. It is suggested that you contact Mr. Bill Moore at (252) 946-6481 for information
regarding stormwater approval.
If you have questions, please do not hesitate to contact me.
Sincerely,
Uf"4 0,4A6 .
Maria A. Rogerson, E.I.
Assistant Regional Engineer
Cc: Dixon-Hoyle Partnership, ATTN: Mr. Skip Dixon, P.O. Box 1327, Nags Head, NC, 27959
943 Washington'Square Mali, Washington, North Carolina 27889 Telephone 252-?46-6481, FAX 252-975-3716
An Equal Opportunity Emplayeer 50%recyde&1G6A poe-consumer paper
PROJECT NAME: DU_tX aa'V -W 9
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
LAND QUALITY SECTION
PRELIMINARY REVIEW CHECKLIST EROSION & SEDIMENTATION CONTROL
PLAN
To expedite the approval process, a cursory review of your submitted Erosion Control
Plan has been made and has shown the need for additional information as specified
below. Upon receipt of the required information, a detailed review of the plan will be
made and an approval or disapproval will be issued.
A vicinity map in sufficient detail to allow for timely location of the site
A North Arrow and Scale
A completed signed and notarized Financial Responsibility/Ownership form. The
deed book and page number for the recorded instrument proving ownership must
be included. The form MUST be signed by the owner/developer, registered
agent, attorney-in-fact, or executive officer of the firm paying for the
development. The registered agent must be registered with the office of the
Secretary of State of North Carolina.
Name, address and phone number of person to handle resolution of erosion
control problems on the site during construction.
Runoff calculations, based on a 10-year peak storm event, must be provided.
The calculations must provide both the quantity and velocity of runoff in each
ditch, channel or swale section and each pipe outfall. Offsite drainage, if flowing
through this project, must be included in the runoff calculations.
The limits of disturbance need to be clearly indicated
The watersheds for each pipe, ditch, swale and channel section must be clearly
shown and identified on a revised drawing to correspond with the calculations.
A construction entrance pad must be shown on revised drawing. The pad is to
be located at each point of project egress to a paved public road.
The topographic information for this site is illegible/not provided. Submit
readable copies/revised drawings showing existing and proposed topography.
General sequence of construction activity with emphasis on minimizing erosion
control problems.
Narrative description of project and erosion control plan objectives.
--2-
Name and classification of receiving water course or name of municipal operator
(only where stormwater discharges are to occur)
A typical cross-section or construction drawing for the following must be
provided:
Project Roads
Ditch, channel and/or swale
Sediment Basin or check dam
Silt fence installation
Temporary sediment protection for catch basin, curb or drop inlet
Pipe energy dissipators (aprons)
Ditch, swale, or channel liners
Construction entrance pad
Lakes, ponds, dikes, berms, etc.
Other:
Locations and proposed treatments of offsite borrow or waste areas
V Note to be included on plans stating- Provide a groundcover on exposed slopes
within 15 working days or 30 calendar days (whichever is shorter), following
completion of any phase of grading; and, a permanent groundcover for all
disturbed areas within 15 working days or 90 calendar days (whichever is
shorter) following completion of construction or development.
Seasonal seeding and mulching specifications, both temporary and permanent,
including rate and time of application
An apparent buffer encroachment subject to the Neuse River Riparian Area
Protection and Maintenance Rule (15A NCAC 2B .0233) is shown on the plan
submitted. Encroachments on the protected buffers require written approval by
the Division of Water Quality (DWQ). A copy of your DWQ approval or statement
of exemption from the rule is required.
An apparent buffer encroachment subject to the Tar-Pamlico River Riparian Area
Protection and Maintenance Rule (15A NCAC 213 .0259) is shown on the plan
submitted. Encroachments on the protected buffers require written approval by
the Division of Water Quality (DWQ). A copy of your DWQ approval or statement
of exemption from the rule is required.
Other:
PROMPT ATTENTION TO THE CHECKED ITEMS WILL BE APPRECIATED
Quible
iQuible & Associates, P.C.
ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING
SINCE 1959
February 10, 2005
Ms. Maria Rogerson, E.I.
Division of Land Resources
Land Quality Section-WaRO
Washington, NC 27889
Re: Beauf-2005-012
Ms. Rogerson:
DEB ? ? 2aa5
S 1G4??`VVA7 ER BRANCH
VVE'T?REDS AND
P.O. Drawer 870
Kitty Hawk, NC 27949
Phone: 252-261-3300
Fax: 252-261-1260
PRINCIPALS
Sean C. Boyle, P.E.
Joseph S. Lassiter, C.E.P.
Eduardo J. VaIdIvIeso, P.E.
ASSOCIATES
Joseph J. Anlauf, P.E.
Katherine C. Marchello, P.L.S.
David S. Neff
The proposed land disturbing activity at the Daybeacon #9 in Belhaven, North Carolina will include the
removal of all concrete, asphalt and existing drainage structures as shown on the previously submitted
plat. This includes all of the inlets and culverts shown. Thank you for your prompt attention in this
permitting matter.
Please do not hesitate to contact the undersigned at 252.261.3300 if you have any questions or comments.
Sincerely, .
rre dus
Confirmation Report- Memory Send
Date & Time: 02-10-2005 10:59am
Tel line 2522611260
Machine ID QUIBLE&ASSOCIATES
Job number 544
Date & Time 02-10 10:58am
To 12529753716
Number of pages 002
Start time 02-10 10:58am
End time 02-10 10:59am
Pages sent 002
Status OK
Job number 544 SEND SUCCESSFUL
i(
Q- TIBLE Sz 0,
ASSOCIATES, p_C.
It:ngfneerfnag - Planning - Environmeatml Sciences - Surv?
rtnca 1959
FACSTM?T .E TRANSMITTAL
TO:
IAA T?-+ : Z`GO m ? TOTAL NuNII3L?R OF PAGES: 2_-
(including this page)
AS REQUESTED NERD RESPONSE A.S.A.P.
?FOR YOUR INFORMATION PLEASE PFIONE TO DISCVSS
FOR REVIEW AND COMP/I33NT PLEASE SIGN AND RETURN
FOR CONSIDERATION AND PLEASE REPLY VIA FA7C
APPROVAL I'LBASH REPLY VIA MAiL
COMME'NT.s:
!as ?is??ss
?1'UTT F pT, ON LII[Ijr
T y
Tho in£orTnation contained in this Facsimile transmittal is privileged and eoatidential, aad is intended For The
addressce only. Iryoti era neither the intended recipieat aor the employee or agont responsible For
delivering tlt is massage to Ste intended recipiont, any disalosnre of this iafOnziation is strictly prol?tibited. if'
You have recoived this transmittal in error, please. notiry the pers.- --smitting the information
immediately -L return The trA,?°^?ission to tho Arm aet out above immediately.
8 Juaip?r 'Trai{l
Post OfFica IDraawer 870
IGitty 1Fiawlc, North Carolina 27949-0870
Plaone: (252) 261-3300 I aLm: (252) 261-1260
E-Mail: giti6la@earthlialc.net