Loading...
HomeMy WebLinkAboutNC0072664_Regional Office Historical File Pre 2018 (50)Vshurtape 8 February 2011 Certified Mail Return Receipt Requested Annual System Performance Report North Carolina Division of Water Quality 1617 Main Service Center Raleigh,. North Carolina 27699-1617 RECEIVED DIVISION OF WATER QUALITY MAR 14 2011 SWP SEC noi?l MOORESVILLE REGIONAL OFFICE Subject: Annual System Performance Report - CY2010 NPDES Permit No. NCO072664 Shurtape'Technologies — Stony Point Plant Alexander County VD M FEB 15 2011 Attached please find the annual performance report. for the subject facility owned by Shurtape Technologies: Please be advised that this report has been prepared in accordance with the format suggested in Kerr T. Stevens' 19 October 1999 letter. I. General Information a. Name of Regulated Entity: Shurtape Technologies b. Contact: Mark E. Hawes, P.E. PO Box 1530 Hickory, NC 28603-1530 Phone: -828-322-2700, extension 4428 e=mail: mhawes@shurtgpe.com Permit: NCO072664 d. Description of treatment process: Shurtape Technologies operates a 10,000 gpd extended aeration type WWTP to treat domestic wastewater generated by Shurtape's Stony Point Tape Plant. The extended aeration plant consists of an inlet bar screen, aeration basin, hopper -type .clarifier with a v-notch type weir, tablet -type chlorination; chlorine contact chamber, tablet de -chlorination, and ari aerated sludge holding tank. Discharge of the treated wastewater is into Third Creek in the Yadkin -Pee Dee River Basin: To optimize the operation of the WWTP, Shurtape conducts process testing of MLSS, MLVSS, and settleability in the aeration basin. II. Performance a. Description of overall 12-month performance: The previous twelve months performance was reviewed with the ORC, Mr. Travis • • • Brannon, Certificate No. 990808. Review of the system performance .consisted of .reviewing the operator's logbook, process control.equipment calibration logbooks, sludge removal Shurtape Technologies, LLC PO Box 1530 Hickory, NC 28603 www.shurtape.com Annual System Performance Report 8 February 2011 Page 2 of 3 records, :and DMR's from January 2010 through December 2010. During this time period, no effluent violations occurred. During this time period, all process control monitoring .equipment was found to have met calibration checks unless further described .herein. Buffer solutions used for pH meter calibrations were valid; and all sampling results have attached chain of . custody forms. The operator logbooks verified that the system had been attended as required with maintenance activities performed. During 2010, there were no events noted in the logbook that would cause the facility to operate in a non -compliant manner. The facility operated in compliance. b. Duringthe time period of January 2010 through December 2010 no effluent violations occurred. C. Description of any known, environmental impacts of violations: N/A —No known violations of effluent limitations. d. Description of corrective actions taken to address violations or deficiencies: No known violations existed for the reporting period. e. Shurtape has met the requirements to conduct analysis of field parameters on site through Lab Certification Procedures. f. Lab Certification No. 5087; EPA Lab ID No. NC01311 Proficiency testing was completed during May 2010. The approval report was issued 17 June 2010. g. Notification: Shurtape's WWTP serves the manufacturing facility at Stony Point. There are no other users connected to the system. Therefore; Shurtape is. the only user of the system. A copy of this report is sent to the Vice President of Manufacturing and the Executive Vice President. III. Certification I certify, under penalty of law, that this document and all attachments were prepared under my .direction or supervision in accordance with a system designed to. assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge:and. belief, true, accurate, and complete.:I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. _ a r David Neff / Da e Plant Manager Annual System Performance Report 8 February. 