Loading...
HomeMy WebLinkAboutNCG500323_Regional Office Historical File Pre 2018 (75)Shurtaer PRESSURE SENSITIVE pAPES 25 August 2003 Certified Mail Return Receipt Requested Annual System Performance Report North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, North Carolina 27699-1617 AND RESOURCES OFFICE Subject: Annual System Performance Report NPDES Permit No. NCO072664 Shurtape Technologies, Inc. — Stony Point Plant Alexander County �. puG � 6 2003 iERQUA�\�'l �ancOE �' ��piscbat9eCom4 Attached please find the annual performance report for the subject facility owned by Shurtape Technologies, Inc. Please be advised that this report has been prepared in accordance with the format suggested in Kerr T. Stevens' 19 October 1999 letter. I. General Information a. Name of Regulated Entity: Shurtape Technologies, Inc. b. Contact: Mark E. Hawes, P.E. PO Box 1530 Hickory, NC 28603-1530 Phone: 828-322-2700, extension 4428 e-mail: mhawes()shurtape.com C. Permit: NCO072664 d. Description of treatment process: Shurtape Technologies operates a 10,000 gpd extended aeration type WWTP to treat domestic wastewater generated by Shurtape's Stony Point Tape Plant. The extended aeration plant consists of an inlet bar screen, aeration basin, hopper type clarifier w/ a multiple v-notch type weir, tablet -type chlorination, and an aerated sludge holding tank. Discharge of the treated wastewater is into Third Creek in the Yadkin -Pee Dee River Basin. To optimize the operation of the WWTP, Shurtape has implemented in-house testing of MLSS in the aeration basin and grab TSS in the effluent. II. Performance a. Description of overall 12-month performance: The previous twelve months performance was reviewed with the ORC, Mr. Travis Brannon, Certificate No. 25140. Review of the system performance consisted of reviewing the operator's logbook, process control equipment calibration logbooks, sludge removal records, and DMR's from July 2002 through June 2003. During this time period, no effluent violations occurred. During this time period all process control monitoring equipment was found to have meet calibration checks with the exception of the residual chlorine meter on 27 February 2003 (see note below); all buffer solutions used for pH meter calibrations were valid; and all sampling results have attached chain of custody forms. The operator logbooks verified that the system had been attended as required with maintenance activities performed. Shurtape Technologies, Inc. 0 PO Box 1530 • Hickory NC 28603-1530.828.322.2700 • Fax 828.322.5583 - www.shunape.com Annual System Performance Report 25 August 2003 Page 2 of 2 A review of the DMR found the residual chlorine value reported on 27 Pebruary 2003 had no verifiable calibration data. Note, there is no substantial difference in values in calibrations noted before and after this date. The July 2002 DMR will be amended to correct an error in reporting the DO value on 31 July 2002. The value reported was 6.35 mg/1. The value recorded in the ORC's logbook was 6.32 mg/1. The value recorded in the ORCs logbook will be inluced in the amended DMR. During the time period of July 2002 through June 2003 no effluent violations occurred. c. Description of any known environmental impacts of violations: N/A - No known violations of effluent limitations. d. Description of corrective actions taken to address violations or deficiencies: During the 4 October 2002 inspection conducted by Mr. Wes Bell of the Mooresville Regional Office 2 issues were found that required correction. The Chlorine Contact Chamber/Settling Basin had excessive solids build up. The corrective action was to pump the'solids from the basin and maintain a solids level in this basin of less than 12 inches. This method was discussed with Mr. Bell and approved by him as well. During the inspection it was noted that the Chlorine tablets in use were not approved for wastewater disinfection. The corrective action consisted of obtaining chlorine tablets approved for wastewater disinfection and using only tablets approved for wastewater disinfection. Tablets approved for wastewater disinfection were ordered. They were received on site on 16 October 2002. No other deficiencies were noted or observed. e. Shurtape has met the requirements to conduct analysis of field parameters on site through Lab Certification Procedures. Lab Certification No. 5087 EPA Lab ID No. NC01311 Performance Audit Conducted on 13 July 2003. Confirmation results received 13 August 2003. III. Notification Shurtape's WWTP serves the manufacturing facility at Stony Point. There are no other users connected to the system. Therefore, Shurtape is the only user of the system A copy of this report is sent to the Vice President of Manufacturing and the Executive Vice President. IV. Certification I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or. persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, luding the possibility of fines and imprisonment for knowing violations. ZS p David Neff Date Plant Manager t Annual System Performance Report 25 August 2003 Page 2 of 2 Upon review of this report, should any questions arise, please contact me at (828) 322-2700, extension 4428 or via e-mail at mhawes(iNhurtape.com. Respectfully Submitted, Mark E. Hawes, P.E. Director of Environment and Safety Cc: Wayne Helton David Neff Donnie Mayhew Wayne Roberts Travis Brannon Check List for Annual'WWTP Certification for DWQ For NCO072664 Date: 25 Ao&-,S-r '(�5 name j1,7eReviewed By: � .#IqK E, Shurtape Technologies, Inc. Stony Point - Plant # 31 Company Contact DMR Review: Sample Results Reviewed for each Week and the Attached Chain of Custody Forms January V!, July Januaryoe- JulyFebruary'�3 oIL AugustFU9 February'[63 64- August` p\L. March! 3��IL September'do, oK March'E O September`s2 OIL April 12% chL October V,2 plL, April r 3 0JIL October` v K May 163 6f- November May 03 o!L Novembers ol�_ June W5 o/L- December' o IL June V3oiE December' Z or_ .3k Sludge Records Reviewed: o z l2 o t l l 02 1011 oZ pH Meter Calibration pH Buffers Checked: 4 Exp Date: tp_pa. Dates: 1_1l-05 7 Exp Date:_p 10 Exp Date: 4 -p�- Parameters samples ?c�c %�D for On -Site: �� sn _ E � d 0 ti Frequency of Calibration Checks Meters ,upJ UsedOn 5l oo Site: Calibration &14 --7-tl-ts Logs Maintained: semi- Summary of ORC Log Book Review: - AtAn t ' 1� rc �1 Til vL �J1 ` Low fboW- uu6 ocD V clk_-�Q oP- (a. S Z d- vC,,L-.1_ • E5100 e4* .0Vz%61E C;-o L-1 Fa;S - CcuW Nwxr yLI"D 60PAD►Zn" t.18eAr-RoL3s, CJ�i-t �rL$'r�o►.1.5 ot.s. Z¢ it �3 5 4ko�ci Ft�o 'lto►.� Summary of Review: G O GG GYTTS 10C- Evi�1.c1� cSreG 4-0 5 c. G e_1 a eJJ9?cal / Ile L E64Y'8 fbCPr JJ� ZIM a• aWTE /jC-b /W 44za 64-1-156447®xl D n►11651AJ , rleld Parameters Lab Certification No.: 5087 EPA Lab Code: NCO1311 Annual Performance Audit Completed: 1.3 Z01,4 2co3 Page 1 of 1 08/25/2003 C