Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout20090186 Ver 1_Time Ext Request_20100325March 25, 2010
From: James O./Sandra L. Turpin
Crawford
UT to Dan River [030201,22, (l ),C,TRI
PO Box 1049
King, NC 27021
To: Cyndi Karoly, Supervisor
NC DENR
Division of Water QL!asity
401 Oversight/Express Review Pen- sting iJnit
1650 Mail Service Center
Raleigh, NC 27699-1650
Dear Ms. Karoly,
Thank-you for the time °xtension granted January 29`"' to pursue storm,
management solutions and options for Crawford Danb??ry.
We have considered different type bridges and have received pricing and planning
on two. We are currently pricing a steel bridge structure and are waiting for
relating constriction costs. We thought we'd have a price by now but all bids have
not been submitted.
Therefore, we are requesting a seconc three :month extension to f_naiiZe ozlr plans.
Thank-you for your consideration,
Best Regards,
Sandra L. Turpin
Cc: Sue Homewood, DWQ Winston-Salem Regional Office
Eddie H. Bunn,P.E.,P.L.S.