2011 Page 3 of 3 Upon review of this report, should any questions arise, please contact Mark Hawes at (828) 325=5428 or via e-mail at mhawes@shurtapejL"dri'iq"ocj-,. ctfull Submitted Rese'9°°°�°°°° p. Y�,°°° 14, Jerry W. Eplin, P.E. Environmental & Process Engineer cc: Wayne Helton Stephen Shuford David Neff Mark Hawes Matt Moore Doug Hall Travis Brannon 2010 Plt 31 Check List for Annual WWTP Certification for DWQ Shurtape Technologies, LLC For NC0072664 Stony Point - Plant # 31 Date: 8-Feb-11 . name signature Reviewed by: Jerry W. Eplin l Environmer tal'Eng. Certified by: Dave Neff Plant Manager Travis Brannon ORC ORC: DMR Review: Sample Results Reviewed for each Week and the Attached Chain of Custody Forms January .:OK July..: OK January OK "idly OK February OK . August OK February'. OK _" August _ OK March OK. September OK _-, ,.- March_. OK.. September OK April OK October OK April OK October OK.. May OK November::... OK May OK November OK June OK December ..OK ",.., : June' OK .. December OK Sludge Records, Reviewed: 16 March 2010 - 2000 gal; 26 April 2010 - 2000 gal; 7 May 2010 = 4000 gal; 23 September 2010 - 2000 gal PH BUFFERS METER CALIBRATIONS . Date Receivedi . 9/9/2010 pH / Temp. Meter Meter 226683 8-Jan-10 5-Jul-10 28-Dec-10 wq External Calibration 4 Date Opened: 11/29/2010 Dates: Meter 226875 10-Jul-10 10-Jan-11 Exp Date: Jul-14 :Meter 8-Jan-10 ...5-Jul-10 DO/Temp. Meter 09D100202 Meter External Calibration Date: .:Date Received: 9/9/2010. 10-Jul-10 28-Dec-10. 08A100904... ... _. Date Opened: 11/15/2010 #1 10-Jul-10 28-Dec-10 pH Buffers Checked: 7 Hach Tensette Pipettes Exp Date: = Jul-12 " #2 "Not Yet 28-Dec-10 Purchased Date Received: 9/9/2010 NIS:T Thermometer WN 3037 5-Jul-10 28-Dec-10 10 Date Opened: 1/8/2011 Low Level, Meter 5-Jul-10 28-Dec-10 " See "comment Spectrophotometer 051000007985 Exp Date: Jul-11 High Level,'Meter 5-Jul-10 10-Jan-11 External Calibration Date: .... 0402000105s7 The available pH 10 buffer bottle was not opened or used until Jan 2011. No prior buffer bottles (i.e. Comment about Buffers: CY2010)"were available for review. Operator records indicate valid buffer use during 2010. Chlorine Reagents: Hach ultra low range chlorine buffer and DPD indicator were each found to be recevied: 17-Nov-10; Opened: 22-Nov-10, Expiration: September 2011. DPD Chlorine Secondary Standard Xits were verified 28-Dec-.10 and 10-Jan-11. PH, Residual CIZ, : N _ WEML55, MLV55 Parameters samples for On- u a� Site: Dissolved Oxygen g o E pH; & DO ". . _.. U Temperature a1° 30 Minute Settleability Frequency of Calibration Checks Corning 313 5/N 226683 = pH & Temperature N Coming 313 S/N 220875 - pH &Temperature o. v YSI 550A 5/N'08A100904 - DO & Temperature, J °� Minimum of annual external Meters Used p o Yes - all meters On Site: Y5I 550A S/N 09D100202 - DO &TemperatureIii calibrated. calibrations, see above for HACH 2400 S/N 05000007985 Spectrophotomete n`_ 1 dates. HACH Pocket Colorimeter II 5/N.040200010597 f0 U ERTCO NIST Traceable Thermometer 5/N 3037 Summary of.ORC Log Book Review: Logbook is up to date with appropriate notations of actions by ORC and back-up ORC. Logbook appears to contain all operational information required to demonstrate compliance.. Dates and times appear to be noted correctly. Information in logbook corresponds to that recorded on the DMRs submitted throughout :CY2010. Annual Performance Test for Field Parameters: pH: Method 4500 H+B & TRC: Method 4500 CIG. Corning pH_& YST DO meters both have correction factors noted on meters (current factor:is. "0"). This review was completed on Jan 21 2011 Field Parameters Lab Certification No.: 5087 EPA Lab Code: = NCO1311 Annual Performance Audit Completed: 1/21/2011 "