Loading...
HomeMy WebLinkAboutNC0026271_Regional Office Historical File Pre 2018 (123)i DIVISION OF ENVIRONMENTAL MANAGEMENT. June,6, 1996 N.C. DEPT. OF ENVIRONMENT, HEALTH, & NATURAL RESOURCES MEMORANDUM JUN 10 1996 M. D. Rex GleaROM: Jacquelyn M. NoDIVISION OF ENY?80t1':tENTAI 41AId,16EtAENT MOO�RESYttLE RE61ORAL OFFICE TB RU: Donald L. Si;; Ruth SwanekaC. Carla Sanderson SUBJECT: Instream Assessment for SOC 67(b) Request Taylorsville WWTP (EMC WQ # 96-12) , NPDES Permit No. NCO026271 Alexander County Summary and Recommendation The Instream Assessment Unit has reviewed the request for an instream assessment for the Taylorsville WWTP. The Town is requesting a Special Order of Consent (SOC.) during improvements to the wastewater treatment plant. The existing design flow is 0.430 MGD, and there are future plans.for expansion to 0.830 MGD. The total requested SOC flow is 170,000 GPD, which includes excess inflow/infiltration (IM occurring at the plant for a total SOC flow requested -limit of 0%600 MGD. The SOC limits requested are BOD5 = 45 mg/1 and TSS of 45 mg/l. The results -of the Level B'model analysis indicated that according to the EMC 67 (b) criteria, the predicted. dissolved oxygen concentration in the Lower Little River was not significantly affected by the. additional flow. The EMC 67 (b) criteria, which states that the discharge will not decrease the DO minimum by more than 0.5 mg/1 or will not extend the stream lengthof the DO minimum below the standard by more than OS miles, was .not violated. with the addition of 170,000 GPD. ;;Our analysis determined that the facility can accept the additional flow under the requested, SOC -limits. Background The Town of Taylorsville:discharges into:the Lower Little River in the Catawba River Basin and has a stream classification of C. The summer.7Q10 flow has been estimated using USGS regression. equations tobe 14 cfs with an average flow of 88 cfs,.. A review of compliance evaluation data shows that -from January 1995 to February 1996, Taylorsville has had:.six contraventions of -the flow limit, three contraventions of the BOD5 limits and one of the TSS -limit. This seems.to be a continuation of historical problems the plant has had meeting these parameters. The yearly average wasteflow of the plant is OA315 MGD, Which. exceeds the.design-capacity. Instream Assessment for Spruce Pine SOC page 2 Analvsis and Discussion An instream assessment was performed using the Level B model framework The Carolina Glove Co. (0.015 MGD, BOD5 = 30 mg/1), is located 1 mile upstream of the Taylorsville WWTP and was included at the beginning of the .model. The current design flow of the Taylorsville WWTP is 0.430 MGD, however the yearly average now of 0.4315 was used as the pre-SOC flow. The post SOC flow is 0.6015 MGD, which allows for 170,000 GPD of I/L The SOC limits recommended at 0.6015 MGD are 45 mg/l of BOD5 and 45 mg/l of T.SS. Two models were run at the flows of 0.4315 and 0.6015 MGD. Waste inputs into the models for the Taylorsville plant included 90 mg/l CBOD (45 mg/1 * 2.0) and NBOD of 80.1 mg/1(existing NH3 limit of 17.8 mg/l * 4.5). The model results predict the DO minimum of 7.43 mg/1 to occur at the Carolina Glove outfall. However, the difference of predicted DO at the Taylorsville. outfall at the SOC flows were 7.76 and 7.61 mg/l, respectively. This is a difference of 0.15 mg/1 in -the instream DO levels and does not demonstrate a significant depression of the instream DO level .per 67(b) criteria. Recommendation Based on the model results, the Instream Assessment Unit recommends approval of the 170,000 GPD of additional wasteflow for the Taylorsville WWTP and the SOC limits of 45 mg/l of BOD5 and 45 mg/l of TSS. All other permitted limitations, and effluent and instream monitoring requirements shall remain the -same as in the current NPDES permit. cc: Dianne Wilburn Central Files WLA File Table 1. Instream Assessment Summary for the Town of Taylorsville Design Capacity 0.4300 MGD Pre-SOC Flow 0.4315 MGD SOC Flows Requested 0.1700 MGD Pre-SOC + SOC Flows 0.6015 MGD Model Input Summary Headwater conditions: s7Q10 flow 14 cfs w7Q10 flow 25 cfs Average flow 88 cfs Design Temperature 25 °C CBOD 2.0 mg/l NBOD 1.0 mg/l DO (90% saturation) 7.44 mg/l Wastewater Inputs: Pre- SOC Wasteflow 0.4315 MGD Requested SOC Wasteflow(s) 0.1700 -MGD Recommended SOC Wasteflow(s) Q.6015 MGD CBOD '90 mg/l NBOD 8.0.1 mg/l Model Output Summary Qw DO Net Distance DO Net (MGD) min. Change <5.0 mg/l Change (mg/1) (mg/l) (mi.) (mi.) 0.4315 7.76 NA 0.0 NA 0.6015 7.61 0.15 0.0 0.0